HomeMy WebLinkAboutMinutes - 10/20/2001 - Planning and Zoning Commission
CITY OF MCHENRY
PLAN COMMISSION
DECEMBER 20, 2001
North Gate Preliminary Plat and North Gate Final Plat Phase I
Riverside Hollow – Final Plat
A meeting of the City of McHenry Plan Commission was held on Thursday, December 20, 2001.
Chairman Buhrman called the meeting to order at 7:30 p.m. with the following persons in
attendance:
1. Plan Commissioners: Buhrman, Cadotte, Ekstrom, Franzen, Howell, Thacker. Absent:
Nadeau, Osmon, Semrow.
2. City Attorney: Kelly Cahill.
3. Recording Secretary: Absent.
4. City Planner: Douglas Martin.
5. Director of Community Development: Absent.
6. Applicants:
a. McHenry 31 LLC represented by Samuel Diamond, Jim Schaid, Jim Condon, 3431
West Elm Street, McHenry, IL 60050.
b. Kennedy Homes represented by Bill Koclanis, 1081 East Main Street, East Dundee,
IL 60118.
7. City Council/Staff: None.
8. Court Reporter: None.
9. Registered Observers/Objectors: None.
North Gate - Preliminary Plat
In attendance were property owners and developers Samuel Diamond of Diamond,
LeSueur and Associates, Jim Schaid of Remax Plaza, and Jim Condon of Condon Consulting
Engineers.
Mr. Diamond stated the Preliminary Plat before the Commission this evening is for the
entire North Gate Development. The Final Plat is for Phase I (Lot 1 ) of the subdivision. The
remainder of the development will be included in Phase II. The property is located just north of
the Rubloff Development on the west side of Route 31.The parcel is approximately 23 acres
which includes some wetlands.
Mr. Diamond noted the Preliminary Plat includes sliver lots so that a potential user can
determine the size of lot required for each particular use. The developers have a contract with
Home State Bank for development of Lot 1, as shown on the Final Plat of Phase I of the North
Gate Development. Mr. Diamond noted the property is currently zoned C5 Highway
Commercial. The developers intend to set aside a portion of the site for dedication to the City for
use of sign installation.
Mr. Diamond noted Phase I would be developed utilizing well and septic. However, the
Subdivision would be built so that it is City water and sewer ready. It is anticipated Phase II will
be immediately connected to City utilities.
Mr. Condon went over the comments provided by City Staff and City Engineering firm
Baxter and Woodman. With regard to Assistant Director Marcinko’s correspondence of
September 10, 2001 regarding the Preliminary Plat, Mr. Condon noted the following:
Page 2
PC
12/20/01
1. Illinois Route 31 right-of-way should match Rubloff Development right-of-way:
proposed right-of-way exceeds the Rubloff right-of-way;
2. Label future connection “hereby dedicated to the City of McHenry for future public
right-of-way”: developer concurs to label access easement with this language;
3. Illinois Route 31 plans must have same cross-section design as Rubloff Development
plans: the Developers request permission to have specification conform to Illinois
Department of Transportation (IDOT) standards, as Route 31 is a state highway;
4. Traffic Study must be submitted to determine if a traffic signal is warranted:
developer concurs with this point, but would like to hold off until Phase II is
concluded;
5. Public right-of-way must be in compliance with C-5 Highway Commercial Zoning:
Both Baxter and Woodman and Assistant Director Marcinko commented on this
matter. It is a point of contention the proposed roadway is not a collector street, but a
minor street, and should be constructed according the specifications for a minor street
as designated in the Subdivision Control Ordinance;
6. All gateway features and green space setbacks will be in compliance with
requirements of the Comprehensive Plan and Development Policies adopted in
August, 1999; a 50’ gateway setback would be provided.
Discussion occurred regarding the subject correspondence of September 10th which was not
provided in the Plan Commissioners Packets for this evening’s meeting. It was the consensus of
the Commission that all related correspondence be provided in agenda packets prior to each
meeting.
