Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPacket - 02/20/2019 - Planning and Zoning CommissionPLANNING AND ZONING COMMISSION
MEETING NOTICE
DATE: Wednesday, February 20, 2019
TIME: 7:30 p.m.
PLACE: McHenry Municipal Center
(Council Chambers)
333 South Green Street, McHenry, IL 60050
AGENDA
1. Call to Order
2. Pledge of Allegiance
3. Roll Call
4. Public Input —(five minutes total on non -agenda items only)
5. Consideration of Approval of Meeting Minutes: December 13, 2018 Regular Meeting
6. Z-943 —Approval of the Final Plat of Subdivision McHenry Senior Partners Subdivision
and Variance from the Subdivision Control and Development Ordinance Section 6.13
to allow above -ground structures along Bull Valley Road for property located at the
northeast corner of Bull Valley and Ridgeview Roads.
Applicant: Troy Bersch, 802 E 8611 Street, Indianapolis, IN 46204.
Requested Action: Approval of the Final Plat of Subdivision McHenry Senior Partners
Subdivision and Variance from the Subdivision Control and Development Ordinance
Section 6.13 to allow above -ground structures along Bull Valley Road.
Location of Subject Property: The Subject property is located at the northeast corner of
Bull Valley Road and Ridgeview Road.
7. Staff Report: Next Meeting Date: March 20, 2019 at 7:30 p.m.
8. Adjourn
Posted February 13, 2019
The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest
quality of programs and services in a customer -oriented, efficient and fiscally responsible manner.
City of McHenry
Planning and Zoning Commission Minutes
December 13, 2018
Chairman Strach called the December 13, 2018 regularly scheduled meeting of the City of
McHenry Planning and Zoning Commission to order at 7:30 p.m. In attendance were the
following: Doherty, Gurda, Sobotta, Strach, Thacker and Walsh. Absent: Miller. Also in
attendance were: Director of Economic Development Martin and Economic Development
Coordinator Wolf.
Chairman Strach opened the public portion of the meeting at 7:30 p.m. There was nobody in
attendance who wished to address the Commission with public comment.
Chairman Strach closed the public comment portion of the meeting at 7:32 p.m.
Approval of Minutes
Motion by Sobotta, seconded by Thacker, to approve the November 14, 2018 Regular Meeting
minutes of the Planning and Zoning Commission Meeting, as presented:
Voting Aye:
Doherty, Gurda, Strach, Walsh, Sobotta, and Thacker.
Voting Nay:
None.
Not Voting:
None.
Abstaining:
None.
Absent:
Miller.
Motion carried 6-0.
Public Hearing: Youth and Family Center of McHenry County
File No. Z-937
3430 W. Elm Street
Conditional Use Permit for Assembly Use
Chairman Strach called the Public Hearing to order at 7:34 p.m. regarding File No. Z-937 an
application for a Conditional Use Permit for Assembly Use for the property located at 3430 W.
Elm Street.
Chairman Strach stated Notice of the Public Hearing was published in the Northwest Herald on
November 22, 2018. Notices were mailed to all abutting property owners of record as required
by ordinance. The subject property was posted. A Certificate of Publication and Affidavit of
Compliance with notice requirements are on file in the City Clerk's Office.
In attendance were Guadalupe Ortiz, 2790 Porter Ridge Way, Woodstock, IL, 60098, Director -
Youth and Family Center of McHenry County; and Darius Pfeifer, 3430 W. Elm St., McHenry, IL,
60050, property owner and board member, who were sworn in by Chairman Strach. Ms. Ortiz
stated she is requesting assembly use for the Youth and Family Center.
Planning and zoning Commission
December 13, 2018
Page 2
Director Martin stated the Youth and Family Center of McHenry County, formerly Garden Quarter
Neighborhood Resource Center, was located at the Garden Quarter Apartment Complex when it
began in 2004. It then relocated to the Century Plaza Shopping Center on Elm Street but quickly
grew out of that space. It is now operated out of 3430 W. Elm, immediately east of Green Street
on the north side of Elm. It serves numerous youth from McHenry County, all -year round, in a
variety of programming needs. Director Martin explained the definition of an assembly use.
Typically, assembly uses are conditional uses in all districts. This request is similar to Ignite Teen
Center when it was proposed in 2017 at the Old Mill Building at 4105 W. Crystal Lake Road. The
applicant for this request however does not consistently exceed 25 people. Twenty-five people
are only typically in the building during after school programs.
The applicant offers a dynamic place for youth to go and receive assistance with academics;
different types of interests they may have; health and wellness; participate in social activities; do
service projects and much more. This is a place exactly requested by people - a place for our
young people to gather, have fun, do activities, socialize, while supervised and be safe.
The proposed use is adjacent to the downtown area. Assembly uses are gathering places and
require a conditional use permit. Director Martin opined the facility is a great service to our
community.
The subject property is zoned C-4 therefore no off-street parking is required by ordinance. The
applicant typically does not require a lot of off-street parking however they do have buses which
come to the facility and it's important the buses load and unload off of Court Street and respect
the other businesses which also access the parking area off of Court Street. This is probably the
biggest concern for the Youth and Family Center of McHenry County to remain cognizant
especially due to the downtown activities.
Parking within downtown areas in any community is a challenge, however the proposed use will
not create any more traffic, require any additional public services or facilities or require more
parking than any other use which is permitted by right in the C-4 district. The proposed use is
conducive to the neighborhood and a downtown setting and will enhance the downtown.
Director Martin read into record a comment from the neighboring hair salon regarding liability
with children in the shared parking lot.
Director Martin stated he recommends approval of a conditional use permit to allow an assembly
use at 3430 W. Elm Street, and Staff finds the requirements of Table 31 of the Zoning Ordinance
have been met.
Chairman Strach stated he is an adjacent property owner and the Center has been a good
business. He stated on Thursdays the parking lot is sometimes a problem along with on street
parking, but other than that they have had no issues. Mr. Strach requested the Center possibly
Planning and Zoning Commission
December 13, 2018
Page 3
consider changing their programming so that Thursday nights are not an issue with parking and
the safety of the children.
Chairman Strach invited questions and/or comments from the Commission.
Commissioner Sobotta inquired if staff monitored the bus drop offs. Ms. Ortiz responded there
is always a staff member present and that the buses drop off on Court Street.
Commissioner Thacker asked if the parking needs for employees is a problem. Ms. Ortiz stated
because of outside programming on Thursday nights, that parking is sometimes an issue and
they will look into changing their programming schedule.
Commissioner Strach clarified the traffic/parking issues happen during student pick-ups by
parents, not when the students are dropped off by the buses.
Commissioner Gurda stated his questions have been answered, however, he wanted to be
certain there is no pick up or drop off on Route 120. Ms. Ortiz confirmed that is correct.
Commissioner Walsh asked why this location was chosen. Ms. Ortiz said they needed a more
centralized and larger location and this location fit their needs after extensive property
searches.
Chairman Strach opened the floor to questions and comments from the audience. There was
nobody in attendance that wished to address the Commission regarding this matter.
Chairman Strach closed the public comment portion of the hearing 7:48 p.m.
Motion by Walsh, seconded by Gurda, to recommend to the City Council with regard to File No.
Z-937 approval of an application for a Conditional Use Permit for Assembly Use for the property
located at 3430 W. Elm St; be granted and finds the requirements in Table 31 of the Zoning
Ordinance have been met.
Voting Aye: Doherty, Gurda, Sobotta, Strach, Thacker and Walsh.
Voting Nay: None.
Not Voting: None.
Abstaining: None.
Absent: Miller.
Motion carried 6-0
Chairman Strach closed the Public Hearing regarding File No. 937 at 7:48 p.m.
Planning and Zoning Commission
December 13, 2018
Page 4
Public Hearing: Elsayed Hassanein
File No. Z-940
414 South Crystal Lake Road
Map Amendment to RM-2 High -Density Multi -Family Residential, a Variance from the
Off -Street Parking and Loading Requirements and a Use Variance to allow commercial
land uses
Chairman Strach called the Public Hearing to order at 7:50 p.m. regarding File No. Z-940 an
application for a Map Amendment to RM-2 High -Density Multi -Family Residential, a Variance
from the Off -Street Parking and Loading Requirements and a Use Variance to allow commercial
land uses for the property located at 414 S. Crystal Lake Rd.
Chairman Strach stated Notice of the Public Hearing was published in the Northwest Herald on
November 24, 2018. Notices were mailed to all abutting property owners of record as required
by ordinance. The subject property was posted. A Certificate of Publication and Affidavit of
Compliance with notice requirements are on file in the City Clerk's Office.
In attendance were Andrew Sipes, Three Strands Properties, 816 Center Street, McHenry;
Elsayed Hassanein, 10529 Louetta Lane, Orland Park, 60467; Haitham Ramadan, 8113 Pickens
Dr., Orland Park, IL, 60462; and Raymond Clark, Architect, Ghafari Associates, LLC, 344 W.
Willow, Chicago. Mr. Hassanein stated they are requesting a Zoning Map amendment to RM-2
High -Density Multi -Family Residential, a Variance from the Off -Street Parking and Loading
Requirements and a Use Variance to allow commercial land uses for the subject property.
Director Martin stated the Planning and Zoning Commission considered an application submitted
by the Chapel for a 25,000 square foot church a couple of years ago on this property. At that
time the property was annexed, however the Chapel decided to rehabilitate an existing building
at 1809 S. Illinois Route 31. He stated if this project moves forward there is an existing annexation
agreement with the Chapel which would require amendment at the City Council level. Director
Martin stated the project proposed consists of two phases. The first phase consists of a building
proposed for an independent senior living facility consisting of approximately 202,000 square
feet and 175 living units and a 10,000 square foot commercial area. The second phase, to the
east, consists of a 136,000 square -foot building which would house 125 dwelling units. This
phase would be constructed in the future based on a new market study. Total number of parking
spaces proposed is 600.
Staff worked with the applicant for numerous weeks on the application, however, Staff believes
there are still several significant issues with the application which present obstacles in supporting
the request as presented. Director Martin listed the issues that were presented in his Staff
Report.
Director Martin stated he did ask for a review of the traffic study submitted and the review by H.
R. Green matched his concerns. The aforementioned points are significant and greater detail is
required, therefore this is reflected in the recommendation. The major points as presented deal
Planning and Zoning Commission
December 13, 2018
Page 5
with traffic, primary land uses and internal site circulation. He stated the traffic study is very
subjective.
