HomeMy WebLinkAboutOrdinances - ORD-09-1480 - 08/31/2009 - APPROVE CORE DOWWNTOWN SUB-AREA PLANOrdinance No. ORD-09-1480
An Ordinance Authorizing the Adoption of the
Core Downtown Sub -Area Plan
for the City of McHenry
WHEREAS, it has been determined by the Mayor and City Council of the City of
McHenry to establish a Core Downtown Sub -Area Plan in and for the City of McHenry;
and
WHEREAS, a public hearing before the Planning and .Zoning Commission was
conducted on July 9, 2009, whereat the public was provided an opportunity to hear
testimony and present questions and comments and offer testimony regarding the
proposed Core Downtown Sub -Area Plan; and
WHEREAS, the Planning and Zoning Commission voted unanimously to support
the adoption of the Core Downtown Sub -Area Plan as presented
NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF
THE CITY OF MCHENRY, as follows:
SECTION 1: The Mayor and City Council of the City of McHenry concurs with
the Planning and Zoning Commission and find that the attached Exhibit "A", Core
Downtown Sub -Area Plan, be and is hereby adopted by the City of McHenry and is
hereby incorporated in the Appendix of the City of McHenry Comprehensive Plan.
SECTION 2: This ordinance shall be in full force and effect from and after its
passage by the corporate authorities.
PASSED and APPROVED this 31" day of ,August, 2009.
Ayes: SANTI, GLAB, SCHAEFER, MURGATROYD, WINMER, PETERSON, CONDON
Nays: NONE
Abstained: NONE
Not Voting: NONE
Absent: NONE
ATTEST:
City 1 k
Mayor
Core -Downtown
Sub -Area Plan
City of McHenry
M
Prepared By:
Deputy City Administrator, Douglas Martin, AICP
City Planner, Kimberly Kolner
This document was created by the
City of McHenry
Community Development Committee and
Construction and Neighborhood Services Department
For additional information
please call
815.363.2170
CITY OF MCHENRY
Core -Downtown Sub -Area Plan
2009
Table of Contents
Chapter i Introduction..................................................................... 4
LocationMaP.......................................................................................................4
Chapter 2 Core -Downtown Vision ..................................................... 5
ExistingLand Use Map.............................,..........................................................6
Chapter 3 Public Participation and the Planning Process ................ 7
SWOTanalvsis.................................................................................................... 8
Walking Survey Results....................................................................................... 9
Chapter4 Evolution of Downtown .................................................... 10
Chapter 5 land Use and Development Needs ................................... 12
Future Land Use Plan.........................................................................................15
Chapter 6 Streetscape Improvements................................................16
Chapter 7 71'ransportation Circulation and Parldng Improvements.. 18
ParkingCount Plan............................................................................................. 20
Chapter8 Implementation............................................................... 21
3
The core downtown sub -area is encom-
passed by Green Street, Illinois Route 120,
Riverside Drive and extends north and
south of Illinois Route 12o and east to the
Fox River. The core downtown sub -area is
defined by its proximity to the water and
capitalizing to the fullest extent on this ter-
rific natural resource. In addition, the core
downtown includes many opportunities for
investment and redevelopment.
The vision and goals derived from this plan
were formulated through a citizens' input
process and the basis of the goals are de-
rived from the values expressed by
McHenry citizenry through that process.
The specific goals of the plan are outlined in
Chapter 2, Core Downtown Vision.
Al
It is our challenge as a community then to bring back and reconnect McHenry as one thriving
downtown. As explained in Chapter 4, The Evolution of Downtown, the vision to ultimately
realize, is one that brings downtown back to what it once was, a bustling center of activity for
the community. This would allow the downtown to endure the ups and downs in the market
place, as well the different trends that come and go, and to remain the viable self-sustaining
central core of the community.
The Core Downtown Sub -Area Plan' s vision focuses on the following central concepts: sustain -
ability, walkability, connectivity, livability and establishment of a friendly place for children
and families alike. The Plan seeks to find ways of maintaining the area's quaintness and
charm, historical character and integrity and pedestrian orientation.
