Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPacket - 11/02/2015 - City CouncilAGENDA -
REGULAR CITY COUNCIL MEETING
Monday, November 2, 2015, 7:00 PM
1. Call to Order
2. Roll Call
3. Pledge of Allegiance
4. City of McHenry Mission Statement
5. Public Comment: Any person wishing to address the City Council will be required to step forward to the
podium and identify themselves for the record and will be asked but are not required to provide their
address. Public comment may be restricted to three -minutes for each individual speaker. Order and
decorum shall be maintained at public meetings.
6. Motion to approve the following Consent Agenda Items:
A. Resolution supporting the Development of Intergovernmental Agreements for the Consolidation of
Police Dispatch Services at an Expanded McHenry Dispatch Center;
B. Authorization to advertise for bids for Phase 1 Construction of the Municipal Center Improvements
project;
C. Motion to reject bid from Continental Construction of Evanston, IL and award bid to Keno &Sons of
Lake Bluff, IL for construction of the Fieldstone Lift Station Rehabilitation project for an amount
not to exceed $169,000;
D. Motion to approve September 14, 2015, September 21, 2015, and October 5, 2015 City Council
meeting minutes; and
E. List of Bills in the amount of $553,097.86.
7. Motion to approve application from AKLSC, LLC d/b/a Lucky Louise's located at 341 Front Street, for a
Class Al liquor license and Ordinance increasing the number of Class Al license in effect from one (1) to
two (2)
8. Motion to approve application from Highland Parlc CVS, LLC d/b/a CVS Pharmacy #10470 located at
3900 West Elm Street, for a Class F2 liquor license and Ordinance increasing the number of Class F2
licenses in effect from nine (9) to ten (10)
9. Motion to authorize the Mayor's execution of an Easement Agreement between the City of McHenry and
McHenry Country Club for the purchase of a 1,593 sq. ft. perpetual utility easement in the amount of
$60,464; and granting use to the city of a Temporary Construction Easement to facilitate the conveyance of
sanitary sewer lines to the South Wastewater Treatment Plant
The City of McHenry is dedicated to providing its citizens, businesses, and visitors with the highest quality of programs and services
in acustomer-oriented, efficient, and fiscally responsible manner.
McHenry City Council
November 2, 2015
Page Two
10. Motion to authorize the Mayor's execution of a Professional Services Agreement with HR Green, Inc. for
Water Tower No. 3 Repainting and Maintenance Repair Bidding and Construction Coordination Services
for an amount not to exceed $37,833; and, authorization to Advertise for Bids for the project
11. Motion to authorize the Mayor's execution of an IDOT Preliminary Engineering Services Agreement for
Federal Participation with HR Green, Inc. for an amount not to exceed $29,990.27 for Phase I Engineering of
Curran Road S-Curve Safety Improvements and the City Clerk's execution of an IDOT Resolution for
Improvement by Municipality under the Illinois Highway Code for same
12. Motion to approve an amendment to the FY15/16 Budget in the amount of $29,000 for the establishment of a
Director of Building & Neighborhood Services
13. Motion to approve the City of McHenry Police Pension Fund Annual Report for FY2014/15
14. Mayor's Statement and Reports
15. Committee Reports
16. Staff Reports
17. Future'Agenda Items
18. Adjournment
The City of McHenry is dedicated to providing its citizens, businesses, and visitors with the highest duality of programs and services in a
customer -oriented, efficient, and fisca!!y responsible manner.
Derik Morefield, City Administrator
McHenry Municipal Center
333 Green Street
McHenry, Illinois 60050
Phone: (815) 363-2100
Fax: (815) 363-2119
dmorefield@ci.mchenry.il.us
CITY COUNCIL MEETING
CONSENT AGENDA SUPPLEMENT
DATE: November 2, 2015
TO: Mayor and City Council
FROM: Derik Morefield, City Administrator
John Jones, Chief of Police
RE: Motion to Adopt a Resolution Supporting
Intergovernmental Agreements Resulting in the
Services at an Expanded McHenry Dispatch Center
ATT:
Resolution
BACKGROUND:
the Development of
Consolidation of Dispatch
On June 29, 2015, Governor Rauner signed SB0096, a piece of legislation which is bringing
dramatic changes to the public communication landscape in Illinois by mandating the
consolidation of public safety answering points (PSAPs) which provide 9-1-1 dispatching for
police, fire and rescue services. These consolidation efforts are aimed both at the number of
PSAPs in any one system and at the number of Emergency Telephone System Boards (ETSBs) in
any one county.
In summary, those counties with a population greater than 250,000 but less than one million
will be required to reduce the number of PSAPs per ETSB to 2 or 50% of their current number,
whichever is greater. In McHenry County, there is currently one ETSB and six (6) PSAPs —
SEECOM, McHenry County Sheriff's Department, Harvard, Woodstock, Lake In The Hills, and
McHenry. Therefore, the number of PSAPs in McHenry County will be reduced by three (3).
The new law requires that any entity subject to consolidation must submit a plan to the State 9-
1-1 Administrator by July 1, 2016 for the required consolidation and that the consolidations be
completed by July 1, 2017. In McHenry County, the local ETSB is responsible for submitting the
consolidation plan to the 944 Administrator. To date, the McHenry County ETSB has
The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest
quality of programs and services in acustomer-oriented, efficient and fiscally responsible manner.
identified that they would like to make a recommendation to the State 9-1-1 Administrator by
January 1, 2016 and they have encouraged collaboration between the existing PSAPs to develop
a plan for consolidation to conform to the legislative mandate.
ANALYSIS:
More than five (5) years ago, and far prior to the mandated consolidation legislation, the City of
McHenry analyzed the outsourcing of emergency dispatch services and, after consideration by
the City Council, chose to maintain dispatch services and develop a plan for the growth of the
dispatch center. Once this commitment was made, McHenry approached the project by
looking at the local dispatch "industry" to identify unmet needs. A non -biased inspection of the
existing dispatch services in the county identified that most were focused on the provision of
police dispatching and some offered dispatching for fire and EMS agencies. With this
information, McHenry then began discussions with local fire departments to identify what they
envisioned in a dispatch center.
Fast -forward to 2015 and vision for an expanded McHenry Dispatch Center that provides
specialized police, fire and EMS dispatching for multiple agencies in McHenry County has
become a reality. We have been able to develop partnerships with the Village of Johnsburg
Police Department, McCullom Lake Police Department, Marengo Fire, Marengo Rescue and
Union Fire. Early in 2015 we also partnered with the McHenry Township Fire Protection District
to facilitate the establishment of a dedicated fire seat. Through these partnerships we have
established an advisory board to provide operation input as to the center. The formal
partnership with the McHenry Township Fire Protection District also established that they have
equal representation in regards to hiring decisions, budgetary structure, training initiatives and
other administrative decisions.
This combination of vision and legislative mandate has established the McHenry Dispatch
Center as a logical choice for the location of one of the three (3) remaining PSAPs in McHenry
County. The McHenry location not only offers the greatest and most cost-effective opportunity
for physical expansion but, through expansion/consolidation with other existing PSAPs, we
believe that we can truly meet the spirit of consolidation by offering a cost savings through
partnerships.
In the short period of time since the consolidation legislation was signed into law, McHenry has
participated in a series of meetings with other existing PSAPs and partner agencies to
determine a potential course for consolidation. We have now reached the point where these
efforts begin to be formalized. The first step in this process, since McHenry is serving as the
"host" entity for the consolidation effort, is to adopt a resolution authorizing the development
of Intergovernmental Agreements (IGAs) with partner entities that would lead to our ability to
develop a consolidation plan for presentation to the McHenry County ETSB in December. While
there are many details that need to be addressed through the IGAs, we believe that it is
important that the consolidated McHenry Dispatch Center be maintained under the structure
of the McHenry Police Department with the establishment of a an expanded administrative
board that has input and authority over such areas as personnel, budget, and operations. The
attached resolution includes language which allows for this to be included in the development
A individual IGAs.
RECOMMENDATION:
As identified above, staff believes that positive momentum has been created for the expansion
A the McHenry Dispatch Center through consolidation efforts with McHenry County partner
agencies. With an understanding that there are many details yet to be negotiated through the
development of IGAs, the next step in the process is, through the adoption of the attached
resolution, for McHenry to take a leadership role in the consolidation process.
In terms of timing, the goal is to continue collaboration efforts with partners to develop a plan
for consolidation to present to the McHenry County ETSB in December. A part of this process
will include identifying and addressing issues for the development of individual IGAs. If a
positive response is received from the ETSB, IGAs can be drafted and presented to the
respective elected bodies of partner agencies for consideration.