Director Martin stated there is also an inconsistency in the submitted plan and the market study.
Director Martin stated the parking requirements are also inconsistent and unclear due to lack of
information for dwelling unit size and commercial use space. He stated recommendation for
approval is hard, due to these substantial issues.
Director Martin stated that Staff is recommending denial of a Zoning Map Amendment to RM-2
High -Density Multi -Family Residential and that Staff finds the requirements in Tables 33 of the
Zoning Ordinance have not been met; and
Staff recommends denial of a Variance from the Off -Street Parking and Loading Requirements to
develop the property in accordance with the site plan submitted as part of the application packet,
and Staff finds that the requirements in Table 32 of the Zoning Ordinance have not been met;
and
Staff recommends denial of a Use Variance to allow commercial land uses on the subject
property, and Staff finds the requirements in Table 32(A) Use Variances of the Zoning Ordinance
have not been met.
Chairman Strach asked for clarification on recommendation of denial on the Zoning Map
Amendment. Director Martin does not recommend approval of rezoning the property without
knowing the intended use of the property.
Chairman Strach asked if the second recommendation of denial is due to not knowing how many
of each type (one, two, or three bedroom) unit would be in each building. Director Martin
clarified.
Chairman Strach invited questions and/or comments from the Commission.
Commissioner Gurda stated he was not sure if there would be a need for a development of this
size in McHenry.
Commissioner Thacker asked why the applicant continued with the hearing knowing Staff was
recommending denial due to lack of detail because he has many questions as well. He further
stated that although he'd like to pursue what is being proposed there are still too many
questions. Commissioner Sobotta agreed with Commissioner Thacker.
Commissioner Doherty agreed and stated that he had hoped with the additional month for the
hearing the applicant would have cleared up more of the questions. He also expressed concern
regarding detention on the property, as well as lack of information on commercial usage.
Planning and Zoning Commission
December 13, 2018
Page 6
Chairman Strach asked if the applicant could respond to any of the concerns or give more detail
on unit numbers, sizes, density or on the commercial space.
Mr. Clark stated they are not seeking plan approval, engineering has not been undertaken
because they're in pre -concept design now and that they are seeking rezoning and density on
the site, for now. Mr. Ramadan stated the commercial use will be mainly physician offices and
supportive to the independent living facility and they feel they have met the parking
requirements for their pre -conceptual plan. He further stated they do not own the land, but have
a purchase agreement contingent upon approval. Mr. Ramadan stated that they did the traffic
study twice, at Staff's request, they did a market study and are here to ask for the zoning
amendment. He stated the current plan is for 169 units for the independent living facility.
Chairman Strach stated it is hard to give approval on a conceptual layout when there are still so
many unanswered questions. He does not feel able to make a denial or approval with such an
open-ended conceptual plan.
Commissioner Thacker reiterated the fact that it would be hard to move forward without more
detailed information but he would like to get that information to move forward.
Chairman Strach opened the floor to questions and comments from the audience.
Ben Korinek, 5112 Cambridge Dr., McHenry, McHenry Chapel Pastor, stated it would be great to
sell the property especially since they have moved and it would help them to further the
homeless shelter project they have coming up. They do understand the City's concerns and
hope that the applicant will work with the City to answer more of their questions and concerns.
Joseph Patrick (Pat) Stanek, 4917 Glenbrook Tr., McHenry, stated that when the Chapel
purchased the property he had concerns about the clean-up of the property at the property line
and he wanted to point out that the Chapel did not follow through to keep the tree line of the
property maintained. Mr. Stanek asked about the rear yard setback and Director Martin stated
that the rear yard setback is 25' for both Mr. Stanek and the applicant. Mr. Stanek stated the
40' height of the proposed building would be obtrusive only 30' from the property line. Mr.
Stanek stated he believes most of his neighbors did not even have a full realization of what is
being proposed. He would like to request what the devaluation of their properties would be if
this proposed building is built. Mr. Stanek feels the density being proposed on the property is
excessive.
Aaron Butler, 4764 Oregon, McHenry, IL, stated his appreciation for the opportunity to be
heard. Mr. Butler stated he also had many questions and concerns that were not answered in
the application and is happy they have the opportunity to get the questions answered before
making a decision. Mr. Butler does agree we need to take care of our elder population as well
as our youth in McHenry and he thinks a high quality facility of this type is important but
expressed concern regarding project time frame. He hopes the conversation can continue and
Planning and Zoning Commission
December 13, 2018
Page 7
encourages a partnership with the City and the community for further discussion of this type of
project.
Chairman Strach closed the public comment portion of the hearing 8:23 p.m.
Commissioner Walsh stated he does not feel his questions could be answered based on the
presented plans as submitted and the applicant's responses.
Mr. Ramadan stated he wanted to give clarification on the traffic study. He stated it was
originally done for the Chapel and the study is only deciding if there is a need for a right in/right
out entrance based on their phase one plan. He stated the draft was submitted before it was
finalized. He further stated he did not see the city engineer review until two weeks ago and
does not believe that should determine approval or denial of the project. Mr. Ramadan also
does not believe the commercial use will affect the traffic. He reiterated that everything is
conceptual and they are only asking to know if the property can be approved for RM-2 usage.
Mr. Hassanein stated it is a big property and they would not get a loan without a market study
and would make sure the study is strong before building the second phase. He spoke of the
immensity of the investment and asked the commission to consider that in their decision.
Commissioner Gurda stated that the property setbacks do not seem to leave enough room for a
tree buffer and would like to see a more residential look to a revised proposal with more space
considerations.
Commissioner Thacker stated he would like to see the applicant work with Staff on better
advancing the concept plan in order to gain approval.
Commissioners Sobotta and Doherty echoed previous Commissioner's comments and
encouraged further work between City Staff and the applicant.
Chairman Strach agreed and asked the applicant if they wanted to continue with a vote now or
continue the hearing and allow them to work to continue to revise the plans in order to get
Staff approval.
Mr. Clark stated the applicant is simply asking for rezoning not approval of the plan. He stated
they would have to undertake the design and site plan approval in order to answer many of the
questions presented and they are not at that point in their planning.
Director Martin stated he would not recommend approval of a Zoning Map Amendment based
on the conceptual plan presented. Attorney Cahill stated if the zoning is changed without
having a definite plan, the City would lose their control over what is built on the property.
Chairman Strach agreed.
Planning and Zoning Commission
December 13, 2018
Page 8
The applicant asked to proceed with the vote.
Motion by Walsh, seconded by Gurda, to recommend to the City Council with regard to File No.
Z-940 denial of an application for a Zoning Map Amendment to RM-2 High -Density Multi -Family
Residential, based on the finding that the requirements in Table 33 of the Zoning Map
Amendments of Zoning Ordinance have not been met, specifically that there is not shown there
is a need for high density multi -family in this area and no answers to how high density it will be
and how it will impact traffic flow.
Voting Aye:
Doherty, Gurda, Sobotta, Strach, Thacker and Walsh.
Voting Nay:
None.
Not Voting:
None.
Abstaining:
None.
Absent:
Miller.
Motion for denial
carried: 6-0
Motion by Thacker, seconded by Gurda, to recommend to the City Council with regard to File No.
Z-940 denial of an application for a Variance from the Off -Street Parking and Loading
Requirements finding the requirements of Table 32 of the Zoning Ordinance have not been met,
including but not limited to there is not sufficient information provided indicating density of the
units which would dictate parking and traffic flow.
Voting Aye:
Doherty, Gurda, Sobotta, Strach, Thacker and Walsh.
Voting Nay:
None.
Not Voting:
None.
Abstaining:
None.
Absent:
Miller.
Motion for denial
carried: 6-0
Motion by Thacker, seconded by Doherty, to recommend to the City Council with regard to File
No. Z-940 denial of an application for a Use Variance to allow commercial land uses for the
subject property located at 414 S. Crystal Lake Rd finding the requirements of Table 32 (A) of the
Zoning Ordinance have not been met, specifically petitioners did not show evidence of undue
hardship that would justify a use variance.
Voting Aye:
Doherty, Gurda, Sobotta, Strach, Thacker and Walsh.
Voting Nay:
None.
Not Voting:
None.
Abstaining:
None.
Absent:
Miller.
Motion for denial
carried: 6-0
Chairman Strach closed the Public Hearing regarding File No. 940 at 8:45 p.m.
Planning and Zoning Commission
December 13, 2018
Page 9
Staff Report
Director Martin stated that on Monday, December 17, 2018 the Future Land Use and Existing
Land Use Maps, and the Agriculture and Mixed Use Zoning Districts would be presented for
approval to the City Council and the January 30, 2019 regularly scheduled meeting would be
held at 7:30 p.m. in the City Council Chambers.
Adjournment
Motion by Sobotta, seconded by Thacker, to adjourn the meeting at 8:50 p.m.
Voting Aye: Doherty, Gurda, Sobotta, Strach, Thacker and Walsh.
Voting Nay: None.
Not Voting: None.
Abstaining: None.
Absent: Miller.
Motion carried 6-0. The meeting was adjourned at 8:50 p.m.
Respectfully submitted,
Shawn Strach, Chairman
City of McHenry
Planning & Zoning Commission
[PLANNING AND ZONING COMMISSION
STAFF REPORT Z-943 FINAL PLAT OF SUBDIVISION MCHENRY
SENIOR PARTNERS SUBDIVISION AND VARIANCE FROM THE
SUBDIVISION CONTROL AND DEVELOPMENT ORDINANCE
SECTION 6.13 TO ALLOW ABOVE -GROUND STRUCTURES ALONG
BULL VALLEY ROAD]
Applicant
Troy Bertsch
802 East 861h Street
Indianapolis, IN
Requested Actions
Approval of the Final Plat of Subdivision McHenry Senior Partners Subdivision and Variance from
the Subdivision Control and Development Ordinance Section 6.13 to allow above -ground
structures along Bull Valley Road.
Site Information
Location and Size of Propertv
Northeast corner of Ridgeview Drive and Bull Valley Road. The property is approximately 5.825
acres.
Comprehensive Plan Designation
Medium -Density Residential
Existing Zoning and Land Use
1-1 Industrial and Vacant
Adiacent Land Use and Zoning
North: 1-1 Industrial, Vacant
South: H-C Healthcare District, Vacant
West: 0-1 Local Office, Colonial Funeral Home and 1-1, Vacant
East: 1-1, Vacant
Background
The subject property is part of a larger tract of land which wraps around from Bull Valley Road to
Illinois Route 31 and consists of approximately 5.825 acres. The applicant is proposing to
subdivide a smaller tract of land off from a larger piece.