4
The Core Downtown Sub -Area Plan is a statement of expectations and confidence. It is a real-
istic assessment of the problems that face McHenry's central community. It also identifies a
series of development opportunities which, if pursued, will transform the downtown area into
an exciting place for people to live, as well as work, shop and enjoy entertainment. Every
downtown plan has a vision and a vision statement which encompasses the primary values of
the community for its downtown.
The following Core Downtown Sub -Area goals will assist in realizing this vision and imple-
menting the major development proposals contained in this Plan:
• Create and develop downtown as a "central place" as the physical and
social heart of the community;
• Enhance retail, restaurant and entertainment facilities and build -on and
complement what already exists;
• Integrate transportation networks, including: pedestrian, bikes, traffic,
parking and transit;
• Enhance and encourage public buildings and cultural facilities in the
downtown;
• Encourage additional downtown housing and mixed -use development
opportunities;
• Improve the streetscape along Illinois Route 120 to make this stretch of
roadway more pedestrian -friendly;
• Consider traffic -calming measures on Green Street to allow people to
feel free to utilize the Riverwalk as well as existing businesses;
• Link the core downtown to the Main Street Historic District and Main
Street area of downtown;
• Identify opportunities for competitive economic investment -particularly
along the Riverwalk;
• Work with the businesses of Green Street to formm, a common association;
• To identify and recognize sustainable assets in the Core Downtown Sub -
Area; recognize how asset -synergy can be maximized, remove barriers
that hinder asset -synergy, and institute strategies; for sustainability.
5
I Existing Land Use Map I
A
Mixed -Use f Vacant Li
Retail Parks
Service Office
Multi Fam Res Industrial
Attached Res 1 1 Other
Single Fam Res Alley/Part
One of the goals at the outset in creating a plan for the Core Downtown Sub -Area was to engage
the local citizenry and gain meaningful public input throughout the entire course of the plan-
ning process.
Two community design workshops were held and began with a SWOT (strengths, weaknesses,
opportunities and threats) Analysis. Those results are included within the body of this plan.
Following, the groups discussed the overall vision for the Core Downtown Sub -Area. In addi-
tion, workshop participants provided numerous recommendations for improving downtown
through a mapping exercise. Participants mapped -out and provided a visual representation on
what improvements/land uses they would like to see and where. From the workshop results,
the Committee and Staff were able to refine the comments into goals and objectives.
As part of phase II of the public participation process, in January 2009 staff conducted walking
surveys of people using the downtown area, either workers or patrons of one of the many shops
or restaurants. The surveys were intended to reflect the -views of the people that actually use
the area and incorporate the findings into the plan. The purpose here was also to capture peo-
ple who didn't necessarily attend the workshop meetings and may not live in the area. Those
results are also included in the body of this plan. The last step in the public participation proc-
ess was a public hearing before the Planning and Zoning Commission. The purpose of the pub-
lic hearing was to give the public a proposed finished product, in the form of a written and vis-
ual plan for the Core Downtown Sub -Area.
_,., i Cr
s,v C c BU angs
I.
m
rnall Town rcial Activit
Banks Ping/ treets aere
Y
CK'alkability Pe
ks vents hosted in the do
ralised �'ntoti n
Ne mPl eted Ri v
w Busines erwa1k
CCapitalise ors ses
)nvenrants old buildings and Nis
MOre public tore tOric Dist
RenOvateent Piers ford
0�'ntown r
public Ever,
restore esidents
en hostDo ding A cessr fOrArts ed uwntog facades
Repeat o Bike path
Public
Mixed Us Bull rtatio
Nance Pedestrian Ac Trolley
V `' t>*V Access
Incree�ion ase DensitY
En of
CI tp- ainin e Do wn to
ea Air nt wn
'as
T ranspOr tat
aalie t PboatYstem
Vaation part park,,g
1. place to be meat Rel cation
ep ofB o
Afore parks G esses a
/tree nd Res
In F11 fitgEncourae Otiyner oc Spa ca ce/Recle urants
Cultur Renovate/ a torethe area1ed housing
n
a1 Center/C unity dilapidated
aeatej Uild-
/Per o Ing s
Arts
Parking
Build ings/fa��a
anitati des need
Trafc onn DePartrnen d reStOrat]on
Lack ofpa Rt. 120 and RLOCation
Lack of attract. rking Enforceme i
ped d to clean/c rns/No draw t
Need f ran crossing of BOOne Creek
Lack o f InOre piers 120
tra Se
S Me
g age Visitors Center
eto the area
ale nsRetails hgars need' rs to be
No Sense of Place uniform
E onomytOrefronts
Disco
nn
DilaAidatedected DOh'ntotl.