In regards to the physical location of the consolidated dispatch center, tentatively, with the
completion of the McHenry Recreation Center, the plan is to finalize build -out plans for
relocating Police Administration to the current Recreation space and for the expansion of the
existing dispatch space. Much of the initial planning for this has already been done as part of a
space needs analysis that was completed by FGM Architects in 2014. Moving forward this will
include the development of construction specifications and preparation to request to advertise
for bid for this work. Again, this will be included in the development of the consolidation plan
for the ETSB.
Therefore, if Council concurs, it is recommended that the attached — A Resolution Supporting
the Development of Intergovernmental Agreements Resulting in the Consolidation of
Dispatch Services at an Expanded McHenry Dispatch Center — be approved.
A RESOLUTION SUPPORTING THE DEVELOPMENT OF
INTERGOVERNMENTAL AGREEMENTS RESULTING IN THE CONSOLIDATION
OF DISPATCH SERVICES AT AN EXPANDED MCHENRY DISPATCH CENTER.
WHEREAS, the City of McHenry, under the organizational structure of the McHenry
Police Department, currently operates an emergency dispatch center ("McHenry Dispatch
Center")* and,
WHEREAS, the City of McHenry has entered into various Intergovernmental
Agreements to provide police and fire dispatch services for the McHenry Township Fire
Protection District, McCullom Lake Police Department, Johnsburg Police Department, Marengo
Fire, Marengo Rescue, and Union Fire: and,
WHEREAS, the City of McHenry has a strategy in place for the expansion of the
McHenry Dispatch Center within the physical structure of the McHenry Municipal Center: and,
WHEREAS, the State of Illinois has adopted certain legislation mandating the
consolidation of emergency dispatch services with the impact of a reduction in the number of
emergency dispatch centers in the County of McHenry from six (6) to three (3): and,
WHEREAS, it is in the best interest of the City of McHenry to work collaboratively with
other jurisdictions in the County of McHenry, including those that currently provide emergency
dispatch services, to partner in the development of a plan for the consolidation of dispatch
services through an expanded McHenry Dispatch Center; and,
WHEREAS, it is recommended that this plan for the consolidation of dispatch services
be characterized by: 1) a collaborative decision -making model; 2) the establishment of an
administrative oversight structure that provides for an equal partnership between the City of
McHenry and partner organizations in order to collaboratively develop dispatch center policy
and procedure, define best operational practices, oversee the hiring process of new employees,
develop and recommend the annual budget and rate structure, and provide direction on
expansion/growth of the physical dispatch center; and 3) guaranteeing, to the extent possible, the
opportunity for existing dispatch personnel, other than those already employed by the City of
McHenry Police Department, to fill any new positions created through this consolidation; and,
WHEREAS, these organizational partnerships shall be implemented through the
development and adoption of Intergovernmental Agreements; and,
WHEREAS, the consolidated and expanded McHenry Dispatch Center, with planning
and policy administration determined collaboratively by the equal organizational partnerships
established and adopted under the Intergovernmental Agreements, will remain under the
structural auspices of the City of McHenry and McHenry Police Department.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF MCHENRY, MCHENRY COUNTY, ILLINOIS, AS FOLLOWS:
SECTION 1: That there is support for maintaining emergency dispatch services and for
the location of a consolidated and expanded McHenry Dispatch Center within the physical
structure of the McHenry Municipal Center.
SECTION 2: That there is support for efforts to work collaboratively with other
jurisdictions to develop a plan for the consolidation of emergency dispatch services in the
County of McHenry.
SECTION 3: That there is support for the establishment of an administrative oversight
structure comprised of representatives of partner organizations for the expanded. McHenry
Dispatch Center.
SECTION 4: That the Mayor and City Staff have the authority to continue to discuss the
development of a consolidated emergency dispatch center through the expansion of the McHenry
Dispatch Center.
SECTION 5: That the resulting plan be furthered through the development and
implementation of Intergovernmental Agreements between the City of McHenry and partner
organizations.
Dated this
Voting Aye:
Voting Nay:
Not Voting:
Abstaining:
Absent:
ATTEST:
City Clerk
day of November, 2015.
Mayor
Office of the City Administrator
Bill Hobson, Deputy City Administrator
McHenry Municipal Center
333 Green Street
McHenry, Illinois 60050
Phone: (815) 363-2100
Fax: (815) 363-2119
www.ci.mchenry.il.us
CONSENT AGENDA
DATE: November 2, 2015
TO: Mayor and City Council
FROM: Bill Hobson, Deputy City Administrator
RE: Municipal Center Improvements Phase I
ATT: Bid Drawings
On April 6, 2015, the City Council approved the Mayor's execution of a Professional Services
Agreement with FGM Architects for the design and bid document preparation for the first phase
of the Municipal Center Improvements.
A brief recap of the Phase 1 improvements includes relocating the first floor front counter from
an isolated position in the back of the building to the current location of the Aldermen's
Conference Room adjacent to the main entry doors. The Aldermen's Conference Room would
be relocated to an interior location within the Administration/Finance section of the building.
The total estimated cost for Phase I improvements including furniture is estimated between
$117,692 and $141,970.
The project schedule is as follows:
• Monday, November 2"d, authorization to public bid project
• Tuesday, November 3rd, Documents out to Bid
• Thursday, November 5th Pre -Bid Meeting
• . Thursday, November 19th Bid Opening
• Monday, November 30th, Recommendation from FGM
• Monday, December 71h, Bid Award Recommendation to City Council
Attached is a set of bid drawings for the project. Due to the volume of the specifications, the
City Council is asked to contact Bill Hobson if they would like to schedule an opportunity to
review the construction plans and bid specifications for the project.
If City Council concurs, then Staff is seeking a motion to advertise for bids for Phase I
Construction of the Municipal Center Improvements as presented.
The City of McHenry is dedicated to providing its citizens, businesses, and visitors with the highest qua/ity of programs and
services in acustomer-oriented, efficient, and fiscally responsible manner.
Ev
vm
d
an
a_
°e R
n�=
r
�
o!m
i ] 1 ] a 15 6 1) B 1s 1Is Ii 12 13 14 15 Is 11 1fe 11s a 21 m 0 24
ABBREVIATIONS G101 GENERAL NOTES
JA
'xl
[[NO
II
na s.v nu
r u
w
HE 11
rap
rsr Tw
GENERAL ARCHITECTURAL NOTES
D. DINENSbNING
GENERAL NOTES
.!»oxa,w:»� TxTRTDD w�u.R
DETH APPOTIVIEWIN
woIXaFDPw
at NININD.
Sheet Will
cn
MTI
IURer,eas w.+rvuTxw
P
OF DRAGNINERS
C
O
r
[[,TE+NE
n,v,+:RsnxO
:owo xxueEx
u
CLEAR
wz
E,Yuvx mw,
x:a
ucvrw
Eclwupe
xU
.w
xwuT
Mnr,nunq
DOa.
It
RAN
eAVatuz'c
p:w
ITT - u O e..e IN Iu wEux„uuxExnur
pm
vrswuaesnx -wExv rvunEcrxomc[xTESTAxcrcerxsc. mcOvrouva TxvrnR[xn
BbOF
onEwawu.rmruv.xE mpE:lvTCRMBEwElx.uTsoq rn Tr«evnlnmExwTo.Eer
A».r:pn m,w:x nv narn T»Iws nrew w:a„R.eFRmnxTM np.,+rvry e,
NONE
THICOR w paCxrovou:vxtxc
PHENOMENON .ONINTrWEEI
w
.
xwrq pw!
uwa .lwM:RT,rzor rnsn+u[rwm[uTau.
-
'
Z
a
NO
o
m
s
G
INDUOFDPAWIKS-ARCHnR OSEPl6
RMR1 NunErt
_
Nm::
sArn
I.o Tn
.wTw Em Em.oewnvl x
-
-
on wu:x rxn+ORvn:R.m:.e R.nww s T :rR
ps
uecrpw+.wa
OF c
o-N of uu. Te v
INDIX PAISERIEs
JUD
AD at
EF
It oM1
o
\
bar
sheet NI
vs, uE4orn[uvore'R.uuuo[vwn oµcV9 nntr,.� ru mHne
Rut M
YV\\ WERUtlth
veww
�
c, EwEI
GTHWxr
OWN VOLUTED ucoAD
cDm
s rsNxaxx
(
;sMnN
IDEAL
i-
513
nroxu.rs
EwnT
U TER
—
ENO
OF
LOW
3C
- y FORTRAN
ry
ENNUI
a MISCELANEOUS ROM
r
w:
vM
wleTwa
CeT
01
FEnu
a»RPDR»D cOnv,nvu.Tw pAsZJOM O:. r,.