Additionally, the applicant is requesting a variance from Section 6.13 of the Subdivision Control
and Development Ordinance, which requires all new subdivisions to bury existing utility
structures. The ordinance states:
1
[PLANNING AND ZONING COMMISSION
STAFF REPORT Z-943 FINAL PLAT OF SUBDIVISION MCHENRY
SENIOR PARTNERS SUBDIVISION AND VARIANCE FROM THE
SUBDIVISION CONTROL AND DEVELOPMENT ORDINANCE
SECTION 6.13 TO ALLOW ABOVE -GROUND STRUCTURES ALONG
BULL VALLEY ROAD]
"6.13 Public Utilities, Underground. All new subdivisions shall be provided with a complete
system of underground public utilities including without limitation telephone, gas, electric, and
cable television. Existing or relocated above ground utility structures located within or along the
perimeter of a new subdivision shall be buried." The variation provision states:
"Variations from the provisions of these regulations may be authorized by the City Council, after
recommendation by the Planning and Zoning Commission, in accordance with the provisions of
this Section, if it finds an extraordinary hardship or practical difficulty that results from strict
compliance with these regulations and/or the purposes of these regulations may be served to a
greater extent by an alternative proposal."
Analysis
Attached is the Final Plat of Subdivision for the subject property. The Planning and Zoning
Commission must consider the plat at a public meeting and the Planning and Zoning Commission
recommendation is forwarded to the City Council. Staff has reviewed the plat, spoken to the City
Engineer and believes the final plat is in substantial conformance with the preliminary plat
approved last year (attached). Staff has found the plat to be in substantial conformance with all
city ordinances relating to a final plat of subdivision and would recommend the Planning and
Zoning Commission recommend approval of the final plat.
The following is the statement of justification/criteria for the applicant's requested variation
from Section 6.13 Public Utilities, Underground.
Statement of Justification (submitted by applicant). In applying for a variance from these
regulations, the subdivider or developer shall demonstrate in writing that:
1. The granting of the variance is in keeping with the overall purpose and intent of these
regulations, and will not be detrimental to the public health, safety, or general welfare;
and
Response: The existing overhead poles adjacent to the subject property are consistent along the
Bull Valley Corridor and will not be detrimental to the public health, safety and general welfare
if it is not buried.
2. The conditions on which the request is based are unique to the property for which the
relief is sought and are not applicable generally to other property; and
2
[PLANNING AND ZONING COMMISSION
STAFF REPORT Z-943 FINAL PLAT OF SUBDIVISION MCHENRY
SENIOR PARTNERS SUBDIVISION AND VARIANCE FROM THE
SUBDIVISION CONTROL AND DEVELOPMENT ORDINANCE
SECTION 6.13 TO ALLOW ABOVE -GROUND STRUCTURES ALONG
BULL VALLEY ROAD]
Response: If the City required for the overhead poles to be buried adjacent to the subject
property, this would be the only property in the surrounding area along Bull Valley Road that
would be buried and the look and feel along Bull Valley Road would not be consistent.
3. The granting of the variance will alleviate a practical difficulty or particular hardship due
to the physical surroundings, shape or topographic conditions of the specific property
involved; and
Response: It would not be practical for the Utility companies to come out and bury the overhead
lines along Bull Valley Road along our subject property since they are aerial for a long stretch to
the east and west of the property. If the lines are buried in the future, it would be more practical
for the entire stretch to be buried at one time.
4. The granting of the variance will not negatively affect adjacent properties
Response: Since all of the properties currently have overhead poles adjacent to their properties,
this will be a consistent look and feel along Bull Valley Road and will not negatively affect adjacent
properties.
Staff believes the variance is justified particularly due to the planned future roadway expansion
(Bull Valley Road) and the reasons pointed out by the applicant. While any future roadway
expansion will occur as part of an overall plan McHenry County has -there is no definitive
timetable. Burying the power lines and then having to relocate them in the future does not make
sense and is impractical. Staff supports the requested variance. A similar variance was granted
to the Ricky Rockets Subdivision along Chapel Hill Road.
Staff Recommendation Prior to Meeting
Staff recommends approval of the Final Plat of Subdivision: McHenry Senior Partners Subdivision
prepared by Compass Surveying Ltd. dated 6/29/18 with a latest revision date of 1/2/19 and
Variance from Section 6.13 of the Subdivision Control and Development Ordinance to allow
above -ground structures along Bull Valley Road with the following conditions:
1. Compliance with all revisions and comments pertaining to site engineering by Staff; City
engineer and McHenry County Highway Division;
2. Plat must be recorded within six months of City Council approval by ordinance and;
3. A stormwater permit, along with a stormwater pollution prevention plan, shall be submitted
and approved by the city engineer and staff prior to construction or any site work being
completed;
4. Monetary contribution shall be made in lieu of bike path construction along Bull Valley Road.
3
[PLANNING AND ZONING COMMISSION
STAFF REPORT Z-943 FINAL PLAT OF SUBDIVISION MCHENRY
SENIOR PARTNERS SUBDIVISION AND VARIANCE FROM THE
SUBDIVISION CONTROL AND DEVELOPMENT ORDINANCE
SECTION 6.13 TO ALLOW ABOVE -GROUND STRUCTURES ALONG
BULL VALLEY ROAD]
Attachments:
• Location Map
• Application Packet
• Preliminary Plat
• Final Plat
SUBJECT PROPERTY
Id
Form F
PLAT/DEVELOPMENT APPLICATION
City of McHenry
333 South Green Street - McHenry, IL 60050 - Tel: (815) 363-2170 - Fax: (815) 363-2173
1. Name of Applicant Troy Bertsch
Tel 317-669-8404
Address 802 East 86th Street, Indianpolis, IN
Fax
2. Name of Property OwnerN/A
Tel
(If other than Applicant)
Address
Fax
3. Name of Engineer Andy Heinen
Tel 630-487-5553
(If represented)
Address 1001 Warrenville Road, Suite 350, Lisle, IL
Fax
4. Name of Attorney
Tel
(If represented)
Address
Fax
5. Common Address or Location of Property NEC of Bull Valley Road & Ridgeview Drive,
McHenry, IL, 60050
6. Requested Action
Preliminary Plat
X Final Plat
Development
Provide a brief description of the Requested Action. For example, indicate the number of lots and the
type of subdivision (single-family, towhhome, commercial, industrial, etc.) or include a description of
the development project:
Subdivision of a 5.82 acre lot for a new Skilled Nursing Facility, which will include a
55,000 SF building with associated parking, utility, and stormwater management
facilities.
FORM F Page I of 3
7. Current Use of Property Undeveloped, cultivated farmland.
8. Current Zoning Classification of Property, Including Variances or Conditional Uses
1-1 Industrial, Proposed Change to 0-1 Local Office
9. Current Zoning Classification and Land Use of Adjoining Properties
North: 1-1 Industrial
South: HC HealthCare (Across Bull Valley Road)
East: 1-1 Industrial
West: 0-1 Local Office (Across Ridgeview Drive)
10. Required Attachments - Please refer to the attached checklist.
11. Disclosure of Interest
The party signing the application shall be considered the Applicant. The Applicant must be the owner
or trustee of record, trust beneficiary, lessee, contract purchaser, or option holder of the subject
property or his or her agent or nominee.
Applicant is Not Owner
If the Applicant is not the owner of record of the subject property, the application shall disclose the
legal capacity of the Applicant and the full name, address, and telephone number of the owner(s). In
addition, an affidavit of the owners(s) shall be filed with the application stating that the Applicant has
the authority from the owners(s) to make the application.
Applicant or Owner is Corporation or Partnership
If the Applicant, owner, contract purchaser, option holder, or any beneficiary of a land trust is a
corporation or partnership, the application shall disclose the name and address of the corporation's
officers, directors, and registered agents, or the partnership's general partners and those shareholders
or limited partners owning in excess of five percent of the outstanding stock or interest in the
corporation or interest shared by the limited partners.
Applicant or Owner is a land Trust
If the Applicant or owner is a land trust or other trust or trustee thereof, the full name, address,
telephone number, and extent of interest of each beneficiary shall be disclosed in the application.
FORM F Page 2 of 3
12. Certification
I hereby certify that I am aware of all code requirements of the City of McHenry that relate to this
property and that the proposed use or development described in this application shall comply with all
such codes.
I hereby request that the City process this application in accordance with the codes and ordinances of
the City.
Sipature of Applicant(s)
Print Name and Designation of Applicant(s)
r1 �> Bra lSc 1k
Div-tc; oa- 17v,, p7�joofp,; i,II
FORM F Page 3 of 3
Final Plat Checklist
Final Plat Checklist
Page 1 of 4
The following items are required to process a Final P/at. All required information
including this checklist, signed by the surveyor or engineer preparing the final plat
and the property owner shall be provided to the Community Development
Department.
Name of Subdivision: McHenry Senior Partners Subdivision
49 17 copies of the approved preliminary plat.
fI 17 copies of the final plat, not exceeding 24" x 36" in size. The plat shall
include or be accompanied by the following:
Name of the subdivision. A letter from the McHenry County Recorder
of Deeds certifying that the proposed subdivision name does not
duplicate the name of any subdivision of record within the County
shall be provided.
WI Preparation date, including succeeding revision dates.
V North point.
jd Scale (not less than 1" = 100' and not more than 1" = 20' feet).
Location of the subdivision by government lot, quarter section,
section, township, and range, or by other legal description.
Exact location of the subdivision indicated by true angles and
distances to the nearest established street lines and a corner or
corners established in the U.S. public land survey.
J� Exact length and bearing of the exterior boundaries of the
subdivision.
Exact location, widths, and names of all existing or proposed streets,
alleys, easements, or other public ways.
JK All lot numbers and lines, with accurate dimensions.
0 Building setback lines with the lot widths.
X Point of curvature, point of tangency, radii, length and central angle
for all horizontal curves.
N/A ❑ Special flood hazard boundary lines and areas.
r+
City of McHenry c c Community Development Department
333 South Green Street n r 815/363-2170 FAX 815/363-2173
r
Final Plat Checklist
Page 2 of 4
jG Language granting necessary easements to the City and to
appropriate utility companies for rights -of -way and for public services
and utilities, in a form provided by the City. Evidence shall be
furnished to the City that the individual utility companies or the
organization responsible for furnishing the service involved has
reviewed such easements and any easement provisions to be
incorporated on the plat or in deeds.