A discussion followed regarding the construction of North Gate Boulevard and the possibility it
might become a major collector and that it be constructed accordingly. It was noted in light of an
access easement from North Gate Boulevard to the dedicated City’s triangular piece of property
to the west, North Gate Boulevard should be constructed to accommodate high volumes of
traffic. It was the contention of the Developers North Gate Boulevard should not be classified or
constructed as a collector street. A lengthy discussion continued.
In response to commission inquiry, Attorney Diamond noted Staff did not request direct access
to the triangular parks parcel immediately west of the proposed North Gate Boulevard. However,
the Developers chose to provide for the 60’ access in the event the City at some future time
decided to access the parkland via this development. Discussion continued. In response to an
inquiry, the difference between construction of a minor street and the construction of a collector
street was provided. Mr. Condon noted the Staff memo of November 30, 2001 regarding the
Final Plat of Phase I, points #5,6 and 8 are also in contention at this time and are directly related
to similar points in the September 10th memo regarding the Preliminary Plat of the entire
development.
Mr. Condon addressed Baxter and Woodman comments of December 18, 2001 correspondence
which was not provided to the Commissioners in their Agenda packets. Mr. Condon noted the
Developers will assure with the McHenry County Recorder’s Office there is no other recorded
subdivision having the same name “North Gate”. The well and septic systems for Lot 1 will be
considered temporary. Noting the discrepancy in the wetlands delineation, Mr. Condon stated the
initial request to the Army Corps of Engineers was for the entire 61-acre McHenry parcel along
Page 3
PC
12/20/01
Route 31, both east and west of the highway. The proposed development on the west side only of
Route 31 is a 23-acre parcel. Mr. Condon noted in Phase I no wetlands are being disturbed.
Therefore no permits or approval are required by the Army Corps of Engineers for Phase I.
Referencing Baxter and Woodman notes that 80% of the minimum lot area shall be at least 3 feet
above the highest ground water level, Mr. Condon stated this is not appropriate for commercial
property on which no basements will be constructed. He noted the Developers will be seeking a
variance from the requirement that this note be included on the plat. Additionally, the Developers
will required two other variances:
1. Sidewalk requirement;
2. Cul-de-sac length.
Questions by Members of the Commission
In response to commission inquiry, Attorney Diamond responded the septic system would meet
county specifications. Referencing the sidewalk waiver being requested, Mr. Condon stated the
Developers would be asking that all requirements for sidewalks be waived, including those
internal to the subdivision, as well as those required along Route 31. Discussion regarding
sidewalk placement and waiver occurred.
It was noted as the property is zoned commercial, there could be some property uses which
would benefit from sidewalk installation, such as a restaurant. Lengthy discussion occurred
regarding the desirability or necessity of sidewalk installation in the development.
Noting the utilization of well and septic for Lot 1, Home State Bank, question was raised as to
provisions for fire safety. Mr. Condon stated if the building was required to be sprinklered, the
well would be required to meet the fire flows. Each lot could be sold and developed on well and
septic until such time as City utilities are installed.
In response to commission inquiry, the subdivision covenants will assure that no buildings will
have the rear facing Route 31. If the back of the building faces Route 31, it will appear to be the
front of the building, architecturally.
North Gate Phase 1 – Final Plat
Mr. Condon proceeded to review Staff comments regarding the North Gate Final Plat of Phase I.
He asked the City to abide by IDOT’s recommendation regarding acceleration and deceleration
lanes on Route 31.The Developers are willing to install to exit lanes from the subdivision, to
permit left-hand, northbound turns, and right-hand, southbound turns. The Developers concur the
radius from back of curb should be at least 40’ to the back of curb at the Route 31 intersection.
The Developers intend to install a full temporary cul-de-sac as opposed to the indicated T-turn
around. Mr. Condon noted the Developers will work with City Engineers Baxter and Woodman
to assure satisfactory compliance with engineering and drainage concerns.
The two major areas of contention are that IDOT right-of-way requirements be met and that the
street be classified as a minor street as opposed to a collector street.