=KPLETE MOTOR FRED WINCR.v PC E
U
EU
,
_xev, ocu
'uwvw
mw:auu:w.mvlrtw.
rtp aONEr[x
GilOTHER
ui..
I TE
GET
ANTAIMAR
mTM
NO
THI
TC,.CWL¢MUtR Raw.mTm
s
HE
FIRELINCE
THEN
+Nrt¢
Gil
tP"mr.lnul TTKur..ulT:n�mR.o0.vravcwlTxms,.
*IN NE
N
CHiw Cr
-
ED
o+w
-
nuxcmgl
E A OUR EVENT
CUP
S.K;PUT-Eal THE ANKENPUT HE
PON
m,p
Tu
m
ufu'w +nrw»v RcxnrcT .eRm
IFIENUCHERS
N
m
HNI
r:mEW...
wWx AONTRIED INHOxDncc.nx nE vwr+Rc scu»w:e
U
K
N+1 rwv:uox>f
u:x
wxi¢w'niq:q
uw
cRNc
o:v:
oU0.mr.
or GA»s-s:
Rsxr.:uq,GafalwTUTrusn%:s,ER
cu TxTcOMFORT
e, :rLRToxwEEW a.'Txf Rn,to:,xEmrv:+os,-E,r�xITCr .
"
FEE
RAE x
OI
PERc
w
GARENT
T
VERNON
TNT
VOODOO!
MIN
ENARNI
Rxm Yaupw
0
B
R
uxamRg
ma-rsE
Aaszwuvuwt ..
RAW
TRUP
»
r
,.xrracx
PREFIX'l1o:u0.t
VAN
yNnYs+u'x.
E
NET
OMAN
WC
eT<ENE
5PARaxne
FORT
ROTTEN,
ow
0
OFF
NET
v
FERRI PI
q NAND
WwEomwNnNwTN..
CA
CONTENDED
EGe,
CUP ENE 1VERNON P Me
um
TnnvTa•t,
oamaslez,µctsswwe[ucvOt
CA DED
EugNGAG
ue AGE xrsu
r
Gal
PRINT
1V
GONE
CA
wri�
HUGE
R��Nt
Do
FOR
AVAtIENINGH
NEI
NIO
ON
EARN RVARTANI
U12 IFL REOVENATERENI HE ��W at THE UPEANTLEGRON
TMANGHTENTHATER. DRAINAGE ANOTHEIRMINI
EXPIRATION DATE
rp,vu nn A Iu:CMrw'.m6
CHINER157HEI TOE
TO
Gral
PATO
GREATER TO
ED
GORKIPOINT
ON
PAPER
Y
susws,uarrxv
I I
Ev
H
ARE
6uw
ury
'
c
DART
.E
+nw1eT
AM
rTxO
Mf calTSKmssxuvErn'uEcapmRzrvlxvwsgran:mTm
zTrzEve,W MEuUcNxtI
,rsO:cxgmm.TTswwmLLnB+Flwo:1cT:wNo'facvR:r1tGw'. kV^wDEµ:csE:'CHWE
m
cuw
ARM
.
rt
rrARE
MHEwu saRcfvMTracras ut x,v Y6Ec¢ucTwfOsxT
nvl:
awcxa,
:m
MOTNcT
ns
VERNON
FE.s
,. TouvsM..gcwo anwxETxtB
s <
E
NmLELWR,Rsm.axurunr
It
NIGER
FaCEETAMONNEAWN
Ma
CORNATOR
HE
PI
It
CPT
CREATE NO
AM
CIMUN
AT
QJARCHTNE
IT
n[
OR
GR40E
ON
WEI
lon
PER
CENTA
OFF
Pit
0
ROPER
qT
Tfio
ANN
us
W
Z
PATw
xpAN
ORCa
ALL`°
IN
Hol
^Al
D![ra;
U
z
OUR
a6TlMTxu:s+
m
M
C1
E
MAN
avnpE
f p
z
WOKEAN
ww
8
z
NO
teval
u
ARE
T
[
-
cE�1D
U
B
AWNTa
Dw,Ra
RNOW
ENHANCED
z
4
HER PONT
CA
III
HONGIo
oUNC; U
e
OFF
xw
EpsE
U
W
TO
Hilw
M
TAGAN
Z GET
GO
iwn.,TT:RIN
W
4
Go
pvlE.kIN
x
U
Not
OFDOOR
Tx
O
m+Tw
VAN
xDUi
a+-E
�
Bqo,
DOW
tic
Ot
m Rl�.ovv
AND
ART
III
ONTEN T
U
UN
RW
6
U
RIC
GRI
12 1 13 14 IS 16 17 18 19 ZD EI ll ll 24
KENNOTS45FUME
NIINBFP
EDECRIPTION
❑EYNO1Es.sEEEi
0
Q
a
m
S
NIMBEP
DESCRIPTION
AM
not vw
uv.tox Hrety.
.wvxs..wiuxtmxtx.x
_
.
-.
l`JPHVELL NEEDLE
gMEA sE
'
vrn _twvutNm
v'cclvvw sxsw
mAx..aevsxsw
'. u.
\ / coFuwcu AEo. aEo�
os:en rt
uFv.rEtnv
Fv /
pivu
AjLo q.N.
_
uj
-- t
F—
_
I
GENERAL DEMO NOTES
�)
O
'Ok"`
ili
I
Enwrs to6A6�s
kERIFU
III
ru
w x w d etrt�
o
-
9FIANMRO"ERt,
u
wa to
xu.rvx.w [ m tw r swr
o
�)
�>
tut M901A Aus
,
--
I �FERRJDL
w9rx
1 I
��
/
kccA.. s
O
1
rl�LVALV
•w)
V GG
PAU_J
-
11m LA
r nrx-nr Mr TLEPI L__ -
.•
a<
wuv
v�11
I 1
msAvun
_
.c4w.t uc trva
1 i
t e ua.c ALL veu9uviv nxa A r
Ko
—
I
REJDnvnuESw HELD
�
nrtwiMnwuPia-r
.
HERA
EDEN=
utr_
CMS wv.nvut NA..uts
©
1
PkoFMSCNkI
__ _____
vni:tov'
a wrmrrrvwmrtxrw xnu;
}
-_
1'1
JI
c
1
1
tl
a I I
Fawvsrv.cEroA
I
Asury
W
_
HE
wxAus
MECIAO t arewxr
swoc.s.sn
mA
—
wmcx A.n
Ara..snvvnmx.uwcrt.
=�1
I I I I
wcArnm woeeucAc.l'z
vw ornxswxcAx.
II II
r_
^\\\N
11 II
asuwn MR REIME
1 I I I
1
rn .wvr DEAD HEAR
W
W
U
m
tw wn.ni
r m o
Dal
=ot=
U EVEi
z
'P
O_
Z
W
2
O
LEDA
Am[ctwv PmvcmAnwl.tsuoAwl.vetwv. cuAOcnrzrs ¢ouw6vn
AuwFn_us KcrFv[wixEeAforopnwoA<u...FAtvrAsnae.cw[u
wwn.ly
QP OFMRK
C
ttewr..x excc
L
utsuPart s6t.PxoGrk[6seaux rrto nvP.au mAaw t[vw9ucr ruuEOA Aimv-F.nxsoxtr[o
....... ....,
O
murmm.zxrwrH.r w,A..
E
e
Arm
l Im,
p
fm
DID
u
FIRST FLOOR- DEMOLITION REFLECTED CEILING PLAN
A11
FIRST FLOOR -DEMOLITION
PLAN
A21 FIRST FLOOR- KEY PLAN
Al
13 1 14 1 I6 1 16
17 f9
19 bl
21 II 23 Id
1
i d 5 6 i
9
9 16
11
12 1
I <
P
1.
PB-1 rHrcnnvnnHac
W
E
-
i
ART
10
g
ewowrxVANTx
� 6 nx�nnanw :NNAT DATE
—J
AT. �meKe III
.0 >e,i,ai in [ir^
DF aJ/ EARNED,�
QL� TAINT
STREET To
£ �1 Wk.
�...
TT c 4
SE Al FINISH FLOOR PLAN
] 4
I
ASTECTALOCIME
NET THESK
All ED
TEST
R.AT
o .
x,Mxs,,.aa.s
OR LAW
WAR
MATND
WE
likkadid
AT
ae�
PARTITION TYPE
I w••
ra
Ad ETTkIk
di
ok
..��a,anar.nr�
7AKAx�r�
ADA
AUR ,am
S ��. �AI �
�-RAD
Pill
NT
�.NKENr
.anAN
�
P42 r� AKii
Irz =rm
0
W-i
U.sRe rr2 srxoc[rvxx.cLtLa6EauixEa
A8 REFLECTED CEILING
a I to I II I tx
so6Prrwrtx
uEn
Ia a 1 Ix 1 v 1 19 1 Is I x 1 21
RENAW
ufC!