Certificates (see attached). Except as otherwise required by law,
certification on final plats located in unincorporated areas subject to
these regulations shall be those required by McHenry County, except
when these regulations are more restrictive, the applicable
certifications contained herein shall also be required.
Je Illinois Registered Land Surveyor indicating that the plat
represents a survey made by him or her, that the monuments
or markers shown thereon exist as located, and that all
dimensional details are correct.
Rf Property owner(s) and any mortgage holder of record, of the
adoption of the plat and the dedication of street, easement, and
other public areas.
JZ Surface Water Drainage
J2f Roadway Access, State and/or County, if necessary
f�f McHenry County Health Department, if necessary
yd School District(s)
,0 City Engineer
City Collector
y1 City Clerk
Planning and zoning Commission Chairperson
County Clerk
f� Agreement and Notice of Developer Contributions and Land
Donation
fd' 17 copies of final engineering plans, prepared by and bearing the seal of a
Professional Engineer registered in Illinois.
fd 17 copies of the sanitary sewer calculations
Ri 17 copies of the storm sewer calculations with inlet spacing
fG 17 copies of the water model or calculations regarding fire hydrant flow
and pressures
X 17 copies of the Wetland Mitigation Report (if applicable)
fG 17 copies of the signed and sealed Engineer's Opinion of Probable Costs
r
City of McHenry >r Community Development Department
333 South Green Street o r 815/363-2170 FAX 815/363-2173
r
Final Plat Checklist Page 3 of 4
N/A ❑ 17 copies of all off -site easements or dedicated plats with legal
descriptions
yl 17 copies of an accurate survey and legal description of all property
proposed to be dedicated for public use or to be reserved by covenant for
use of all property owners in the subdivision with the purpose or purposes
indicated therein, and with the conditions, if any, of such dedication or
reservation.
yl 17 copies of all other applications or correspondence to other agencies
having jurisdiction over the subdivision, including:
1r IDNR consultation termination
,Z IHPA consultation termination
N/A ❑ US Army Corp of Engineers consultation termination
N/A ❑ Approved McHenry County Stormwater Development Permit (if
tributary area is greater than 100 acres)
N/A ❑ McHenry County certification of the BFE (Base Flood Elevation)
0 Approved City of McHenry Stormwater Development Permit
N/A ❑ IDOT approval of plans
Ri MCDOT approval of plans
N/A ❑ Township
N/A ❑ 17 copies of covenants, conditions and restrictions, ready for recording.
Such other information as the Plat Officer, Planning and Zoning
Commission, or City Council may require at any time, which, in the
exercise of their discretion, is appropriate in light of all of the
circumstances affecting the application and will not be contrary to the
purposes and intent of these regulations.
Z 1 copy of the following permits: (in a separate bundle)
YS Stormwater Development Permit ready for City signature
pi IEPA Water Permit Application ready for City signature
�f IEPA Sewer Permit Application ready for City signature
ie NOI Reports of the storm sewer calculations with inlet spacing
17 copies of engineer's response letter addressing all previous comments
(if resubmittal)
All required submittals shall be sorted into sets with one copy of each item in a
set. All sets of required submittals shall be rubber banded or otherwise fastened
together.
r
City of McHenry N•w Community Development Department
333 South Green Street 815/363-2170 FAX 815/363-2173
r
Page 4 of 4
Final Plat Checklist
I
Wt An original application (Form F)
0 Application fee and retained personnel fee deposit as follows:
Final fee: $450; plus
Retained Personnel Deposit
Plus $3,000 per cul-de-sac
Andrew Heinen, P.E
Name of Surveyor or Engineer
0-4 acres - $900.00 per acre
5-9 acres - $700.00 per acre
10+ acres - $500.00 per acre
hereby certify that all of the information listed
on this checklist has been included with my submittal. I understand that the City
will review the information submitted and inform me within 7 days after receiving
said information of any missing information. I understand that the City may
return my submittal if any item required by this checklist is not included with my
submittal. I further understand that the City is under no obligation to begin its
review until all required information is submitted.
Date
Property Owner
// 't
Name df Surveyor or Engineer
ai1dt�t�
Date
di h7
Date
Received by Community Development Department
(NOTE: By signing this form, the City acknowledges receiving your submittal, but makes no representations
about its completeness)
Name
Date Received
City of McHenry r �^° Community Development Department
333 South Green Street o "rr 815/363-2170 FAX 815/363-2173
CITY CLERK'S CERTIFICATE
STATE OF ILLINOIS
) SS
COUNTY OF MCHENRY )
1,________------_, CITY CLERK OF THE CITY OF MCHENRY, ILLINOIS,
HEREBY CERTIFY THAT THE ANNEXED PLAT WAS PRESENTED TO AND BY RESOLUTION DULY
APPROVED BY THE CITY COUNCIL OF SAID CITY AT ITS MEETING HELD ON
__ _______ 20___, THAT ALL DEDICATIONS TO THE CITY OF MCHENRY,
ILLINOIS DEPICTED THEREON WERE ACCEPTED BY THE CITY COUNCIL ON SAID DATE, AND THAT
THE REQUIRED BOND OR OTHER GUARANTEE HAS BEEN POSTED FOR THE COMPLETION OF THE
IMPROVEMENTS REQUIRED BY THE REGULATIONS OF SAID CITY. (MC-93-594)
IN WITNESS THEREOF, I HAVE HERETO SET MY HAND AND SEAL OF THE CITY OF MCHENRY,
ILLINOIS, THIS ______ DAY OF ------------ 1 20__
CITY CLERK
MCHENRY COUNTY HEALTH DEPARTMENT CERTIFICATE
NOTE: WHERE ANY PART OF THE PLATTED LAND WILL NOT BE SERVED BY A PUBLIC SEWER
SYSTEM, THE PLAT SHALL CONTAIN THE FOLLOWING CERTIFICATE, DULY EXECUTED BY THE
MCHENRY COUNTY HEALTH DEPARTMENT.
STATE OF ILLINOIS )
) SS
COUNTY OF MCHENRY )
THE DISPOSAL OF SEWAGE INTO A PRIVATE SEWER SYSTEM IS HEREBY APPROVED AS TO ANY
PART OF THE PLATTED LAND THAT WILL NOT BE SERVED BY A PUBLIC SEWER SYSTEM, THIS
-------- DAY OF ---------------------- 20---•
MCHENRY CO HEALTH DEPT. TITLE
SURFACE WATER DRAINAGE CERTIFICATE
) SS
COUNTY OF MCHENRY )
I- ----------------- OWNER, AND 1,
---------------------
PROFESSIONAL ENGINEER OF THE STATE OF ILLINOIS, DO HEREBY CERTIFY THAT TO THE BEST
OF OUR KNOWLEDGE AND BELIEF THE DRAINAGE OF SURFACE WATERS WILL NOT BE CHANGED
BY THE CONSTRUCTION OF THIS SUBDIVISION OR ANY PART THEREOF, OR, IF SUCH SURFACE
WATER DRAINAGE WILL BE CHANGED, REASONABLE PROVISION HAS BEEN MADE FOR
COLLECTION AND DIVERSION OF SURFACE WATERS INTO PUBLIC AREAS, OR DRAINS WHICH THE
SUBDIVIDER HAS A RIGHT TO USE, AND THAT SUCH SURFACE WATERS WILL BE PLANNED FOR
IN ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING PRACTICES SO AS TO REDUCE THE
LIKELIHOOD OF DAMAGE TO THE ADJOINING PROPERTY BECAUSE OF THE CONSTRUCTION OF
THE SUBDIVISION. (MC-89-491)
DATED THIS __— DAY OF _—__—_--------- —, 20---_.
OWNER REGISTERED PROFESSIONAL ENGINEER OF ILLINOIS
[ENGINEERS SEAL]
LEGEND
® SET 7/8" O.D.I.P.
UNLESS OTHERWISE NOTED
■ SET CONCRETE MONUMENT
UNLESS OTHERWISE NOTED
+ SET CROSS IN CONCRETE
UNLESS OTHERWISE NOTED
= PROPOSED UTILITY EASEMENT
= PROPOSED TRAIL EASEMENT
ABBREVIATIONS
O.D.LP. = OUTSIDE DIAMETER IRON PIPE
(R) = RECORD BEARING OR DISTANCE
(M) = MEASURED BEARING OR DISTANCE
(C) = CALCULATED BEARING OR DISTANCE
(D) = DEED BEARING OR DISTANCE
B.S.L. = BUILDING SETBACK LINE
U.E. = UTILITY EASEMENT
D.E. = DRAINAGE EASEMENT
P.U.E. = PUBLIC UTILITY EASEMENT
P.O.C. = POINT OF COMMENCEMENT
P.O.B. = POINT OF BEGINNING
P.U. & D.E. = PUBLIC UTILITY AND
DRAINAGE EASEMENT
PRELIMINARY PLAT OF SUBDIVISION
McHENRY SENIOR PARTNERS SUBDIVISION
PIN: 14-03-251-006
OVER GRAPHIC SCALE
PART OF THE NORTHEAST QUARTER OF SECTION 3, 100 0 50 100 200
TOWNSHIP 44 NORTH, RANGE 8 EAST OF THE THIRD
PRINCIPAL MERIDIAN, IN MCHENRY COUNTY, ILLINOIS.
( IN FEET )
1 inch = 100 it.
I
I I
THE NORTH LINE OF, THE S
m
m
m
r
z
rn
0
m
J)
0
c
m
C
c
D
.TI
m
m
0
m
m
z
0
A
m
D
U)
C
c
D
m
m
oFOUND 7/8" O.D.I.P.
(HELD)
Z
COLONIAL FUNERAL HOME
AND CREMATORY
PIN: 14-03-251-007
OWNER: DATR RGTR MRACHEK
ZONED: 0-1 (LOCAL OFFICE)
FOUND MAG NAIL
(HELD)
PIN: 14-03-401-010
LOT 1
601 RIDGEVIEW DRIVE
LINE LEGEND
SUBDIVISION BOUNDARY LINE
ADJACENT LAND PARCEL LINE
LOT LINE
- - - - EASEMENT LINE
CENTERLINE
--- BUILDING SETBACK LINE
---- SECTION LINE
® ZI
�J
mm
m
WEST QUARTER OF THE NORTHEAST QUARTER OF SECTI
I I i I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I i
i I I I
I I I I
I I I I
I I I I
I I I I
I I I I
i I i I
I I I I "K
i
PIN: 14-03-251-006
OWNER: 1ST NATIONAL BANK
TRUST NO. 1761
ZONED 1-1 (INDUSTRIAL)
Y \_S37'34'09-W(M)
- J 75.02'(M)
S89'14'08-W(M)
53.22'(M)
W
0
0
C
VALLEY ROAD
(COUNTY HIGHWAY A32)
PIN: 14-03-400-051
OWNER: NIMED CORP.