Page 4
PC
12/20/01
Mr. Condon in reviewing the review by Baxter and Woodman dated November 29, 2001, noted
the Developer concurred with the review. Issues of concern and contention were, again, the
classification of the street and construction requirements as a result, and drainage issues resulting
from surface flow from the Rubloff Development. Mr. Condon noted the Rubloff Development
drains through the wetlands on the subject property to the north to the creek. He noted the
Developers are providing onsite detention which will release into the wetlands, and the drainage
will ultimately find its way to the creek to the north. The wetlands on the subject property are
being protected by buffering from the project’s development
Questions by Members of the Commission
In response to commission inquiry, the detention would be located on Outlot A, which is not a
part of the Final Plat of Lot 1.
Planner Martin suggested if the Commission makes a recommendation to the City Council
regarding the Preliminary Plat of North Gate Subdivision and/or the Final Plat of Phase I of
North Gate Subdivision, the Commission address the following:
Requirement for installation of sidewalks variance request;
Cul-de-sac length variance request;
Other variances as deemed necessary by City Staff in working in conjunction with the
applicant;
Minor versus Collector Roadway determination should be agreed upon between Staff and
the applicant prior to presentation to City Council.
It was noted there are several outstanding issues which should be rectified prior to bringing this
matter before Council for approval. The applicant noted most points addressed in the Staff
Memo and Baxter and Woodman correspondence have been agreed to by the developers.
Recommendation
Motion by Franzen, seconded by Howell, to recommend to the City Council that
the Preliminary Plat of North Gate Subdivision prepared by Condon Consulting
Engineers, last revised 12/10/01 be approved, subject to the following:
1. Installation of sidewalks throughout the subdivision;
2. Installation of street lights throughout the subdivision;
3. All issues raised by City Staff and Baxter and Woodman be resolved with the
applicants prior to presentation of the plat for action before the City Council.
Voting Aye: Buhrman, Cadotte, Franzen, Ekstrom, Howell, Thacker
Voting Nay: None.
Not Voting: None.
Abstained: None.
Absent: Nadeau, Osmon, Semrow,
Motion carried 6-0.
Page 5
PC
12/20/01
Motion by Franzen, seconded by Howell, to recommend to the City Council that
the Final Plat of North Gate Subdivision Phase I, prepared by Vanderstappen Surveying
Inc, with a revision date of 12/13/01 be approved, subject to the following:
1. Installation of sidewalks throughout the subdivision;
2. Installation of street lights throughout the subdivision;
3. All issues raised by City Staff and Baxter and Woodman be resolved with the
applicants prior to presentation of the plat for action before the City Council.
Voting Aye: Buhrman, Cadotte, Franzen, Ekstrom, Howell, Thacker
Voting Nay: None.
Not Voting: None.
Abstained: None.
Absent: Nadeau, Osmon, Semrow,
Motion carried 6-0.
Riverside Hollow – Final Plat
In attendance was Bill Koclanis of Kennedy Homes, recent purchasers of the Riverside Hollow
Subdivision. Mr. Koclanis noted there were three primary issues at the time of Preliminary Plat
Approval for Riverside Hollow:
1. Increased depth of lots abutting the right-of-way of FAP420
2. Buffer along Orchard Beach Drive to include preservation of existing trees
3. Entrance onto Orchard Beach Drive through the Riverside Hollow Subdivision.
Mr. Koclanis noted the developers have dedicated an additional 15’ along the east property line
for future roadway expansion of Orchard Beach Road. Preservation of the trees could prove
difficult as Staff has requested the installation of a 5’ high PVC fencing along the property’s
eastern boundary. The fence will not be installed on Lot 96, however. A tree survey was
submitted. The applicant will be required to replace any substantial trees which are removed
during development of the property.
Planner Martin noted the applicant is planning to vacate the portion of Orchard Beach Avenue
which intersects with Riverside Drive. The road will be vacated from Riverside Drive to Lot 3,
essentially closing off the intersection. Residents of Orchard Beach Subdivision will have to
access their subdivision via the Riverside Hollow Subdivision. In response to commission
inquiry, the annexation of Riverside Hollow will extend to the other side of Orchard Beach
Avenue. With the elimination of the Orchard Beach Avenue and Riverside Drive intersection,
the access to the Orchard Beach Subdivision will be much safer. No improvements will be made
to Orchard Beach Road or Orchard Beach Avenue.