Resistance to buildings n Area
Lack
a f f, Metra S al/ch�inge
dable Re COmrnercialisati ntal e to the area
ea
Big Box Bus' ono v
Bikes and neSses erQuaintess
skateboards on
the Rive
rwalk
Govekranbl itY/Pedestria
Clean eparkicentivesfriendly
Bike
Somme Taxi link to larger Sys
ten,
ater Re g to dra w trn
Quai ntal/ LV PeOPle
°son
chi
ntnes ater Recreation
Fcut harm n
ra Tffic Calmingren and Families
Riverside Elm Street/Route 120 Greet Street
what 1>rLngk ya.t0-th& dcwYxaw w?
Dentist II Shopping Shopping
Lunch & Wine store
Work IIIII 1
Laundry
Work 11111
Insurance
Work IIIII II
Lunch
Fwhat
pla cea-/atore%do- yaul g& to- whevv �vv
the/ dow►stow w?
Restaurants II
All of them II
Trendsetters II
Wind Hill III
None
Some other Nuts III
Fox Hole
Restaurants
Bank III
Bimbos II
Stuc's
White River Junction III
Little Chef II
Benjamin Moore
Resale - Pink Door
After the Fox
Antique Shops
Thai Restaurant II
Corkscrew Point
Resale Shops
Bookstore 1111
Shop-n-go II
Bakery
Green Street Cafe
Trading Post
Concerts in the Park
Stores/Shops
Restaurants
Tres Belle Boutique
Riverside Bakery
Riverside Bakery III
Barkery
Church
(McHenry Favorites
Barkery III
(Little Chef
Wonder Bread
Minute Man Press
Joev T's
— what d o- your thy. Lk cot d & 1ev i nV rovedl Lw thee, areal?
Parking III
Traffic
Snow removal II
More independent local stores II
Improve Historic Fagade's II
Beater Press coverage
Uniform business hours
Needs a draw
1st Generation New Clolhes
Too much Resale
S. Riverside homes are dilapidated
Connect the 3 downtowns
Riverside drainage
More events
Short & Long term goals for area
The crosswalk button on Riverside
Drive is not working. Add
timers onto crosswalks
like in Chicago
McHenry IIIII III
Johnsburg II
Parking II
Traffic II
Snow removal
Needs an old style Hardware Store
Improve Historic: Fa4ades
Better Press coverage
More Ads in the paper
Venice connection to Green Street
or Riverside Drive
Italian Theme on Venice
Sidewalks/Streetscape II
Downtown Newsletter
City Newsletter Online
where) arm yaw fra tm?
McHenry IIII
Woodstock
South Elgin
Roselle
Wauconda
Parking 1111
Traffic IIII
Snow Removal II
More independent local stores IIII
Improve Historic Facades
Better Signage II
Uniform Business Hours
Needs a draw
Building maintenance
More foot traffic
Outside Seating at restaurants
Better mix/balance of retail
McHenry IIIII I
Crystal Lake II
Lakemoor
Johnsburg
The Core Downtown Sub -Area is undergoing a transition, what once was a bustling center of
activity has become somewhat of a ghost town. With the development and subsequent success
of the north Route 31 (Richmond Road) shopping corridor, downtown has taken a back seat.
The Richmond Road Shopping Corridor has pulled some of the life away from downtown.
Downtowns across the United States (McHenry included) have experienced or are experiencing
a transition, redevelopment, revitalization, to bring back what once was. This chapter will ex-
amine the evolution of downtown McHenry, the importance of downtown to the community as
a whole and what problems have plagued downtowns across the nation.
Downtowns are historically located along rail corridors, waterways or other means by which
goods and services are produced and transported. The Core Downtown Sub -Area grew along a
body of water called the Fox River, while another portion of McHenry's downtown grew along a
rail corridor. The first McHenry County seat was located in the Core Downtown Sub -Area on
Riverside Drive, formerly Water Street in 1837. Water Street became one segment of down-
town McHenry while Centerville, now Green Street, was the second. A 6o-acre mill pond cre-
ated by Daniel Owen, who operated a gristmill and sawmill along Boone Creek, lied between
Centerville and West McHenry, formerly Gagetown, or the third component of the City's down-
town.
