Loading...
HomeMy WebLinkAboutResolutions - R-12-012 - 05/07/2012 - IDOT MFT 2012 STREET RESURFACINGj itnlPJlt Resolution for Maintenance of 111Inor R-12-012 �� Streets and Highways by Municipality of Tran�ortation Under the Illinois Highway Code BE IT RESOLVED, by the Council of the City of (Cityjewa-er YiNa§e) (Council Illinois, that there is hereby (Name) appropriated the sum of $559,000.00 of Motor Fuel Tax funds for the purpose of maintaining streets and highways under the applicable provisions of the Illinois Highway Code from January 1, 2012 (Date) to December 31, 2012 BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described on the approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates approved in connection with this resolution, are eligible for maintenance with Motor Fuel Tax funds during the period as specified above. BE IT FURTHER RESOLVED, that the Clerk shall, as soon a practicable after the close of the period as given above, submit to the Department of Transportation, on forms furnished by said Department , a certified statement showing expenditures from and balances remaining in the account(s) for this period; and BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this resolution to the district office of the Department of Transportation, at Schaumburg Illinois. Janice Jones Clerk in and for the of McHenry , County of McHenry hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the Council at a meeting on May 7, 2012 (Council nF PFRF d... t ARd RnRFFI of T- . s cc) IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this 7th day of (SEAL) Date May 2012 City Clerk (City, Taws oFVillage) Date Department of Transportation Printed 4/24/2012 BLR 14230 (Rev. 11/06) Illinois Department of Transportation Maintenance Engineering to be Performed by a Consulting Engineer (to be attached to BLR 14231 or BLR 14221) Local Agency CITY OF MCHENRY Section Number 12-00000-01-GM The services to be performed by the consulting engineer, pertaining to the various items of work included in the estimated cost of maintenance operations (BLR 14231 or BLR 14221), shall consist of the following: PRELIMINARY ENGINEERING shall include: Investigation of the condition of the streets or highways for determination (in consultation with the local highway authority) of the maintenance operations to be included in the maintenance program: preparation of the maintenance resolution, maintenance estimate of cost and, if applicable, proposal; attendance at meetings of the governing body as may reasonably be required; attendance at public letting; preparation of the contract and/or acceptance of BLR 12330 form. The maintenance expenditure statement must be submitted to IDOT within 3 months of the end of the maintenance period. ENGINEERING INSPECTION shall include: Furnishing the engineering field inspection, including preparation of payment estimate for contract, material proposal and/or deliver and install proposal and/or checking material invoices of those maintenance operations requiring engineering field inspection, as opposed to those routine maintenance operations as described in Chapter 14-2.04 of BLRS Manual, which may or may not require engineering inspection. For furnishing preliminary engineering, the engineer will be paid a base fee PLUS a negotiated fee percentage. For furnishing engineering inspection the engineer will be paid a negotiated fee percentage. The negotiated preliminary engineering fee percentage for each group shown in the "Schedule of Fees" shall be applied to the total estimated costs of that group. The negotiated fee for engineering inspection for each group shall be applied to the total final cost of that group for the items which required engineering inspection. In no case shall this be construed to include supervision of contractor operations. SCHEDULE OF FEES Total of the Maintenance Operation Base Fee ®> $20,000 $1.250.00 ❑ <$20,000 (Negotiated: $1,250 Max. PLUS Group Prelimina Enqineerinq Engineering Inspection Operation to be Acceptable Fee % Negotiated Fee % Acceptable Fee % Ne otiated Fee % Inspected I NA NA NA NA NA IIA 0 0 % 0 111 o a By: By: ocal Agency n ial ignature Ci y Cl rk Title May 7, 2012 Date "5% of final construction cost; also includes Materials Testing 3/19/2012 Dale P.E. License Expiration Date Printed 4/24/2012 BLR 05520 (Rev. 12/06111) �j Illinois nsporDepaent rtm Tratation Municipal Estimate of Maintenance Costs Section Number 12 - 00000 - 00 - GM Period from 01/01/2012 to 12/31/2012 Municipality CITY OF MCHENRY Estimated Cost of Maintenance Operations Maintenance Operation (No. —Description) Group (I,II,III,N) For Group I II or III Material E ui ment or Labor Operation Cost Item Unit Quantity Unit Price Cost 1. Contract Resurfacing IV $662,731.00 Section 12-00000-01-GM Total Expenditure of Motor Fuel Tax Funds shall not exceed $559,000. The balance will be paid with other City funds. Total Day Labor Costs 1 $662,731.00"' Total Estimated Maintenance Operation Cost Preliminary Engineering $27,760 Engineering Inspection $33,140 Material Testing Total Estimated Engineering Cost $60,900 1 Total Estimated Maintenance Cost $723,631.00 Submitted: May 7, 2012 Approved: Date By: C M icipal Offs ' Title Submit Four (4) Copies to Regional Engineer Page 1 of 1 Printed on 4/24/2012 3:09:04 PM Regional Engineer BLR 14231 (Rev. 2/23/06)