Planner Martin noted Orchard Beach Road would not at this time be improved by the City. Land
would be dedicated by the developer to the City to assist in widening the roadway. Discussion
occurred regarding Outlot 96. It was noted it will be utilized as a detention pond for the
Page 6
PC
12/20/01
subdivision. In response to commission inquiry, the piping to the river will traverse through Lot
8. Discussion followed regarding the private status of Orchard Beach Road.
In response to commission inquiry, Mr. Koclanis stated the Staff comment regarding the buffer
required between the FAP420 right-of-way and lots 26 through 35 had been addressed. These
lots are 160 feet in depth, which is 40 feet more than required. Mr. Koclanis stated there is no
specific buffering plan to protect lot owners from the FAP420 right-of-way. The Final Plat will
contain a denotation the FAP420 land has been dedicated to the State of Illinois. The possibility
of the roadway extension will be made clear to all potential property owners of Lots 23 through
39. The commission suggested the developers include information in their advertising brochures
advising the public of the adjacent FAP420 right-of-way for Lots 23 through 39.
Planner Martin noted the developers intend to construct a five-foot cedar fence along the east
property line to buffer the existing Orchard Beach Subdivision from the new development.
Additionally, the developers have made provisions to dedicate 15 feet of property to the City
along the east property line to be utilized for the expansion of Orchard Beach Road.
Commissioners expressed concern regarding the 15-foot wide dedication of land east of the
developers fence on the east property line, and the potential property maintenance of this strip of
land. If it is dedicated to the City, the City would then be responsible for weed mowing and other
maintenance issues. Discussion occurred regarding the possibility of dedicating this 15-foot strip
to the Orchard Beach Homeowners Association. Planner Martin also noted the Tree Preservation
Ordinance will be followed. Many trees contained within the development are not required to be
saved. Those that are, will either be left as is, relocated or replaced, as required by the ordinance.
Regarding the third Staff comment to include a small park area to be preserved for potential
connection between Riverside Hollow and Orchard Beach Subdivision, Mr. Koclanis noted the
residents of Orchard Beach Subdivision are opposed to any future connection between the two
subdivisions. Therefore, this point was not addressed on the plat.
Recommendation
Motion by Franzen, seconded by Cadotte, to recommend to the City Council that
The Riverside Hollow Final Plat as prepared by V3 Consultants and dated 11/12/01 be
approved subject to the following conditions:
1. All promotional literature for sales would include detailed information informing potential
buyers that Lots 23 through 39 abut the proposed FAP420 right-of-way;
2. The buffer along Orchard Beach Subdivision has been addressed with a five-foot cedar fence
to be constructed by the developers on the east property line;
3. Staff comment requiring preservation of an open area to be utilized for a possible future
interconnection between Orchard Beach Subdivision and Riverside Hollow shall be
disregarded as no interconnection is sought at this time;
Voting Aye: Buhrman, Cadotte, Franzen, Ekstrom, Howell, Thacker
Voting Nay: None.
Not Voting: None.
Abstained: None.
Absent: Nadeau, Osmon, Semrow,
Motion carried 6-0.
Page 7
PC
12/20/01
Adjournment
Motion by Ekstrom, seconded by Cadotte, to adjourn the meeting at 9:26 p.m.
Voting Aye: Buhrman, Cadotte, Ekstrom, Franzen, Howell, Thacker.
Voting Nay: None.
Not Voting: None.
Abstaining: None.
Absent: Nadeau, Osmon, Semrow.
Motion carried 6-0.
Respectfully submitted,
Kathleen M. Kunzer, Deputy Clerk
Recording Secretary
McHenry Plan Commission
C: Mayor, Aldermen, City Administrator, City Clerk, City Attorney, City Planner, City
Engineers, Petitioners, Landmark Commission Chairman, Chicago Tribune, Northwest Herald,
Aldermen Conference Room, File Copy.