4201 MEDICAL CENTER DRIVE
ZONED HC (HEALTH CARE DISTRICT)
I
FOUND 3/8" REBAR J '
FOUND CONCRETE
RIGHT OF WAY MARKER
NORTH FACE 0.27' NORTH
AREA SUMMARY
GROSS 256,694 SQUARE FEET OR 5.825 ACRES
R.O.W. DEDICATION 10,282 SQUARE FEET OR 0.236 ACRES
NET AREA 246,412 SQUARE FEET OR 5.589 ACRES
(TO HEAVY LINES)
(BASED ON MEASURED VALUES)
ROADWAY ACCESS CERTIFICATE
) SS
COUNTY OF MCHENRY )
ROADWAY ACCESS TO COUNTY HIGHWAY NO A32 AS SHOWN ON THIS
PLATIS HEREBY APPROVED
DAY OF
MCHENRY CO SUPT OF HIGHWAYS
•
OWNER / SUBDIVIDER:
MCHENRY SENIOR PARTNERS, LLC
802 EAST 86TH STREET
INDIANAPOLIS, IN 46240
ENGINEER:
KimleyoHorn
© 2017 KIMLEY-HORN AND ASSOCIATES, INC.
1001 WARRENVILLE ROAD, SUITE 350,
LISLE, IL 60532
PHONE: 630-487-5550
WWW.KIMLEY-HORN.COM
20_—.
400
¢ w
Z w
r to 01
OD i w
Z w w
3 O z
a �
z
O w
< z
¢ z
w
U U
a
w
00 a
i
Lli
m
N
I
0
a o .-
U
z
Lo
o
®
rM
= W
U
O N
®
p
a d
N�
d O
� O
�
®
w ZN
J Wo0}
t
I S
H
Y QJ�J
i`vI
N _O
J p
(10
W
�
w
�z
O
O
d
F
aQ
K U
°
a
P. O
�a u
0
v
z
�
o
o
w v
z
U
u
•
0
QOQ o
lip
y
LU
V1
Uj
m o
®
N Q`
O
o
m
V
H
z
SCALE: 1" = 100'
1 OF 2
K:\PSDATA\2018 PROJECTS\18.0161\18.0161-02 PLAT\18.0161-02 POSUBSD.DWG i PROJ.NO.: I8.0I6I-02 1
u.APsmtoA20te Pro actsV�6.0�64V1B-DtF�-D2 PmtA'6Di61-02 PDSbsddia, V�/2C19 t22.i0 PM, D�tG To PDF-oc_
PRELIMINARY PLAT OF SUBDIVISION
• FOUND 7/8" O.DJ.P.
UNLESS OTHERWISE NOTED
(HELD LOCATION)
■ CONCRETE MONUMENT
+ CROSS IN CONCRETE
00 MANHOLE
STORM STRUCTURE
QS SANITARY MANHOLE
OPO CLEANOUT
® FLARED END SECTION
[T1, TRANSFORMER PAD
OE ELECTRIC MANHOLE
E3 ELECTRIC BOX
ED ELECTRIC PEDESTAL
t: ELECTRIC MARKER
Ek ELECTRIC METER
-0- UTILITY POLE
-6 UTILITY POLE W/LIGHT
-CI- UTILITY POLE W/TSF
•-- GUY POLE
0 OVERHEAD TRAFFIC SIGNAL
® TRAFFIC SIGNAL MANHOLE
+ LIGHT
* LIGHT POLE
FHHI HAND HOLE
0 VALVE VAULT
TY FIRE HYDRANT
G'cv IRRIGATION CONTROL VALVE
p Y POST INDICATOR VALVE
SIAMESE WATER CONNECTION
.i WATER MARKER
viM WATER METER
0 VALVE BOX
B/BOX
® TELEPHONE MANHOLE
:TfTC TELEPHONE NETWORK INTERFACE
:1: TELEPHONE MARKER
O TELEPHONE PEDESTAL
Cl CABLE TELEVISION PEDESTAL
).K GAS METER
19P GAS VALVE
* GAS MARKER
ODS DOWN SPOUT
06H BORING HOLE
® MONITORING WELL
O� GATE POST
• BOLLARD POLE
v SIGN
—'� FLAG POLE
Q MAILBOX
—)— SANITARY SEWER
>— STORM SEWER
—w— WATER MAIN
—G—GAS MAIN
—E—ELECTRIC LINE
—GHw— OVERHEAD WIRES
—T— TELEPHONE LINE
CONIFEROUS TREE
8 yK W/APPROX. DIAMETER
ie• DECIDUOUS TREE
* W/APPROX. DIAMETER
MS=MULTI-STEM
(DRIP LINE SHOWN IS APPROXIMATE)
+ ELEVATION
BITUMINOUS PAVEMENT
CONCRETE SURFACE
® DEPRESSED CURB
GRAVEL SURFACE
LANDSCAPE AREA
STONE SURFACE
LE TAC
WARNINGBSURFACELE
-0-0- WOOD FENCE
-x—x- CHAIN LINK FENCE
--0-0- METAL FENCE
n ^METAL GUARDRAIL
-,—o OVERHEAD TRAFFIC
ARM
MCHENRY COUNTY BENCHMARK #7534
DATUM: NAVD88
ELEVATION = 753.93
ABBREVIATIONS
0 D.I.P. = OUTSIDE DIAMETER IRON PIPE
IF = TOP OF FOUNDATION
FF = FINISHED FLOOR
FES = FLARED END SECTION
VCP = VITRIFIED CLAY PIPE
DIP = DUCTILE IRON PIPE
PVC = POLYVINYL CHLORIDE
RCP = REINFORCED CONCRETE PIPE
CMP = CORRUGATED METAL PIPE
(R) = RECORD BEARING OR DISTANCE
(M) = MEASURED BEARING OR DISTANCE
(C) = CALCULATED BEARING OR DISTANCE
(D) = DEED BEARING OR DISTANCE
A = ARC LENGTH
R = RADIUS
CH = CHORD
CB = CHORD BEARING
B.S.L. = BUILDING SETBACK LINE
U.E. = UTILITY EASEMENT
D.E. = DRAINAGE EASEMENT
P.U.E. = PUBLIC UTILITY EASEMENT
P.O.C. = POINT OF COMMENCEMENT
P.O.B. = POINT OF BEGINNING
P.U. & D.E. = PUBLIC UTILITY AND
DRAINAGE EASEMENT
LINE LEGEND
LIMITS OF LAND PER
LEGAL DESCRIPTION
ADJACENT LAND
PARCEL LINE
---- EASEMENT LINE
--- CENTERLINE
--- BUILDING SETBACK LINE
---- SECTION LINE
------- EXISTING CONTOUR
FOUND 7/8" O.D.I.P.
(HELD)
COLONIAL FUNERAL HOME
AND CREMATORY
PIN: 14-03-251-007
OWNER: DATR RGTR MRACHEK
ZONED: 0-1 (LOCAL OFFICE)
V 00.03' 35"W(M )
129.83'(M)
PIN: 14-03-401-010
LOT 1
INLAND BUSINESS PARK
601 RIDGEVIEW DRIVE
= PROPOSED UTILITY EASEMENT
= PROPOSED TRAIL EASEMENT
I
f�?
OVER
PIN: 14-03-251-006
PART OF THE NORTHEAST QUARTER OF SECTION 3,
TOWNSHIP 44 NORTH, RANGE 8 EAST OF THE THIRD OWNER: 1ST NATIONAL BANK
PRINCIPAL MERIDIAN, IN MCHENRY COUNTY, ILLINOIS. TRUST NO. 1761
1 I 1 ' I ZONED 1-1 (INDUSTRIAL)
I I I
N89'14'08"E(M) 516.54'(M) I I I
T I 30' I
DP���ll�°EULIE E E�Y/_L�1 I I /
--- �' I ✓�� I I I I I r'
----
_ I !
25'
40
(Al
0
0
Ln
N
li Itl
<
� '0
I I,.'
0)
84.._. o I
m
m I
m
M
w'
d (O 11
o'0�
I� w
Q cw �
w QTwl
oZ�'/�
I J I o�Z o
of ,Z
I I D:li
ZONED-1 I I 0 U I (If l II II
z =Q)
I I o I I II/zil I i 89*14'OW'W(M
53.22'(M)
Ivw
I I I III I I/�
I 1 Q I ,� I I o�
U
I I z> I Qil I I r�
Wm I ce O1 I t�
I I O'',,
1 25'
ou'
r ri
I I 6• I
I
WETLANDS
s'
OUTLOT 3
I 1 I I RESTRICTED PROPERTY PER
3d' II I DOCUMENT N0. 2004R0087029
�AlZ,B' 10' I THE SOUTH LINE OF THE NORTHEAST
zz
R' ----- --ram-rTr-7-T - 1 QUARTER OF SECTION 3-44-8
PROPOSED 10' UTILITY EASEMENT N 9° 4' 4
t Ia;
I I I o N
N r_-._I I o o--615.00
oFUTURE 20' RIGHT OF WAY_ DEDICATION_ I I I. 570.42'
- — —
S89A14'08"W{Mj 4 1
_. _.
aNORTH__
4 r
47 �NLH7TH
A _
_----- . ate.'.__
_VALLEY
�30AD
(COUNTY HIGHWAY A32)
PIN: 14-03-400-051
OWNER: NIMED CORP.
4201 MEDICAL CENTER DRIVE
ZONED HC (HEALTH CARE DISTRICT)
GRAPHIC SCALE
20 40 An
( IN FEET )
1 inch = 40 ft.