PT-1: PITTSBURGH PAINT- GRAY BEIGE 416.3
PT-2: SW6486-REFLECTING POOL
PT-3: SW7505-MANOR HOUSE
RB-1: JOHNSONITE-167-A-FUDGE4"
WILSONART • 5TH AVE. ELM - 7966K-12 (VERTICAL)
PL-2: WILSONART-ASTROSTRANDZ-4940K-18(HORIZONTAL)
CTP • 1: PATCRAFT -10361-COLOR POP
00770-000 WOP POP
(INSTALL RANDOM)
S5F-1: SOLIDSURFACE-TEiD
_ _ I
ADS
Milk Rd
ANDTAF TERMS
IT
= tt
ETTA
ITT
idid Aid xsx
EMNI
N TE m nn y
11 21
A14
i)
M21
A21
x ,x
x
x1 ]4
MEDH.EK All
o as
Cl
Ad
ADOZPTSEE
DE
ITT
ARE
did
ITT
(� o
EARMATIT
Lu
,,.,, FRI
k
Uo
COILING SHUTTER ELEVATIONS �/ 8
e•]x• AdcENEvu Paou nxsxscx6nul.6xores "
n I v
Z
w
U �
Z
S
U U v d
�0=m
'o=
Z
AID
w
a
x
U
p
Ad
us
a
IRA
IRA
W
Ed
A1.1.0
LEE
WEEK PATTRIAN] MPH 47Q Far
R ALL FEW PALLIxm wrzx m- t J J a-
FUESIL
PELLETAL
a xsxwwfir,.:
Y
OF
TOPPED „� .�
CAH
mcrc, I PSTNST
AT- L u` } v, x[awc yr[owSnv„'[ rsxrau
N1 RECEPTION DESK -EAST ELEVATION N6 KITCuou eni ETU CE MIATEnLE
m•. N
ORNPUT
FIRRIPPo TWEET
PET
HEEL IT ED PC
RRIM
N ENOIx.cro.�Nrou ExE:r.A�: R 0 0 vQ
EDIPTED
K1 RECEPTION DESK -SOUTH ELEVATION K6 RECE
RG
SELF
PTA
--- IBz
IT
IT
® ECFuw
bRom -PER
PRI
Mmpm
Fj�wwxwo-
9 E
" „ExE.Eo
I
y —4E
DE STAN DE SI ¢.p —
IL4
AM
UP LiDIFt
am SEE RNMR)EK O&S
X PER EATERS
pYa ¢v¢,.et�Dt�MeE TIED K •eArw Ex
A u,sx®u r+.s,+„rwor,E,rwx. O'sor'uEa
SATED IN LEE
VI
EJ aPE PLC x xivWio BE IN A-M DEPOSIT
PITH_uuwo OECD
,GElNrw9 o:noeEc¢uoEocawvrFv wp.x.woo�tUN�Eowln:wm[x
r =` Al ELECTRICAL FLOOR PLAN A7 VERT
-u e s 7
E12
SB-1 W 1
I.EU �I:fUKMU
6 1 6 2 u r B-g
IF
KEEP
r
IN
N16 CASEWORK DETAILS LISP sin
OC
ION K16
E76 BASE CABINET SECTION
ea2�N WALL CABINET SECTION pig BASE CABINET SECTION
KEYNOTES-REFEBIENCE
DESCRIPTION _.ED
xuNasN
GENERAL CASEWORK NOTES of
HE PLC- PROPER 14AOE PRIOR 10 0 FLA. A BILE
TO MCHARkESECTEMB PMPO PROBE
Noore,x E,r`o�o,r�o„E.ro>s ipoE"RE
— Errl„al�
coo...SEE,omwE s Ew,E o a
.na COLD
I o c-
IV WELL IVW UAAET
IS SJ4K8FEECMKET
_ ,cxr:RED .Nxowwcw,w.s.orsr�N,c -
4
owox�.r.u.. r.,.. ,.
>_ �Nsu0.MRSE-r,.¢E6�+Ewc.saux Z
w
a x. acw,RaF U m
4SEEE21 ELECTRICAL LEGEND g zw BOU8o
u u c
z�L) a
�os= Bot
i
�0 4
LOT u
Ua,:DO
Q
ZOPPw
AREAOFWORR w
= w
U
W
df
7 � ZD..Z
R Q
US
a
_ r.. i
USA
_ [[,x-
A5.1.0
1115
A21 FIRST FLOOR - KEY PLAN
M I r v v
] 5 16 14
15 1 16
/ /
wmuv��
n n.9Vu ,[xxvwn
cad wsu'
I
/
ANPIAN
,eau w'�xxr[u ww,unrwmm�
uo , imamemmunErumwEx,ov,
/
rw
5
did
vs
rw.wiuwmwn
/
vaEwrnn,�
§
..
/ ,
Ang
— /
�Qm
Ad
NIT
�---_
m mrtExsmmoa
xvwwuuwuu u,"
u
v,w EYILVC.3411 fn ......
0
�.
w'� ,rt
, /
4
�,"m,,"
PATCH mmM .in
wTOWMITx,m,lnro�w,
/
jomn
in
~
w wx� r,ou w
m
AM Ain IN
�i
N15w
COILING DOOR DETAIL SILL
N1m9 COILING DOOR JAMB DETAIL
Bin
r
�¢xcroswm
vTo
"'"
------------
E�,umvw,m exuow
.c,v.,w+ ii
o
°
mm'Id
woo. '''
reuu„"umia
0
y -
le,P�v«6EEmr."6wmmEw
I
5,mrt
,�,"r,w,w.<u
Rx"Eaax«FOR m,«n.,r.xv, (n�r4.m>Kw...,.w.
" mw w
"nti
G
RECEPTION COUNTER PERSPECTIVE -FOR REFERENCE ONLY
I.
1+
L1
U=
/
�x�xo
s
-r
,mow.
w ,,.
COILING DOOR DETAIL- SILL
COILING WINDOW JAMB DETAIL
J15
J19
mew
;
nd.mn
_P
mE, w
o� "
m
/
TO
milxm.
11P
_
Etl
IN
xmxEv»�
A
n,craw
unae
ma
\
X
dd+nm
mid: 11
I
"m
mw.,�xm
,Eaw
mto xtmm
'
�o«,mm
j,
mmr��,<
o
l—
®;
Ad
-
ITT
.„
-rqeu
Z
w
u v
wrt.Ea
"�.M xm�w�monw.wo,
m.
8
RECEPTION COUNTER PERSPECTIVE • FOR REFERENCE ONLY
w'm"
fl
? c
E1
mmmlld
9
UuvJ
axmvmu
.m,nmw
avow
�--
umu
Z U �-
w
wuu.iu«
Ain Ann"
on v
.u"wn
VVIVILAInd
vmhx
U NOTwo:couw
oEmwrzxmu'.,
snow
a xx uui:i
Fir",
—
n
wx4x,mu,
•
,wm,x s 4
.
—Inlyry
— — —
=
e _
urorewrtemuv _
Em.>'a
x
U
¢nos
PAPA _
_ _ :7 did
$
Idle
PEAREATOUI
Ad
in
Old, NP
Np
PKI
wwwATINATIM"rt
'I
"rmw�w m
ANNAN=
—
mE�
L did.
EETNI
vrt
- - Yinwn - - L
mm
A5.2.0
;mv mmmllmllmdMoEawm.mEm,
WING WALL DETAIL PLAN
SECTION AT ADA COUNTER
SECTION AT COUNTER SHUTTER
ppp
SECTION AT COUNTER SHUTTER
Al
A10
A15
1 2 J 4
116 11 12 13 14
15 1 15 1 17 1 18 i6
]0 21 ll ]] 24
Department of Public Works
Jon M. Schmitt, Director
1415 Industrial Drive
McHenry, Illinois 60050
Phone: (815) 363-2186
Fax: (815) 363-2214
www.ci.mchenry.il.us
CONSENT AGENDA
DATE: November 2, 2015
T0: Mayor and City Council
FROM: Jon M. Schmitt, Director of Public Works
RE: Fieldstone Lift Station Rehabilitation Project
ATT: HR Green, Inc. bid recommendation and tabulation
BACKGROUND: At the June 15, 2015 City Council meeting, the City Council authorized staff to
publicly bid the Fieldstone Lift Station Rehabilitation Project.
The approved 2015/16 Capital Improvement Program includes $330,000 for the
design/observation engineering and construction of the Fieldstone Lift Station Rehabilitation
Project with funding from Water/Sewer revenues and $100,000 from the Legend Lakes Surety
Bond. City Council had previously approved a Professional Services Agreement with HR Green,
Inc. for design engineering and construction observation in the amount not to exceed
$25,974.00 and pre -purchasing of the submersible pumps and related equipment from Xylem
Water Solutions USA, Inc. in the amount of $81,824.60.