With the arrival of the railroad in i854
Gagetown grew and expanded with busi-
ness after business choosing to locate on
this stretch of dirt road (Picture-i). This
expansion and growth also spread to the
Centerville and Water Street areas of
downtown, with businesses locating and
experiencing a vast amount of public
support. Train riders came to McHenry
to get away from the urban fast pace and
to enjoy all that this river town had to
offer.
Picture-1
The mill pond became a recreation destina-
tion of sorts, with people boating, fishing
and swimming during the summer months
(Picture-2). Landmark School, constructed
in 1894, was the central gathering place for
schoolchildren both primary and secondary
in McHenry until McHenry High School on
Green Street was constructed in 1924
(Pictures-3 on opposite page).
Downtown brought people together, served
as the focal point of the community's identity
and espoused the historical and cultural val-
ues of the people during that time period.
10
In the early loth century, Water Street now
Riverside Drive was a hub of activity with peo-
ple enjoying the Fox River or having lunch at a
local eatery (Picture-4). The Riverside Hotel,
circa 1869, featured different forms of enter-
tainment which attracted additional people to
this area (Picture-5) and along Green Street
people could enjoy various farming equipment
on display at the William Stoffel Implement
Company (Picture-6) (Machaj, Landen Sandra
Images of America McHenry and McCullom
Lake).
The following are problems which have af-
flicted older downtowns across the United
States.
• The first is the change in markets,
the evolution of the big box retailer
and internet sales.
• Downtown has become congested
with traffic and parking within the
downtown does not meet the de-
mands of our auto -dominant soci-
ety;
• Obsolescence has taken its toll on
older historic structures and the lack
of investment in downtown build-
ings is coming full circle;
Picture-3
Picture-4
• Infrastructure has aged and the mix
of land uses has been altered. Office
and service uses have overtaken re- '
tail as the primary users in the
downtown area; Picture-5
• Aesthetic issues and the lack of a
unified marketing effort between
businesses to promote the down-
town have resulted in a decrease in
business for downtown business
owners (Pointner, "Pete" N.J. Plan-
ning (connections Human, Natural
and Man Made .
People identify with a downtown and the his-
tory associated with it. A downtown is and al-
ways will be the heart and soul of the commu-
nity.
Picture-6
11
In order to maintain, as well as increase, its viability and sustainability the Core Downtown Sub
-Area Plan needs to adopt a land use pattern which consists of a diversity of land uses and key
areas for development and redevelopment. One of the primary land use goals of this plan is to
bring people back to the downtown, visiting, shopping, eating, recreating and living. Currently,
the Core Downtown sub -area contains a variety of land uses, including: retail, office, residen-
tial, restaurant and service uses (see Existing Land Use Map).
For planning purposes, the Core Downtown Sub -Area has been divided into three functional
areas:
• West of Green Street and south of Illinois Route 120;
• East of Green Street and south of Illinois Route 120; and
• North of Illinois Route 120.
Each of these areas can be considered separately and then tied together. In addition, another
goal of the Core Downtown Sub -Area is to functionally link the core area of downtown
(including Green Street and Riverside Drive) to the Main Street area of downtown. This physi-
cal separation does present challenges in planning for a unified downtown.
The Fox River and Boone
Lagoon connect the Green
Street and Riverside Drive
areas of the Core Down-
town sub -area. In addi-
tion the pedestrian bridge
provides a physical con-
nection from the River -
walk along Green Street to
south Riverside Drive
(Picture-7). This connec-
tion point is the key physi-
cal link to these two
streets but how do Green
Street and Riverside Drive
relate and how are they
connected to the Main
Street, old West McHenry
area of downtown?
Picture-7
As depicted by the future land use map, the area west of Green Street or the "Historic" section
of the Riverwalk contains residential, civic, commercial, as well as public land uses. The key
parcels include the McHenry Savings Bank property and the Sullivan/Vazzano Property. Both
of these properties will define this area. In addition, the old Pearl Street Bridge will be placed
across Boone Lagoon irk this section. This will serve as an important physical connection be-
tween the McHenry Savings Bank Property and the Sullivan/Vazzano properties.