Y
V)
m �
w \
Y
w W
O Q
Q
Z w
O
} F/5 of
w
DOS
Z w of
3 W Z
a CD
of z
o w
3 z
,t z
w
a- U
w
ao a
I
rn
N
I
0
O
a 4OZ—
SCALE: I" = 40'
K:\PSDATA\2018 PROJECTS\18.0161\18.0161-02 PLAT\18.0161-02 POSUBSD.DWG I PROJ.NO.: 18.0161-02
�'V 3o=cA2tl16 P _..A'° Ci EiV /71 - �3 °ia_`�gAi 61-o2 P0� Cs3.avp, /9/2019 1 2230 PoV nw6 -o PCF.oc
,.,
PROJECT LOCATiON
ry T
, v
CITY CLERK'S CERTIFICATE
STATE OF ILLINOIS
) SS
COUNTY OF MCHENRY )
I, —_—__—_________--- CITY CLERK OF THE CITY OF MCHENRY, ILLINOIS,
HEREBY CERTIFY THAT THE ANNEXED PLAT WAS PRESENTED TO AND BY RESOLUTION DULY
APPROVED BY THE CITY COUNCIL OF SAID CITY AT ITS MEETING HELD ON
20--, THAT ALL DEDICATIONS TO THE CITY OF MCHENRY,
ILLINOIS DEPICTED THEREON WERE ACCEPTED BY THE CITY COUNCIL ON SAID DATE, AND THAT
THE REQUIRED BOND OR OTHER GUARANTEE HAS BEEN POSTED FOR THE COMPLETION OF THE
IMPROVEMENTS REQUIRED BY THE REGULATIONS OF SAID CITY. (MC-93-594)
IN WITNESS THEREOF, 1 HAVE HERETO SET MY HAND AND SEAL OF THE CITY OF MCHENRY,
ILLINOIS, THIS —__— DAY OF ----------- , 20__
CITY CLERK
CITY ENGINEER'S CERTIFICATE
) SS
COUNTY OF MCHENRY )
I, --- _---_--- CITY ENGINEER OF THE CITY OF
MCHENRY, ILLINOIS, HEREBY CERTIFY THAT THE LAND IMPROVEMENTS DESCRIBED IN THE
ANNEXED PLAT, AND THE PLANS AND SPECIFICATIONS, IF ANY, MEET THE MINIMUM
REQUIREMENTS OF SAID CITY.
DATED AT MCHENRY, MCHENRY COUNTY, ILLINOIS,
THIS _____— DAY OF --- 20-_.
[ENGINEERS SEAL]
CITY ENGINEER
SURFACE WATER DRAINAGE CERTIFICATE
STATE OF ILLINOIS )
) SS
COUNTY OF MCHENRY )
11-------------------- OWNER, AND 1,----------
PROFESSIONAL ENGINEER OF THE STATE OF ILLINOIS, DO HEREBY CERTIFY THAT TO THE BEST
OF OUR KNOWLEDGE AND BELIEF THE DRAINAGE OF SURFACE WATERS WILL NOT BE CHANGED
BY THE CONSTRUCTION OF THIS SUBDIVISION OR ANY PART THEREOF, OR, IF SUCH SURFACE
WATER DRAINAGE WILL BE CHANGED, REASONABLE PROVISION HAS BEEN MADE FOR
COLLECTION AND DIVERSION OF SURFACE WATERS INTO PUBLIC AREAS, OR DRAINS WHICH THE
SUBDIVIDER HAS A RIGHT TO USE, AND THAT SUCH SURFACE WATERS WILL BE PLANNED FOR
IN ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING PRACTICES SO AS TO REDUCE THE
LIKELIHOOD OF DAMAGE TO THE ADJOINING PROPERTY BECAUSE OF THE CONSTRUCTION OF
THE SUBDIVISION. (MC-89-491)
DATED THIS _—_- DAY OF ___—___—__—___—, 20---_.
OWNER REGISTERED PROFESSIONAL ENGINEER OF ILLINOIS
[ENGINEERS SEAL]
LEGEND
® SET 7/8" O.D.LP.
UNLESS OTHERWISE NOTED
® SET CONCRETE MONUMENT
UNLESS OTHERWISE NOTED
+ SET CROSS IN CONCRETE
UNLESS OTHERWISE NOTED
= UTILITY EASEMENT
= TRAIL EASEMENT
O.D.I.P. = OUTSIDE DIAMETER IRON PIPE
(R) = RECORD BEARING OR DISTANCE
(M) = MEASURED BEARING OR DISTANCE
(C) = CALCULATED BEARING OR DISTANCE
(D) = DEED BEARING OR DISTANCE
B.S.L. = BUILDING SETBACK LINE
U.E. = UTILITY EASEMENT
D.E. = DRAINAGE EASEMENT
P.U.E. = PUBLIC UTILITY EASEMENT
P.O.C. = POINT OF COMMENCEMENT
P.O.B. = POINT OF BEGINNING
P.U. & D.E. = PUBLIC UTILITY AND
DRAINAGE EASEMENT
FINAL PLAT OF SUBDIVISION
AW i Otle-1
111, 1 11,00,51mila-& - - j
OVER
PART OF THE NORTHEAST QUARTER OF SECTION 3,
TOWNSHIP 44 NORTH, RANGE 8 EAST OF THE THIRD
PRINCIPAL MERIDIAN, IN MCHENRY COUNTY, ILLINOIS.
I
THE NORTH LINE OF, THE SOUTI-
rn
m
r*1
r
z
rn
0
TI
m
w
0
c
m
(n
C
c
D
;O
m
m
70
m
z
0
70
m
m
D
cn
O
c
D
m
;:0
0
CA FOUND 7/8" O.D.I.P.
m (HELD)
0
z
, ilJ
I
00
I
FOUND MAG NAIL
(HELD)
PIN: 14-03-251-007
LINE LEGEND
SUBDIVISION BOUNDARY LINE
ADJACENT LAND PARCEL LINE
LOT LINE
EASEMENT LINE
-- — CENTERLINE
--- BUILDING SETBACK LINE
---- SECTION LINE
WEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 3-44-8
I I I I
I I I I
I I I I
I I i I
I I I I
I I I I
I I I I
I I I I
I I I I i
I I I i
i I I I
I i I I
I I i i
I I I I
I I I I
I I I I
i
I I I pF I
I I I
O� I I I h I PIN: 14-03-251-006
'�Z
p1�
11
p 1 1
Y \,S37'34'09"W(M)
- J 75.02'(M)
S89"14'08"W(M)
53.22'(M)
O
-- ---BU'LL- -90LL-EY ROAD
(COUNTY HIGHWAY A32)
DEDICATED BY DOCUMENT 607447 & DOCUMENT 2007R0033306
X ® PIN: 14-03-400-051
Mm
I
FOUND 3/8" REBAR00
w
N 0
o
483.61'
FOUND CONCRETE
RIGHT OF WAY MARKER
NORTH FACE 0.27' NORTH
AREA SUMMARY
GROSS 256,694 SQUARE FEET OR 5.825 ACRES
R.O.W. DEDICATION 10,282 SQUARE FEET OR 0.236 ACRES
NET AREA 246,412 SQUARE FEET OR 5.589 ACRES
(TO HEAVY LINES)
(BASED ON MEASURED VALUES)
PIN: 14-03-251-006
GRAPHIC SCALE
100 0 50 100 200
( IN FEET )
1 inch = 100 ft.
CITY TREASURER'S CERTIFICATE
STATE OF ILLINOIS )
) SS
COUNTY OF MCHENRY )
I, _—_______—___ CITY TREASURER OF
THE CITY OF MCHENRY, ILLINOIS DO CERTIFY THAT THERE ARE NO
DELINQUENT OR UNPAID CURRENT OR FORFEITED SPECIAL ASSESSMENTS
OR ANY DEFERRED INSTALLMENTS THEREOF THAT HAVE BEEN
APPORTIONED AGAINST THE TRACT OF LAND INCLUDED IN THE PLAT.
DATED AT MCHENRY, MCHENRY COUNTY, ILLINOIS THIS ---_ DAY OF
--------------- 20__.
CITY TREASURER
ROADWAY ACCESS CERTIFICATE
STATE OF ILLINOIS )
400
SS y
COUNTY OF MCHENRY )
r rn
m
ROADWAY ACCESS TO COUNTY HIGHWAY NO A32 AS SHOWN ON THIS o N
w
PLAT IS HEREBY APPROVED
DAY OF
MCHENRY CO SUPT OF HIGHWAYS
------------- 20_—.Of
w
U
4
�
w
Q
Z
w
In
O
J
z
3
S
w
�
w
w
z
a
z
o
w
COUNTY CLERK'S CERTIFICATE
W
Q
a
U
STATE OF ILLIN01S )
SS
00
Lu
COUNTY OF MCHENRY )
i
rn
N
COUNTY CLERK OF MCHENRY COUNTY,
ILLINOIS, DO HEREBY CERTIFY THAT THERE ARE NO DELINQUENT GENERAL TAXES, NO UNPAID
o
CURRENT GENERAL TAXES, NO UNPAID FORFEITED TAXES, AND NO REDEEMABLE TAX SALES
o
AGAINST ANY OF THE LAND INCLUDED IN THE ANNEXED PLAT (MC-90-527)
¢
o
z
GIVEN UNDER MY HAND AND SEAL AT WOODSTOCK, MCHENRY COUNTY, ILLINOIS THIS --_
DAY OF , 20__.
^ Z
Lm w o
ci
[COUNTY CLERK SEAL]
r M
® F
—
0 -
COUNTY CLERK
a
a
C)
Z a o�
0
a Of �o
� W 1 Z
J_ OND0
I >M =
J WOO}
0 LJ
�' Q J �
n 3
•`v®' o wzzSz
® N NOS
© J(9CJ0_
FG
4 q ti0
W
a
2 s's
a a a O
az
2
�"ooj Od
FPy~
WO
g
7ryF q
°
a COO W
FOUND 3/4" O.D.I.P.
o�
(HELD)
0
c>
L7
z
z
w
vFi
z
o �
ua u
U
0
pe w ¢
OWNER / SUBDIVIDER:
Z
MCHENRY SENIOR PARTNERS, LLC
802 EAST 86TH STREET
INDIANAPOLIS, IN 46240
Z
W
09
w
ENGINEER:
P.
6
H
Kimley*Horn
0
N
0 2017 KIMLEY-HORN AND ASSOCIATES, INC.