ANALYSIS: The following sealed bids for the Fieldstone Lift Station Rehabilitation Project were
received on October 13, 2015:
• Continental Construction $1281000.00
• Keno & Sons Construction $169,000600
• Patnick Construction $2391000.00
HR Green, Inc. has analyzed and checked the bids for accuracy and recommends rejecting the
bid from Continental Construction of Evanston, Illinois due to not meeting the bid bond
qualifications and awarding the bid to Keno & Sons of Lake Bluff, Illinois in an amount not to
exceed $169,000.00. The engineer's opinion of probable cost (EOPC) was $193,372.00.
RECOMMENDATION: Therefore, if Council concurs, it is recommended to reject the bid from
Continental Construction of Evanston, Illinois and award the bid to Keno &Sons of Lake Bluff,
Illinois for construction of the Fieldstone Lift Station Rehabilitation Project in an amount not to
exceed $169,000.00.
The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest
quality of programs and services in acustomer-oriented, efficient and fiscally responsible manner.
HRGreen
October 27, 2015
Mr. Jon M. Schmitt
Director of Public Works
City of McHenry
1415 Industrial Drive
McHenry, Illinois 60050
RE: Fieldstone Lift Station Rehabilitation —Recommendation of Award
HR Green Job No. 86150164
Dear Mr. Schmitt:
Bids for the above referenced improvement were received on October 13, 2015. We have
analyzed the bids, and verified them for accuracy with the contractors, and have reviewed
the submitted references and find Keno &Sons Construction Company of Lake Bluff,
Illinois, to be the lowest qualified bidder at their bid amount of $169,000.00. The low bid of
$128,000 from Continental Construction Company is recommended to be rejected due to
not meeting the bidding qualifications of a Bid Bond, upon review, it was found that the
bid bond form is listed as a personal guarantee, this is not acceptable by the bid
specification in Section 00200, Article 10, and is therefore considered to be a non-
responsive bid.
There were three (3) submitted bids on this project. The bids ranged from a low bid of
$128,000.00 submitted by Continental Construction Company to a high bid of $239,000.00
submitted by Patnick Construction. The Engineer's Opinion of Probable Construction Cost
for this project was $193,372.00.
At this time, HR Green is recommending the City award the contract to Keno &Sons
Construction Company in the amount of $169,000.00.
A copy of the Bid Tabulation is enclosed herewith. Please call if you have any questions.
Very truly yours,
HR GREEN, INC.
C,�.� J.
Chad Pieper, P.E.
City Engineer
JS/CJP
Enclosure
Cc: Russell Ruzicka—City of McHenry
Hrgmhnas:\O:\86150164\Design\Bid\Itr-101515-RecommendAw ard_Fieldstone Lift.doc
HRt;r�er'�,�ar7�
I i : Xti �.:�IA.�S.177£i E ;'i �: tii.�i-�fLS_�7FS1 fi-ill Erg r fill[].7?R 7�Rf1!"i
HRGreen
BID RESULTS
Project Name: McHenry Fieldstone Lift Station Rehabilitaion Dartmoor
Letting Date/Time: October 13, 2015; 11:00 am
Location: City of McHenry Public Works Building
Company
Bid
Bond
Addendum
1 &2
Bid Amount
Continental Construction
Y
Y
$1287000.00
Keno & Sons Construction
Y
Y
$1697000.00
Patnick Construction
Y
Y
$2397000.00
Engineer Estimate:
$1937372.00
Page 1 of 1
REGULAR MEETING
September 14, 2015
Mayor Low called the regularly scheduled September 14, 2015 meeting of the McHenry City
Council to order at 7:00 PM in the McHenry City Council Chambers, 333 S Green Street,
McHenry, IL 60050 with the following Aldermen in attendance: Santi, Glab, Schaefer, Curry,
Wimmer, Peterson and Condon. Absent: None. Also in attendance were City Administrator
Morefield, Director of Economic Development Martin, Director of Finance Lynch, Director of
Public Works Schmitt, Chief of Police Jones, City Attorney McArdle, Superintendent of
Wastewater Ruzicka, Superintendent of Water Division Palmer and City Clerk Jones.
CITY OF MCHENRY MISSION STATEMENT
Mayor Low read aloud the Mission Statement of the City of McHenry.
PRESENTATION: PROCLAMATION RECOGNIZING MARYA DIXON, MCHENRY LANDMARK
COMMISSION
Mayor Low read aloud a Proclamation recognizing the accomplishments to the
Landmark Commission of Marya Dixon and proclaiming Sunday, September 20, 2015, at Marya
Dixon Day. Landmark Commission Chairman Pat Wirtz accepted the plaque on behalf of Ms.
Dixon.
PROCLAMATION IN SUPPORT OF NATIONAL LAW ENFORCEMENT APPRECIATION DAY,
SATURDAY SEPTEMBER 19 2015
Mayor Low read aloud a Proclamation proclaiming Saturday, September 19, 2015, as
National Law Enforcement Appreciation Day in the City of McHenry, and urged all citizens to
show their support of law enforcement throughout the month of September by participating in
the "Blue Ribbon Campaign." Mayor Low thanked the members of the McHenry Police
Department for their service each day to our community and presented the Proclamation to
Chief of Police John Jones.
PROCLAMATION IN SUPPORT OF NATIONAL MANUFACTURING DAY, FRIDAY, OCTOBER 2,
2015
Mayor Low read aloud a Proclamation designating October 2, 2015 as National
Manufacturing Day in the City of McHenry.
PRESENTATION BY THE MCHENRY AREA CHAMBER OF COMMERCE
Mike Mrachek of the McHenry Area Chamber of Commerce provided the Council with
an outline of the 2015 Fiesta Days event. Mr. Mrachek thanked the City of McHenry and
members of the Police Department for their assistance with event.
LeeAnn Atwood provided Council with information regarding the success of the River
Road Rally and the Craft Show. Ms. Atwood also provided Council with an outline of future
events on the calendar sponsored by the McHenry Area Chamber of Commerce.
Regular Meeting
Page 2
September 14, 2015
Mayor Low thanked Mr. Mrachek and Ms. Atwood for their presentation to Council and
expressed appreciation to the members of the McHenry Area Chamber of Commerce for their
continued mutual participation in community events with the City of McHenry.
PUBLIC INPUT SESSION
Mr. Tony Pintozzi, 3510 Larkin Lane, McHenry, stated he is aware of sprinkler systems
that have after -meters installed on them, which goes on, but does not use the sewer system;
the water goes back into the sprinkler system. He also opined it is unfair for individuals not
utilizing the sewer system to have to pay the increase. Mr. Pintozzi also suggested that
proceeds from the sale of the Central Wastewater Treatment Plant property, be utilized to pay
down the loan, decreasing the burden to the property owners.
Mr. Bill Enberg, 712 Kresswood Drive, McHenry, stated he is retired and finds the 56%
increase to be excessive adding the increase amount needs to be reduced.
Mr. Alan Kay, 710 Kresswood Drive, McHenry, asked why when the City has been aware
of the Central Wastewater Treatment Plant decommissioning for a long time, the rates were
not increased over an extended period of time rather than taxpayers being hit with a large rate
increase all at one time.
Ms. Liz Kinney, 6504 Waterford, McHenry, expressed concern regarding the types of
businesses that appear to be opening in the City of McHenry and asked the Council to consider
opening more family appropriate businesses in McHenry.
Ms. Molly Plautz, 2616 Arbor Drive, McHenry, expressed concern that a gun shop and
shooting range was opening in such close proximity to Landmark School.
Mr. Michael Hassinger, 6007 Homestead, McHenry, informed Council that he has a son
in the first grade in the City of McHenry and he is disappointment that a gun range was
permitted so close to a grammar school.
Mr. Carl Hurtig, 5411 Chasefield, McHenry, stated the situation with the Central
Wastewater Treatment Plant is shameful. The increase in the bill is excessive and a hardship for
people on a fixed income. Mr. Hurtig inquired about who designed the new invoice and why the
rate and usage amounts are no longer indicated on the bill?
Mr. Mike Harding, 6809 Galway, McHenry, stated that having a gun range in such close
proximity to Landmark School is not a good idea and added it is unfortunate McHenry is not
attracting more sustainable businesses.
Mr. Mike Thielsen, 4707 Overland Trail, McHenry, addressed Council. Mr. Thielsen
expressed concerns about the Second Amendment Gunshop opening close to Landmark School.