12
Landmark School is designated as a future tourism
and visitors' bureau (Picture-8). This is an important
physical historical structure in the City and will serve
as the future gateway and physical link to the City's
Historic District and West McHenry.
East of Green Street and south of Boone Lagoon is the
"Residential" portion of the Riverwalk. This is evident
in all of the proposed future residential land uses in
this corridor. In the future, when the central waste-
water treatment plan is abandoned, the wastewater
property will be the marquee property of this area.
Potential redevelopment of this property should in-
clude public and private land use types to draw people
to this beautiful peninsula.
Picture-8
Like the wastewater treatment plant site the historic Dobyn's property is designated for mixed -
uses which include: residential, retail, restaurant and potentially an arts and entertainment
center. In addition the historic Dobyn's property will serve as a premier public gathering
space. Along with the planned Riverwalk is an area designated for future open space with vari-
ous amenities to be located on the point of the property. The areas adjacent to the lagoon serve
as the primary residential living areas for future downtown residents.
In order to maintain a balance of land uses, a thriving sustainable downtown needs some non -
retail users to generate a working population base within the downtown.. The two block area
between Riverside Drive and Court Street south of Illinois Route 12o has been designated as
professional offices. In addition, the recommendations that Park Street south of Illinois Route
120 is vacated and Venice Ave. be extended through to Riverside Drive are included. This al-
lows a potential developer to construct a downtown office park of sorts with on -site parking.
The areas directly adjacent to Green Street east and
west are designated for local retail and restaurant users.
The existing users can be complemented with new us-
ers. It should also be stressed that the McHenry Down-
town Theater is a staple in the downtown area and is
recommended to stay downtown (Picture-9) to allow
day and night traffic to utilize downtown and also spur
complimentary businesses to the downtown area.
Picture-9
Planning area three, located north of Illinois Route 120, can best be described as an area in
transition. A variety of land uses currently exist including: offices, retail, mixed -uses and ser-
vice -oriented uses, all interspersed with single-family residential and attached residential. The
area north of Illinois Route 120 will most likely not vary much from what it is now to five years
13
from now. The area along Riverside Drive and to some extent along Pearl Street between Riv-
erside Drive and Park Street should remain local retail and restaurant -type land uses. Cur-
rently, there are mixed -uses and service uses along these areas; but in a viable and sustainable
economy, these areas should be retail in nature and the non -retail service -based uses and resi-
dential should be concentrated along Park Street and Court Street.
In addition, Green Street north of Illinois Route 120 can sustain additional non -service based -
uses but these should be limited to a couple of retail businesses, mixed -use or restaurant uses.
In order to have a sustainable downtown, a variety of land uses properly located is required.
Because the area is in transition the ideal land use pattern is not currently evident and is de-
picted through the hodge-podge nature of development north of Illinois Route 120.
One of the challenging properties located in this sub -area is the property at the northeast cor-
ner of Pearl Street and Richmond Road (Illinois Route 31). The reason this property poses a
unique challenge is because of its proximity to downtown, its location along a major roadway
and the fact that it lies in the middle of what is an older McHenry neighborhood. The future
land use map designates this area as attached residential. The land use on this property needs
to dictate the land use pattern traveling north on Richmond Road to Washington Street prior
to entering the City's major retail district.
Planning area three is and will continue to be an area in transition, which is in contrast to the
area south of Illinois Route 120 which has more opportunities for redevelopment and reinvest-
ment and may spur similar redevelopment north of Route 120 in the future.
14
sX,
Appropriate streetscape improvements provide a pleasant and unified pedestrian shopping en-
vironment in downtown areas and are another key aspect to maintaining sustainability in the
downtown area. Key aspects of a streetscape program include: sidewalks, landscaping, light-
ing, way -finding signage and street furniture. Building fagade improvements are also an inte-
gral part of a streetscape planning system. How a building relates to the street is very impor-
tant to downtown development and redevelopment and encouraging pedestrians to utilize a
downtown is vital. Buildings closer to the street with the parking in the rear are considered
more pedestrian -friendly than buildings setback from the street with parking in front. This
type of development will not facilitate drawing people to a downtown and walking, but encour-
ages people to drive from store to store which does not make for a healthy and sustainable
downtown area.