TOOT WARRENVILLE ROAD, SUITE 350,
COT
LISLE, IL 60532
PHONE: 630-487-5550
WWW.KIMLEY-HORN.COM
`¢ 11
=
a
SCALE: I" = 100'
I OF 2
K:\PSDATA\2018 PROJECTS\18.0161\18.0161-02 PLAT\18.0161-02 POSUBSD.DWG I PROJ.NO.: 18.0161-02
K VPs' t,�Hl8 Pro lntsv6-O'61U8-016-02 P to 80151-02 PCSL6sJ... /D/201 ' CP PI6, DK To PC
CORPORATE OWNER'S CERTIFICATE
STATE OF ILLINOIS )
) SS
COUNTY OF MCHENRY )
THIS IS TO CERTIFY THAT THE UNDERSIGNED IS THE OWNER OF THE LAND DESCRIBED IN THE ANNEXED PLAT, AND HAS CAUSED THE
SAME TO BE SURVEYED AND SUBDIVIDED, AS INDICATED THEREON, FOR THE USES AND PURPOSES THEREIN SET FORTH, AND DOES
HEREBY ACKNOWLEDGE AND ADOPT THE SAME UNDER THE STYLE AND TITLES THEREON INDICATED,
THE UNDERSIGNED OWNER HEREBY GRANTS AND DEDICATES FOR PUBLIC USE THE LANDS SHOWN ON THIS PLAT FOR THOROUGHFARES,
STREETS, ALLEYS, EASEMENTS, AND MUNICIPAL AND PUBLIC SERVICES, AND, IN ADDITION THERETO, SUCH OTHER LANDS THAT MAY BE
SPECIFICALLY SHOWN ON THE FACT OF SAID PLAT AS HAVING BEEN DEDICATED.
A NON-EXCLUSIVE EASEMENT FOR SERVING THE SUBDIVISION AND OTHER PROPERTY WITH ELECTRIC, COMMUNICATIONS, SEWER, WATER,
GAS AND DRAINAGE SERVICE IS HEREBY RESERVED FOR AND GRANTED TO THE CITY OF MCHENRY, ILLINOIS; NORTHERN ILLINOIS GAS
COMPANY; COMMONWEALTH EDISON COMPANY; AMERITECH; COMCAST; THEIR RESPECTIVE SUCCESSORS AND ASSIGNS, JOINTLY AND
SEVERALLY, TO INSTALL, OPERATE, MAINTAIN AND REMOVE, FROM TIME TO TIME, FACILITIES USED IN CONNECTION WITH UNDERGROUND
TRANSMISSION AND DISTRIBUTION OF ELECTRICITY, SOUNDS AND SIGNALS, GAS MAINS, SEWER AND WATER MAINS AND DRAINAGE IN,
UNDER, ACROSS, ALONG AND UPON THE SURFACE OF THE PROPERTY SHOWN WITHIN THE DASHED LINES ON THE PLAT AND MARKED
WITH THE WORDS 'EASEMENT", 'UTILITY EASEMENT", 'DRAINAGE EASEMENT", OR SIMILAR WORDS, TOGETHER WITH THE RIGHT TO INSTALL
REQUIRED SERVICE CONNECTIONS UNDER THE SURFACE OF EACH LOT TO SERVE IMPROVEMENTS THEREON, THE RIGHT TO CUT, TRIM OR
REMOVE TREES, BUSHES AND ROOTS AS MAY BE REASONABLY REQUIRED INCIDENT TO THE RIGHTS HEREIN GIVEN, AND THE RIGHT TO
ENTER UPON THE SUBDIVIDED PROPERTY FOR ALL SUCH PURPOSES. OBSTRUCTIONS SHALL NOT BE PLACED OVER GRANTEES FACILITIES
OR IN, UPON OR OVER THE PROPERTY WITHIN THE DASHED LINES MARKED AS ABOVE INDICATED WITHOUT THE PRIOR WRITTEN
CONSENT OF GRANTEES, AFTER INSTALLATION OF ANY SUCH FACILITIES, THE GRADE OF THE SUBDIVIDED PROPERTY SHALL NOT BE
ALTERED IN A MANNER SO AS TO INTERFERE WITH THE PROPER OPERATION AND MAINTENANCE THEREOF.
DATED THIS DAY OF ________, 20_—.
MCHENRY SENIOR PARTNERS. LLC
[CORPORATE SEAL] NAME OF CORPORATION
BY: ----------
PRESIDENT
---------------
ATTEST: _------------ -------
SECRETARY _
NOTARY CERTIFICATE
STATE OF ILLIN01S 1
) SS
COUNTY OF MCHENRY )
I, ___— -------- __---------- A NOTARY PUBLIC IN AND FOR SAID COUNTY, IN THE STATE AFORESAID, DO HEREBY
CERTIFY THATPERSONALLY KNOWN TO ME TO BE PRESIDENT OF
_____ CORPORATION, AND —_—__—__ PERSONALLY KNOWN TO ME BE THE
SECRETARY OF THE _ _--------------- CORPORATION, PERSONALLY KNOWN TO ME TO BE THE SAME PERSONS
WHOSE NAMES ARE SUBSCRIBED TO THE FOREGOING INSTRUMENT, APPEARED BEFORE ME THIS DAY IN PERSON AND SEVERALLY
ACKNOWLEDGED, THAT AS SUCH PRESIDENT AND SECRETARY OF _____-- ____ CORPORATION, THEY HAVE
SIGNED AND DELIVERED SAID INSTRUMENT OF SAID CORPORATION AND CAUSED THE CORPORATE SEAL OF SAID CORPORATION
TO BE AFFIXED THERETO, PURSUANT TO THE AUTHORITY GIVEN BY THE BOARD OF DIRECTORS OF SAID CORPORATION AS THEIR
FREE AND VOLUNTARY ACT, AS THE FREE AND VOLUNTARY ACT AND DEED OF SAID CORPORATION, FOR THE USES AND
PURPOSES THEREIN SET FORTH.
GIVEN UNDER MY HAND AND NOTARIAL SEAL THIS DAY OF , 20
[NOTARY SEAL]
NOTARY PUBLIC
OWNER'S SCHOOL DISTRICT CERTIFICATE
STATE OF ILLINOIS )
) SS
COUNTY OF MCHENRY )
THIS IS TO CERTIFY THAT TO THE BEST OF MY KNOWLEDGE, ALL OF THE LAND LOCATED WITHIN THIS PLAT OF SUBDIVISION
IS LOCATED WITHIN ELEMENTARY SCHOOL DISTRICT _----- AND HIGH SCHOOL DISTRICT
DATED THIS -- ----- DAY OF 20___.
[C 1,114111
OWNER'S SCHOOL DISTRICT NOTARY CERTIFICATE
�11�iT���[ilf
) SS
COUNTY OF MCHENRY )
I, _____—___------------ A NOTARY PUBLIC IN AND FOR SAID COUNTY, IN THE STATE AFORESAID,
DO HEREBY CERTIFY THAT --- —_---_—__—_--- PERSONALLY KNOWN TO ME TO BE THE SAME
PERSON(S) WHOSE NAME(S) ARE SUBSCRIBED TO THE FOREGOING INSTRUMENT AS SUCH OWNER(S), APPEARED
BEFORE ME THIS DAY IN PERSON AND ACKNOWLEDGED THAT THEY SIGNED THE ANNEXED PLAT OF THEIR OWN
FREE AND VOLUNTARY ACT FOR THE USES AND PURPOSES THEREIN SET FORTH.
GIVEN UNDER MY HAND AND NOTARIAL SEAL
THIS ------- DAY OF ------------- —_, 20__.
-------------------------------------
NOTARY PUBLIC
EASEMENT PROVISIONS
AN EASEMENT FOR SERVING THE SUBDIVISION AND OTHER PROPERTY WITH ELECTRIC
AND COMMUNICATION SERVICE IS HEREBY RESERVED FOR AND GRANTED TO
COMMONWEALTH EDISON COMPANY AND SEC TELEPHONE COMPANY, GRANTEES,
THEIR RESPECTIVE LICENSEES, SUCCESSORS AND ASSIGNS JOINTLY AND SEVERALLY, TO CONSTRUCT, OPERATE,
REPAIR, MAINTAIN, MODIFY, RECONSTRUCT, REPLACE, SUPPLEMENT, RELOCATE AND REMOVE, FROM TIME TO TIME,
POLES, GUYS, ANCHORS, WIRES, CABLES, CONDUITS, MANHOLES, TRANSFORMERS, PEDESTALS, EQUIPMENT CABINETS
OR OTHER FACILITIES USED IN CONNECTION WITH OVERHEAD AND UNDERGROUND TRANSMISSION AND DISTRIBUTION
OF ELECTRICITY, COMMUNICATIONS, SOUNDS AND SIGNALS IN, OVER, UNDER, ACROSS, ALONG AND UPON THE
SURFACE OF THE PROPERTY SHOWN WITHIN THE DASHED OR DOTTED LINES (OR SIMILAR DESIGNATION) ON THE
PLAT AND MARKED 'EASEMENT", 'UTILITY EASEMENT", 'PUBLIC UTILITY EASEMENT", 'P.U.E"(OR SIMILAR DESIGNATION),
THE PROPERTY DESIGNATED IN THE DECLARATION OF CONDOMINIUM AND/OR ON THIS PLAT AS COMMON ELEMENTS",
AND THE PROPERTY DESIGNATED ON THE PLAT AS 'COMMON AREA OR AREAS", AND THE PROPERTY DESIGNATED ON
THE PLAT FOR STREETS AND ALLEYS, WHETHER PUBLIC OR PRIVATE, TOGETHER WITH THE RIGHTS TO INSTALL
REQUIRED SERVICE CONNECTIONS OVER OR UNDER THE SURFACE OF EACH LOT AND COMMON AREA OR AREAS TO
SERVE IMPROVEMENTS THEREON, OR ON ADJACENT LOTS, AND COMMON AREA OR AREAS, THE RIGHT TO CUT, TRIM
OR REMOVE TREES, BUSHES, ROOTS AND SAPLINGS AND TO CLEAR OBSTRUCTIONS FROM THE SURFACE AND
SUBSURFACE AS MAY BE REASONABLY REQUIRED INCIDENT TO THE RIGHTS HEREIN GIVEN, AND THE RIGHT TO ENTER
UPON THE SUBDIVIDED PROPERTY FOR ALL SUCH PURPOSES. OBSTRUCTIONS SHALL NOT BE PLACED OVER
GRANTEES'FACILITIES OR IN, UPON OR OVER THE PROPERTY WITHIN THE DASHED OR DOTTED LINES (OR SIMILAR
DESIGNATION) MARKED 'EASEMENT", 'UTILITY EASEMENT", 'PUBLIC UTILITY EASEMENT, 'P.U.E"(OR SIMILAR
DESIGNATION) WITHOUT THE PRIOR WRITTEN CONSENT OF GRANTEES. AFTER INSTALLATION OF ANY SUCH FACILITIES,
THE GRADE OF THE SUBDIVIDED PROPERTY SHALL NOT BE ALTERED IN A MANNER SO AS TO INTERFERE WITH THE
PROPER OPERATION AND MAINTENANCE THEREOF.