Mr. Thielsen stated that he has children that attend Landmark School. He opined that a
Regular Meeting
Page 3
September 14, 2015
gunshop should not have been permitted at that location. Also, Mr. Thielsen opined that there
is an overabundance of tattoo parlors in the City of McHenry.
Responding to the individuals speaking at Public Input regarding the Second
Amendment Gunshop, City Attorney McArdle stated that the owner of the business has done
satisfied all requirements to open the business including a public hearing before the Planning
aInd Zoning Commission. At this point the City of McHenry is unable to do anything to halt the
process.
CONSENT AGENDA
A. Mayor's authorization to execute the renewal of Intergovernmental Agreement for Dispatch Services with the Village
of Johnsburg, Village of McCullom Lake, McHenry Township Fire Protection District, Union Fire Protection District,
Marengo Fire Protection District, and Marengo Rescue Squad;
B. Ordinance authorizing the City of McHenry to enter into an Intergovernmental Agreement for police services
pertaining to the formation of a multi -jurisdictional accident investigation team with the Village of Spring Grove,
Village of Johnsburg and City of Woodstock;
C. Ordinance changing the address of the South Wastewater Treatment Plant (222 S. McHenry Avenue) and Salt Storage
Facility (400 S. McHenry Avenue) to 3200 W. Charles Miller Road, McHenry, IL 60050;
D. Request to advertise for bids for installation of holiday lighting in Veterans Memorial Park;
E. Ordinance amending Municipal Code Chapter 4, Sec. 4-6(6), reducing the number of Class G1 liquor licenses in effect
from nine (9) to eight(8);
F. Resolution establishing Nationwide as a 457 Plan Advisor
G. Special Event Liquor License for Church of the Holy Apostles, for October 17, 2015 from 6:00 pm to 11:00 pm;
H. Special Use/Park Picnic Permits; and
I. Approval of List of Bills, in the amount of $887,870.43.
Alderman Peterson requested that Item D on the Consent Agenda be voted on as a
separate item.
Responding to an inquiry from Alderman Peterson, Deputy City Administrator Hobson
stated there have been no extenuating circumstances therefore the holiday lighting project is
being bid on as it has been in the past. Alderman Peterson opined that the decorations would
be appreciated if they were more widespread throughout the City of McHenry, rather than
concentrated in Veterans Memorial Park. Alderman Condon suggested the package could be
broken into separate components in the future.
Motion by Wimmer, seconded by Condon, to approve the Consent Agenda, as
amendedI with Item D being voted on separately.
Voting Aye: Santi, Glab, Curry, Schaefer, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
Motion by Santi, seconded by Schaefer, approving the request to advertise for bids for
installation of holiday lighting in Veterans Memorial Park.
Regular Meeting
Page 4
September 14, 2015
Voting Aye: Santi, Glab, Curry, Schaefer, Wimmer, Condon.
Voting Nay: Peterson.
Absent: None.
Motion carried.
MOTION TO ADOPT AN ORDINANCE AUTHORIZING VARIANCES FORM ARTICLE IV
(RESIDENTIAL DISTRICTS), TABLE 4 (RESIDENTIAL DISTRICT REQUIREMENTS) FOR THE
PROPERTY LOCATED AT 807 OAKWOOD DRIVE, AND AN ORDINANCE AUTHROZING THE
MAYOR'S EXECUTION OF A REVOCABLE DRIVEWAY LICENSE AGREEMENT BETWEEN THE CITY
OF MCHENRY AND JEFFREY JENSEN
City Administrator Morefield informed Council that the applicant is seeking 30-foot
front; 5400t corner side and 16-foot rear yard setback variances from the Zoning Ordinance to
allow a home addition and expansion to an existing attached garage. Additionally, the applicant
is seeking to relocate his driveway from Oakwood Drive to the unimproved right-of-way to the
north due to prevalent drainage issues. Oakwood Drive, at the subject property, is
approximately 780' in elevation and the property slopes to the west toward Boone Creek. At
the rear of the applicant's property the elevation is 774'; whereas the property on the east side
of Oakwood Drive has a driveway elevation of 790'.
Staff has prepared a Revocable License Agreement to facilitate the construction of a
private driveway on public property. City Administrator Morefield noted that a similar
agreement was approved approximately one year ago for the property located at 1711
Lakewood Avenue.
Applicants live adjacent to an unimproved City right-of-way. When the lot was platted,
30400t setbacks were established along the front and corner side yards to the north and east
adjacent to Oakwood Drive. By zoning definition, the applicant's front yard is along the
northern property line adjacent to the unimproved City right-of-way and the corner side yard is
along Oakwood Drive.
Staff believes the proposed home and garage additions will not detract or adversely
impact neighboring properties. The Planning and Zoning Commission unanimously
recommended approval (7-0) of variances from Article IV. Residential Districts, Table 4:
Residential District Requirements, to allow a 30-foot reduction in the required front yard
building setback; 5-foot reduction in the required corner side yard building setback
requirement and a 16-foot reduction in the required rear yard building setback to allow the
expansion of an existing home, including a 30' x 30' attached garage in substantial conformance
with the site plan submitted as part of the Public Hearing application and with the following
conditions:
• A formal wetland delineation be completed and further soil analyses if determined to be
necessary, prior to the issuance of a building permit,
• Wetland and soil analyses should also include the adjacent City right-of-way where the
driveway relocation is proposed;
Regular Meeting
Page 5
September 14, 2015
• Applicant shall fully remove and restore existing driveway if and when a new driveway is
constructed to the north, including curb and/or sidewalk replacement and restoration in
the City right-of-way on Oakwood Drive, as well as any repair and/or replacement of
sidewalk and curb, and restoration along Oakwood Drive resulting from the installation
of a new driveway to the north.
Alderman Glab suggested that at some point in the future Staff should look into vacating
the right-of-way.
Motion by Wimmer, second by Curry, approving the Ordinance authorizing variances from
Article IV (Resident Districts), Table 4 (Resident District Requirements) for the property located
at 807 Oakwood Drive, and an Ordinance authorizing the Mayor's execution of a Revocable
Driveway License Agreement between the City of McHenry and Jeffrey Jensen, including the
variances, with the conditions recommended by the Planning and Zoning Commission.
Voting Aye: Santi, Glab, Curry, Schaefer, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
MOTION TO ADOPT AN ORDINANCE WAIVING SECTIONS 4.3 (A) AND (B) OF THE SUBDIVISION
CONTROL ORDINANCE PERMITTING SIMULTANEOUS APPROVAL OF PRELIMINARY AND FINAL
PLAT OF SUBDIVISION FOR THE FIRST AMENDED PLAT TO PARK VIEW PLAZA AND APPROVING
THE FINAL PLAT OF SUBDIVISION FIRST AMENDED PLAT TO PARK VIEW PLAZA
City Administrator Morefield reiterated to Council that on April 4, 2001, an Ordinance
granting a Zoning Map Amendment to C-5 Highway Commercial District, a Conditional Use
Permit to allow a drive-thru banking facility and a variance to the required number of parking
spaces for the McHenry Savings Bank (Lot 17) was approved. Subsequently, the Final Plat for
Park View Plaza Subdivision was approved by Council on May 30, 2001.
The Park View Plaza Subdivision encompasses approximately 14-acres and currently
includes the McHenry Savings Bank; McDonald's; and Park View Plaza Retail Center.
When the Plat was approved in 2001, the Plat included some restrictions that encumbered on
the land included on the Plat. The applicant is requesting an amendment to the Subdivision Plat
approved in 2001 to remove Restriction No. 2 to permit a right-in/right-out access only from
Illinois Route 31 between Lots 17-19.
Staff has been working with the applicant to facilitate the construction of a right-
in/right-out ingress and egress immediately north of McHenry Savings Bank. Due to the
aforementioned restrictions the only way to do this is to amend the approved Final Plat and
remove the restriction, which requires approval by all current property and lien holders within
the subdivision. Currently there are four: McHenry Savings Bank; MEI Properties (developer and
Regular Meeting
Page 6
September 14, 2015
owner/manager of Parkview Plaza Retail Center); Lien holder for Parkview Plaza Retail Center;
and McDonald's Corporation.
Additionally, since the right-in/right-out will be constructed along Cl state route, Cr
Illinois Department of Transportation (IDOT) has to approve the Amended Plat, as well as the
plans for a right turn deceleration lane, as well as the proposed ingress/egress. Also, the
McHenry County Highway Division would need to sign -off on the proposed roadway
improvement.