While there are multiple pedestrian crossings on Green Street, due to all the traffic, drivers are
not overly willing to stop and allow people to cross. This problem is not uncommon within a
downtown as most downtowns have been designed with the automobile and not the pedestrian
in mind. This poses an inherent problem in attracting people to the downtown area and mak-
ing them feel safe within the downtown, and measures should be considered as potential solu-
tions.
One such solution is to improve the streetscape along Green Street to promote a more pedes-
trian -friendly atmosphere. Potential improvements may include: increasing street plantings,
designing building facades with a pedestrian focus, or pushing buildings towards the street.
Neumann Park, located on the east side of Green Street south of Illinois Route 120, is currently
an underutilized asset which has the potential of becoming a key gathering space along Green
Street.
In addition to Green Street, Elm Street (Illinois Route 120), which connects Green Street to
Riverside Drive, is also very automobile -dominant. The stores along this stretch suffer heavily
because a pedestrian -oriented focus is lost amidst the traffic congestion. Similar streetscape
improvements should be considered along this section of Illinois Route 120, with a potential
solution being a wall or physical separation between the pedestrian and traffic along Route 120
to create that sense of physical separation between the sidewalk and roadway areas. This
physical separation will allow pedestrians to feel more safe and comfortable in shopping along
this corridor.
Off-street parking will increase the viability of these businesses because parking on a state
highway is not seen as a particularly safe thing to do. If the on -street parking is eliminated, the
sidewalk could potentially be expanded which would again give this perception of safety to pe-
destrians patronizing the businesses along this stretch of roadway. Further, additional street
plantings and/or planters should be considered as a means of breaking up the concrete. The
same streetscape-type improvements should be considered along Riverside Drive.
In addition to the streetscape improvements suggested, one of the other concerns expressed
through the planning process was way finding signage. This includes a signage program that
clearly delineates parking areas and different parts of the downtown. By implementing a com-
prehensive signage program within the downtown, motorists that do travel in automobiles can
easily be guided to appropriate parking areas.
16
<�3 s
+
Efficient traffic movement within the downtown is crucial so as not to allow the automobile to
be the primary presence. In order for a downtown to remain sustainable efficient transporta-
tion, circulation, parking and pedestrian movement is required. Downtown roadways which
are characterized as heavily traveled at all times of the day will negate pedestrian traffic par-
ticularly in a suburban context. In a major city downtown roadways are expected to be highly
utilized but at the same time they are designed to be this way. A suburban downtown setting
like McHenry does not have roadways which are designed to accommodate constant traffic
flow.
The existing Core Downtown sub -area circulation pattern is characterized by two-way down-
town streets bisected b;y a five -lane state east -west highway (Illinois Route 120). Illinois Route
120 is a major east -west state arterial which links McHenry County to Lake County. The aver-
age daily traffic along this roadway is approximately 24,000 vehicles (2004 traffic counts).
Currently, Green Street is characterized as a major north -south arterial in the City of McHenry
which connects the City's two primary east -west arterial roadways, Charles Miller Road and
Illinois Route 12o. The average daily traffic along Green Street is approximately 8,000 vehicles
(2004 traffic counts).
In 2011, the intersection of Richmond Road (Illinois Route 31) and Elm Street (Illinois Route
120) will be improved, with lane widening and multiple turn lanes. In addition, the City is
planning an eastern by-pass which includes improving the intersection of Bull Valley Road and
Front Street (Illinois Route 31) east to Illinois Route 120. With these two traffic improvements,
the congestion on Green Street will most likely be reduced. This is a result of vehicles not
choosing Green Street.. from Charles Miller Road on the south to Illinois Route 120 on the
north as somewhat of a cut -through to avoid the Charles Miller Road Bridge over the Fox
River. In addition once Illinois Route 120 is improved drivers will not as frequently cut -
through from Front Street to Green Street to avoid the long delays now associated with the in-
tersection of Illinois Route 12o and Illinois Route 31 (Richmond Road).
The Core Downtown Sub -Area is serviced by two Pace bus routes, Routes 8o6 and 807, in addi-
tion to Dial -A -Ride service. The Metra commuter rail station is located outside of the Core
Downtown sub -area, in the Main Street sub -area which is an additional reason why linkages to
all portions of McHenry's downtown areas are so important.