THE TERM 'COMMON ELEMENTS"SHALL HAVE THE MEANING SET FORTH FOR SUCH TERM IN THE 'CONDOMINIUM
PROPERTY ACT", CHAPTER 765 ILCS 605/2(C), AS AMENDED FROM TIME TO TIME,
THE TERM 'COMMON AREA OR AREAS"IS DEFINED AS A LOT, PARCEL OR AREA OF REAL PROPERTY, THE BENEFICIAL
USE AND ENJOYMENT OF WHICH IS RESERVED IN WHOLE OR AS AN APPURTENANCE TO THE SEPARATELY OWNED
LOTS, PARCELS OR AREAS WITHIN THE PLANNED DEVELOPMENT, EVEN THOUGH SUCH BE OTHERWISE DESIGNATED ON
THE PLAT BY TERMS SUCH AS 'OUTLOTS", 'COMMON ELEMENTS", 'OPEN SPACE", 'OPEN AREA", 'COMMON GROUND",
'PARKING"AND 'COMMON AREA". THE TERM 'COMMON AREA OR AREAS", AND 'COMMON ELEMENTS" INCLUDE REAL
PROPERTY SURFACED WITH INTERIOR DRIVEWAYS AND WALKWAYS, BUT EXCLUDES REAL PROPERTY PHYSICALLY
OCCUPIED BY A BUILDING, SERVICE BUSINESS DISTRICT OR STRUCTURES SUCH AS A POOL, RETENTION POND OR
MECHANICAL EQUIPMENT.
RELOCATION OF FACILITIES WILL BE DONE BY GRANTEES AT COST OF THE GRANTOR/LOT OWNER, UPON WRITTEN
REQUEST.
PIN: 14-03-251-007
N00°03'35"W(M)
129.83'(M)
LEGEND
OVER
PART OF THE NORTHEAST QUARTER OF SECTION 3,
TOWNSHIP 44 NORTH, RANGE 8 EAST OF THE THIRD PIN: 14-03-251-006
PRINCIPAL MERIDIAN, IN MCHENRY COUNTY, ILLINOIS.
II I I II I
FOUND 7/8" O.D.I.P. I I I I I I
(HELD) I I I
N89'14'08"E(M) 586.54'(M) I I I
i I I II — — — — — — ---
I I I EDrULI�E�ENLT �����I �30,
A�»Z-Z_LLL22'LIII_,T��
rn
0
on
0
nD
Cm
K 0
m�
Z O
z=
Cm
Co
m�
(0 O
C0 rn
o=
rnz
CP m
00
m
m
PIN:14-03-251-006
GRAPHIC SCALE
( IN FEET )
1 inch = 40 ft.
PLANNING AND ZONING COMMISSION CERTIFICATE
STATE OF ILLINOIS
)> SS I I I I I I I V) COUNTY OF MCHENRY )
O
O 1 HEREBY CERTIFY THAT ON 20___ THE
/I 4� ANNEXED PLAT WAS PRESENTED TO AND DULY APPROVED BY THE
Ui PLANNING AND ZONING COMMISSION OF THE CITY OF MCHENRY AND THAT
25' I 6 C I 125. I I L17 SAID PLAT CONFORMS IN ALL RESPECTS TO THE REQUIREMENTS OF THE
NiSUBDIVISION CONTROL AND DEVELOPMENT ORDINANCE OF THE CITY OF
^j MCHENRY, ILLINOIS,
PLANNING AND ZONING COMMISSION CHAIRMAN
I 00 I I I ���
w I I I Ilo
I I Z o
Z o l I I I wl I e�P�P° I LETTER OF AUTHORIZATION TO RECORD
U
� �
I
I I �s§ I I I
I I W o I w>� I I AFTER RECORDING MAIL TO:
a I w I a I I I I CITY OF MCHENRY
vw I m I o o I� OFFICE OF THE CITY CLERK
> I a I w o cc I 333 SOUTH GREEN STREET
N I MCHENRY IL 60050
I z I omm
�
U I i (815)363-2100
i I
j
> I w a I W� I rn 1 I I I
w I I 3 z 4 I I /l PURSUANT TO CHAPTER 765 ILLINOIS COMPILED STATUTES, SECTION 205/2,
m I I < Z I m l I I I I / THE UNDERSIGNED REGISTERED ILLINOIS LAND SURVEYOR HEREBY
ZONED 1-1 I F w z I I I I I I I / i DESIGNATES
o I i I I I I YY �� OF THE CITY OF MCHENRY 333 SOUTH GREEN STREET, MCHENRY ILLINOIS
I m I o o I li` I / Q�° 60050, TO ACT IN HIS/HER PLACE AND STEAD IN PRESENTING THE FINAL
ro l a
z I I0 I I II I - - - PLAT OF---------------
o I I I SUBDIVISION FOR RECORDING WITH THE MCHENRY COUNTY RECORDER OF
o I89'14'08"W M DEEDS. SAID FINAL PLAT BEING PREPARED AND LAST REVISED BY SAID
( SURVEYOR ON — -------- —__—---- ___ 20___.
o I �:wa L--- -i 53.22'(M)
co
o i i I I } DATED THIS — ----- —__ DAY OF
----------
z < I I I
a
CCD I I I z I �� [SURVEYORS SEAL] _
F I I o I <
SIGNATURE OF SURVEYOR
�< I z l I
I Q ow
w l I w
I w I w l a SURVEYOR #
25' I w °' w l V WETLANDS
u, a r I ¢ I I I I I IN)O ---- —---------- ------------ ---
N ..p STREET ADDRESS
J I I I M I I N
p CITY/STATE/ZIP CODE
Rl
I TELEPHONE NUMBER
-------------
i I s
I 21.
OUTLOT 3
110' I I I RESTRICTED PROPERTY PER
i 3 I DOCUMENT NO. 2004ROO87029
---- I 30 j0 I I ( -
�--�----� THE SOUTH LINE OF THE NORTHEAST
- �-� --T I QUARTER OF SECTION 3-44-8
_ 10' UTI ITY EASENENT N g° 4' 4 ' I
I N
No HEREBY DEDICATED TO MCHENRY COUNTY FOR ROADWAY PURPOSES I I I I I 0-614200'---
S89°1 4'08"W(M) 451.75'(M) s
i r' o.o.i.P.
NORTH
BULL —/A —� W)A —
(COUNTY HIGHWAY A32) N
DEDICATED BY DOCUMENT 607447 & DOCUMENT 2007R0033306
C 17
mm
m
PIN: 14-03-400-051
ABBREVIATIONS
SET 7/8" O.D.I.P.
UNLESS OTHERWISE NOTED
SET CONCRETE MONUMENT
UNLESS OTHERWISE NOTED
+ SET CROSS IN CONCRETE
UNLESS OTHERWISE NOTED
O.D.I.P. = OUTSIDE DIAMETER IRON PIPE
(R) = RECORD BEARING OR DISTANCE
(M) = MEASURED BEARING OR DISTANCE
(C) = CALCULATED BEARING OR DISTANCE
(D) = DEED BEARING OR DISTANCE
B.S.L. = BUILDING SETBACK LINE
U.E. = UTILITY EASEMENT
D.E. = DRAINAGE EASEMENT
P.U.E. = PUBLIC UTILITY EASEMENT
P.O.C. = POINT OF COMMENCEMENT
P.O.B. = POINT OF BEGINNING
P.U. & D.E. = PUBLIC UTILITY AND
DRAINAGE EASEMENT
LINE LEGEND
SUBDIVISION BOUNDARY LINE
ADJACENT LAND PARCEL LINE
LOT LINE
- - - - EASEMENT LINE
--- CENTERLINE
--- BUILDING SETBACK LINE
---- SECTION LINE
REFERENCE BENCHMARK
MCHENRY COUNTY BENCHMARK #7534
DATUM: NAVD88
ELEVATION = 753.93
= UTILITY EASEMENT
= TRAIL EASEMENT
SURVEYOR'S CERTIFICATE
STATE OF ILLINOIS
) SS
COUNTY OF MCHENRY )
THIS IS TO CERTIFY THAT I,
AN ILLINOIS REGISTERED LAND SURVEYOR, HAVE SURVEYED, SUBDIVIDED, AND PLATTED
FOLLOWING DESCRIBED PROPERTY, LOCATED WITHIN THE CITY OF MCHENRY, ILLINOIS,
CONSISTING OF ------ ------- (------ ) ACRES:
[LEGAL DESCRIPTION]
AS SHOWN BY THE PLAT HEREON DRAWN, WHICH IS A CORRECT AND ACCURATE
REPRESENTATION OF SAID SURVEY AND SUBDIVISION. ALL DISTANCES ARE SHOWN IN FEET AND
DECIMALS THEREOF. I FURTHER CERTIFY THAT ALL REGULATIONS ENACTED BY THE CITY OF
MCHENRY RELATIVE TO PLATS AND SUBDIVISIONS HAVE BEEN COMPLIED WITH IN THE
PREPARATION OF THIS PLAT, THAT THE PROPERTY COVERED BY THIS PLAT OF SUBDIVISION
(IS) (IS NOT) LOCATED WITHIN A SPECIAL FLOOD HAZARD AREA AS IDENTIFIED FOR THE CITY
OF MCHENRY, ILLINOIS, BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY ON THE FLOOD
INSURANCE RATE MAP, PANEL NO, DATED
AND THAT I HAVE SET ALL SUBDIVISION MONUMENTS AND HAVE DESCRIBED THEM ON THIS
FINAL PLAT AS REQUIRED BY THE PLAT ACT. (MC-88-447; MC-89-503; MC-90-527)
DATED AT ILLINOIS,
THIS _—__ DAY OF ___A.D., 20__.
ILLINOIS REGISTERED SURVEYOR
[SURVEYORS SEAL]
REGISTRATION NUMBER
K:\PSDATA\2018 PROJECTS\18.0161\18.0161-02 PLAT\18.0161-02 POSUBSD.DWG