The Final Plat of Subdivision First Amended Plat to Park View Plaza has not substantively
changed from the original Park View Plaza Final Plat, with the exception of the following:
• All four owners and lien holders have been added as owners and mortgagee(s);
respectively, and will need to sign and approve the Amended Plat, which will be
recorded;
• All the notes and restrictions previously listed have been removed; Staff is
recommending only the following restriction be removed: "No direct access from
Lots 17-36 to Illinois Route 31 will be permitted." However, the other five notes
and restrictions listed on the Original Plat of Subdivision should remain and be
included on the Amended Plat;
• The right-of-way for the proposed deceleration lane and right-in/right-out is
depicted but needs to state "hereby dedicated;" and
• The McHenry Plan Commission Certificate on page two of the proposed Plat
needs to be amended to state the City of McHenry Planning and Zoning
Commission.
Staff supports the proposed removal of the aforementioned restriction to allow aright-
in/right-out, in conjunction with a deceleration lane, immediately north of the McHenry Savings
Bank. City Administrator Morefield noted that the engineering construction plans for the
proposed roadway improvement are currently being reviewed by McHenry County Highway
Division and IDOT. The Planning and Zoning Commission unanimously recommended approval
(7-0) of the Final Plat of Subdivision First Amended Plat to Park View Plaza and waiver of
provisions (A and B) required for simultaneous approval of a preliminary and final plat with the
following conditions:
• Applicant complies with any comments by the City Engineer, as they relate to the
Amended Plat of Subdivision;
• No additional access points to/from Illinois Route 31 between Bank Drive and
Park Place, other than the proposed right-in/right-out immediately north of
McHenry Savings Bank, be permitted;
• Plat is recorded within six months of City Council approval by Ordinance; and
• Any existing private covenants and/or agreements developed and previously
agreed to by the applicant and other property and lien holders and are currently
recorded remain in place unless they impact the construction of right-in/right-
out and accompanying deceleration lane north of McHenry Savings Bank to/from
Illinois Route 31.
Regular Meeting
Page 7
September 14, 2015
Motion by Santi, second by Curry, approving the Ordinance Waiving Enforcement of
Provisions for Simultaneous Approval of a Preliminary and Final Plat of Subdivision and
Approval of the Final Plat of Subdivision for the First Amended Plat to Park View Plaza in the
City of McHenry, McHenry County, Illinois with the following conditions, as recommended by
the Planning and Zoning Commission and the recommendations by Staff:
• Applicant complies with any comments by the City Engineer, as they relate to the
Amended Plat of Subdivision;
• No additional access points to/from Illinois Route 31 between Bank Drive and
Park Place, other than the proposed right-in/right-out immediately north of
McHenry Savings Bank, be permitted;
• Plat is recorded within six months of City Council approval by Ordinance; and
• Any existing private covenants and/or agreements developed and previously
agreed to by the applicant and other property and lien holders and are currently
recorded remain in place unless they impact the construction of right-in/right-
out and accompanying deceleration lane north of McHenry Savings Bank to/from
Illinois Route 31.
And,
• All notes and restrictions previously listed on the Original Plat but have been
removed be included on the Amended Plat, with the exception of the following:
"No direct access from Lots 17-36 to Illinois Route 31 will be permitted."
• A memorandum for recording be recorded simultaneously with the recordation
of the Final Plat of Subdivision First Amended Plat to Park View Plaza to state the
changes between the originally approved Final Plat of Subdivision for Park View
Plaza and the aforementioned Amended Plat.
Voting Aye: Santi, Glab, Schaefer, Curry, Wimmer, Peterson.
Voting Nay. None.
Abstain: Condon
Absent: None.
Motion carried.
MOTION TO APPROVE A PROFESSIONAL SERVICES AGREEMENT WITH HR GREEN, INC, IN THE
LUMP SUM AMOUNT OF $1690200 FOR PHASE I AND II ENGINEERING FOR THE PEARL
STREET/LINCOLN ROAD IMPROVEMENT PROJECT AND THE ADOPTION OF AN MOT
RESOLUTION FOR IMPROVEMENT BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
City Administrator Morefield reiterated to Council that at the August 4, 2014 City
Council meeting, the Council authorized Staff to submit Pearl Street/Lincoln Road
Improvements between Route 31 and Chapel Hill Road for federal funding through the Surface
Transportation Program (STP), as distributed by the McHenry County Council of Mayors.
The improvements would include:
• intersection capacity improvements, if warranted
• an off-street bicycle path between the Fox River and Chapel Hill Road on Lincoln Road;
Regular Meeting
Page 8
September 14, 2015
• sidewalk improvements to conform to the latest accessibility guidelines;
• curb and gutter replacement;
• bridge deck rehabilitation; and
• HMA pavement removal and replacement with binder and surface courses.
The McHenry County Council of Mayors placed the Pearl Street/Lincoln Road
Improvements project on their Multi -Year B (MYB) list for $1,500,000 of STP funds. This project
is next on the list of MYB projects for construction funding as STP funds become available in
2017, 2018 or 2019. STP funding will pay for up to 80% of the total cost of construction and
Phase III engineering with a local match requirement of 20%. The City is responsible for 100% of
the cost of Phase I and II Engineering.
City Administrator Morefield informed Council that the Capital Improvement Program
includes $175,000 for Phase I and II Engineering for the Pearl Street/Lincoln Road
Improvements funded by Motor Fuel Tax (MFT) revenues. HR Green has submitted an
Engineering Services Agreement using IDOT's required standard form for the lump sum amount
of $169,2000
Professional services provided in the Agreement include preparation of contract bid
plans, specifications, cost estimates and all other related work necessary for an IDOT state
letting in Springfield, Illinois. HR Green would also include in the contract bid plans extending
approximately thirty-five sanitary sewer stubs from the sanitary sewer main under the Lincoln
Road pavement to the homeowner's property line. City Staff and the City Attorney are
investigating options to recapture the cost of the sanitary sewer stub installations through
future annexation agreements, adoption of requiring payment upon connection or creation of a
Special Service Area (SSA) assessment.
Responding to Alderman Curry's inquiry as to whether other engineering firms were
consulted regarding how much they would charge for a similar project, City Administrator
Morefield stated that no other firms were consulted.
Motion by Schaefer, second by Wimmer, approving the Preliminary Engineering Services
Agreement for Motor Fuel Tax (MFT) Funds with HR Green, Inc., in a lump sum amount of
$169,200 for the Pearl Street/Lincoln Road Improvement Phase I and II Engineering and the
IDOT Resolution for Improvement by Municipality under Illinois Highway Code for Pearl
Street/Lincoln Road Improvement Phase I & II Engineering.
Voting Ave: Santi, Schaefer, Wimmer, Peterson, Condon.
Voting Nay: Glab, Curry.
Absent: None.
Motion carried.
MOTION TO APPROVE
A PROFESSIONAL SERVICES AGREEMENT WITH
HR GREEN, INC.,
IN THE
LUM SUM AMOUNT
OF $65,278.75 FOR PHASE II ENGINEERING
FOR THE BULL
VALLEY
Regular Meeting
Page 9
September 14, 2015
ROAD/CURRAN ROAD INTERSECTION IMPROVEMENTS PROJECT AND THE ADOPTION OF AN
IDOT RESOLUTION FOR IMPROVEMENT BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY
CODE
City Administrator Morefield reiterated to Council that at the January 6, 2014 meeting,
the Council authorized a Professional Services Agreement with HR Green for Phase I
Engineering of the Bull Valley Road Improvements. IDOT required the intersection of Curran
Road and Bull Valley Road be evaluated for a possible roundabout design as part of Phase I
Engineering. The McHenry County Council of Mayors awarded up to $749,346 of STP funds for
Bull Valley Road Improvements. STP funding will pay for up to 80% of the total cost of
construction and Phase III Engineering, with a local match requirement of 20%. The City is
responsible for 100% of the cost of Phase I and II Engineering. The Capital Improvement
Program (CIP) includes $6,000 for Phase II Engineering for Bull Valley Road Improvements
funded by MFT revenues.
City Administrator Morefield explained that there were three main alternatives
discussed during the development of improvements at the intersection; cost, right-of-way, and
future developments. Due to the cost for additional right-of-way and the effects on future
development of constructing a roundabout at the intersection of Bull Valley Road and
Curran Road, Staff and the City Engineer recommend proceeding with a signalized
intersection.
The CIP includes $66,000 for Phase I Engineering for the Bull Valley Road Improvements
funded by MFT revenues. HR Green has submitted an Engineering Services Agreement using the
IDOT required standard form for the lump sum amount of $65,278.75. Professional services
provided in the Agreement include preparation of contract bid plans, specifications, cost
estimates and all other related work necessary for an IDOT state letting in Springfield, Illinois. It
is estimated that the contract documents will be prepared to meet a Marcy 2016 IDOT letting.