Regardless of future policies relating to auto access and parking, the importance of maintaining
an efficient public transportation system cannot be overstated. If the downtown is to grow pro-
fessionally and residentially, commuter bus service is a necessity, particularly service to the
Metra commuter rail station on Main Street.
In addition to transit non -vehicular circulation is another important element of the Core
Downtown sub -area's development and future sustainability. In 2004, the City of McHenry
adopted a bike and pedestrian pathway system plan. Included as a recommendation within the
plan is a bike and pedestrian pathway along Green Street, Pearl Street and Riverside Drive in
the downtown area. In addition, a path on the south side of Millstream Drive ending at Illinois
Route 120 is planned. A potential future link to the downtown is along the north side of Boone
Lagoon, extending from Illinois Route 12o and Millstream Drive to Riverside Drive.
While the McHenry Riverwalk is planned along the south side of Boone Lagoon, a bike path
only on the north side of the lagoon would serve as a functional link from the City's master
18
planned pathway system to the Core Downtown sub -area. Further, a bike path link should also
be provided from Green Street to the central wastewater treatment plant once it is redeveloped.
This would be constructed along Waukegan Road, which will require widening and future im-
provements, and provide a functional link to a future area with public open space and access to
the Fox River.
There needs to be some attention paid to pedestrian crossings at major intersections, particu-
larly Illinois Route 12o and Richmond Road (Illinois Route 31), Illinois Route 12o and Green
Street, as well as Illinois Route 12o and Riverside Drive. This was one of the major comments
during the public hearing for the Bicycle and Pedestrian Pathway Plan in 2004. If pedestrians
and bicyclists do not feel a sense of security while crossing major downtown intersections, this
will greatly inhibit that type of traffic flow to the Core Downtown sub -area.
Attached is an existing public parking map for the Core Downtown sub -area. The map indi-
cates the future availability of public parking on the Riverwalk Center and City Center proper-
ties. While public parking currently exists on the City and McHenry Savings Bank properties,
this area will most likely redevelop in the future causing the need for this parking to be relo-
cated. The City purchased the old Wahl Appliance building property off of Court Street for a
future parking area. This parking will be crucial if and when the downtown theater expands.
Parking on Riverside Drive south of Illinois Route 120 will become a bigger issue as that area
redevelops. Consideration should be given to a surface parking area or parking deck, on the
west side of Riverside Drive at Venice Avenue. North of Illinois Route 120 in the Riverside
Drive area poses a challenge for locating a segregated parking area. While there is a City lot
behind the businesses on the west side of Riverside Drive, additional parking will be required if
this area is to remain viable in the future.
In order to eliminate on -street parking on Illinois Route 12o additional parking in close prox-
imity to that area must be provided for these businesses to remain successful. One way to pro-
vide additional parking in the area north of Route 120 is to convert Court Street and Park
Street into one-way streets. This would allow additional parking in close proximity to the busi-
nesses along Illinois Route 12o, as well as to the area close to Veterans Memorial Park and the
businesses along Court Street and Park Street.
The conversion of Park Street and Court Street to one-way streets may not eliminate the need
for an additional surface lot in this area; however, it will go a long way in delaying that pros-
pect. Additional surface parking north of Illinois Route 120 should be considered as part of a
redevelopment; otherwise the only other alternative is to purchase a property outright.
19
20
An effective implementation program is required in order for any plan to be successful. The
Core Downtown Sub -Area Plan is no different. Any successful implementation program in-
cludes the following:
• Public participation and support of the plan;
• Plan review authority and sound planning process;
• Defensible and sound comprehensive plan and municipal zoning ordinance;
• A planning and zoning commission which understands their role and responsibilities;
• Political fairness of planning and zoning commission recommendations by elected offi-
cials;
• Professional staff to interpret goals and objectives; and
• A process to monitor, evaluate and amend plan elements based upon future develop-
ment and input from all parties involved, elected and appointed officials, staff and the
general public (Pointner).
Another important element of a successful implementation program is maintaining the integ-
rity of a plan. A plan is only as good as its users, interpretation and how well its contents are
followed and adhered to. If a plan is to work, multiple actions and responsibilities are required
from many different parties. If all falls into place the Core Downtown Sub -Area Plan, its goals,
objectives and vision can be realized.
21