Motion by Condon, second by Wimmer, approving the Preliminary Engineering Services
Agreement for Motor Fuel Tax Funds with HR Green, Inc., in a lump sum amount %J $65,278.75,
for Phase II Engineering and the IDOT Resolution for Improvement by Municipality under Illinois
Highway Code for Bull Valley Road Improvement Phase II Engineering.
Voting Aye: Santi, Schaefer, Wimmer, Peterson, Condon.
Voting Nay: Glab, Curry.
Absent: None.
Motion carried.
MOTION TO ADOPT AN ORDINANCE AMENDING VARIOUS SECTIONS OF CHAPTER 26 OF THE
MCHENRY MUNICIPAL CODE RELATING TO WATER AND SEWER RATES AND DEBT SERVICES
CHARGES
City Administrator Morefield reiterated to Council that at the June 1, 2015 meeting, the
Council continued a discussion from the May 11, 2015 Council meeting regarding the
adjustment of water and sewer rates to fund existing operating and maintenance costs and to
Regular Meeting
Page 10
September 14, 2015
fund future capital improvements to the system. The adjustments are required to ensure that
appropriate revenues are derived to operate, maintain and improve the existing water and
sewer systems but, in terms of the sewer rate adjustments, as a condition of eligibility for an
IEPA Water Pollution Control Loan, to be used to fund the decommissioning of the Central
Wastewater Treatment Plant (CWWTP) and its consolidation with the South Wastewater
Treatment Plant (SWWTP).
At this time, prior to the completion of the IEPA review of the Notice of Intent to Accept
and Williams Brothers Constriction, Inc. documents (estimated at September 20, 2015), the City
is required to adopt water and sewer rates and a debt service mechanism for the IEPA Loan.
Staff is proposing, for Council's consideration, is an Ordinance Amending Various
Sections of Chapter 26 of the McHenry Municipal Code relating to Water and Sewer Rates and
Debt Service Charges. The proposed Ordinance seeks to update and align various sections of
Chapter 26 of the Municipal Code and to identify water and sewer rates, as well as debt service
and other fees, to be paid by users of the City's water and sewer system, both inside and
outside of the City limits, and for metered and non -metered accounts. City Administrator
Morefield noted that the rates included in the proposed Ordinance are the same as those
previously presented to Council, however, the debt service fees for the IEPA Water Pollution
Control Loan have been adjusted lower to account for a loan amount of $33,600,000, as distinct
from the $35,000,000 loan request approved on June 1, 2015. City Administrator Morefield
summarized the proposed Ordinance.
City Administration would analyze water and sewer rates annually to ensure they are
appropriate to continue to fund operating, maintenance and capital improvement costs. City
Administration will develop an informational letter to be mailed to users of the water and
sewer system identifying and explaining the need for the water and sewer rate increases and
the new fixed debt service charge. The letter will be mailed out prior to the end of September,
providing users with a four month notice prior to the implementation of the new rates.
City Administrator Morefield informed Council that upon adoption of the new rates and
fixed debt service fee per the proposed Ordinance, and upon approval of the Notice of Intent to
Accept bid and bid documents by the IEPA, the construction contract with Williams Brothers
Construction and the IEPA Loan Documents will be executed and the
decommissioning/consolidation project can begin.
Mayor Low acknowledged the difficulty of rate increases in a poor economy and stated
that she recognizes that Staff and members of the Council have agonized over the decision.
Motion by Wimmer, second by Condon, adopting an Ordinance Amending Various
Sections of Chapter 26 of the McHenry Municipal Code relating to Water and Sewer Rates and
Debt Service Charges, as presented.
Voting Aye: Santi, Glab, Schaefer, Curry, Wimmer, Peterson, Condon.
Regular Meeting
Page 11
September 14, 2015
Voting Nay. None.
Absent: None.
Motion carried.
MAYOR'S STATEMENT AND REPORT
Mayor Low announced with sadness the sudden passing of County Sheriff's Department
Deputy Dwight Maness. Mayor Low noted she had spoken with him recently and he had been
looking forward to coming back to work. Mayor Low requested a moment of silence in
remembrance.
COMMITTEE REPORTS
Chairman Alderman Condon, of the Community Development Committee, informed
Council that a Community Development Committee meeting will be scheduled in the near
future.
Chairman Alderman Schaefer, of the Public Works Committee, informed Council that a
Public Works Committee meeting was held this evening, prior to tonight's meeting. Minutes will
be forthcoming.
STAFF REPORTS
There were no Staff Reports.
FUTURE AGENDA ITEMS
Alderman Glab requested Staff to look into an after -meter reader, pursuant to Mr.
Pintozzi's suggestion during Public Input.
Alderman Curry opined he is in favor of Mr. Pintozzi's suggestion that funds from the
sale of the Central Wastewater Treatment Plant property be utilized to pay down the debt of
the decommissioning/consolidation.
Responding to Alderman Curry's inquiry regarding the absence of details regarding
usage on the Water/Sewer bills provided to users, City Administrator Morefield informed
Council that the lack of detail is an oversight that occurred when the bills were printed by a new
vendor. Staff is working with the company that issues the bills to get the rate information back
on the bills moving forward.
EXECUTIVE SESSION
Motion by Wimmer, seconded by Santi, to adjourn to Executive Session to discuss Annual Review Review of Executive Session Minutes and to approve and/or release Executive Session
Minutes and the destruction of Executive Session audio tapes that exist for meetings for which
minutes have been approved and at least eighteen months have elapsed since the date of the
meeting, pursuant to the Illinois Open Meeting Act at 8:42 pm.
Regular Meeting
Page 12
September 14, 2015
Voting Aye:
Voting Nay:
Absent:
Motion carried.
anti, Glab, Schaefer, Curry, Wimmer, Peterson, Condon.
None.
None.
Motion by Wimmer, seconded by Curry, to return to Open Session at 8:49 pm.
Voting Aye: Santi, Glab, Schaefer, Curry, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
Council returned to Open Session at 8:49 pm.
RESOLUTION AUTHORIZING THE APPROVAL AND/OR RELEASE OF EXECUTIVE SESSION
MINUTES AND THE DESTRUCTION OF EXECUTIVE SESSION AUDIO TAPES THAT EXIST FOR
WHICH MINUTES HAVE BEEN APPROVED AND AT LEAST 18 MONTHS HAVE ELAPSED SINCE
THE DATE OF THE MEETING, PURSUANT TO THE ILLINOIS OPEN MEETING ACT
Motion by Wimmer, seconded by Peterson, approving the Resolution regarding the
release of Executive Session Minutes and the destruction of Executive Session audio tapes that
exist for meetings for which minutes have been approved and at least eighteen months have
elapsed since the date of the meeting, pursuant to the Illinois Open Meeting Act.
Voting Aye: Santi, Glab, Schaefer, Curry, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
ADJOURNMENT
Motion by Wimmer, seconded by Curry, to adjourn the meeting at 8:50 pm.
Voting Aye: Santi, Glab, Schaefer, Curry, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
The meeting was adjourned at 8:50 pm.
Mayor
City Clerk
REGULAR MEETING
September 21, 2015
Mayor Low called the regularly scheduled September 21, 2015 meeting of the McHenry City
Council to order at 7:00 PM in the McHenry City Council Chambers, 333 S Green Street,
McHenry, IL 60050 with the following Aldermen in attendance: Santi, Glab, Schaefer, Curry,
Wimmer, Peterson and Condon. Absent: None. Also in attendance were City Administrator
Morefield, Deputy City Administrator Hobson, Director of Economic Development Martin,
Director of Finance Lynch, Director of Public Works Schmitt, Chief of Police Jones, City Attorney
Schlossberg and City Clerk Jones.
CITY OF MCHENRY MISSION STATEMENT
Mayor Low read aloud the Mission Statement of the City of McHenry.
PUBLIC INPUT SESSIO
No one spoke at Public Input.
CONSENT AGENDA
A. Purchase of two (2) police vehicles (2015 Chevrolet Tahoe) from Miles Chevrolet for $67,160; purchase and
installation of emergency vehicle equipment from Ultrastrobe, Inc. for $17,975.81; purchase and installation of police
decals from Eby Graphics for $1,735; purchase of two (2) Panasonic Touchpad Squad Computers from CDs Office
Technologies for $5,272; and purchase of two (2) Panasonic Squad Car Camera Systems from CDs Office Technologies
for $11,418, for a total amount not to exceed $103,750;
B. Final Pay Request for Riverwalk Phase 2A.1 and 2A.2 Construction to Landmark Construction, Inc., for the amount of
$10,149;
C. Use of Veterans Memorial Park, temporary advertising signs, and waiver of all associated fees for the Downtown
Business Association Annual Christmas Walk on November 21 and 22, 2015; and, temporary closure of Main Street,
Green Street, Riverside Drive, Broad Street, Park Street, and Court Street on November 22, 2015 for the annual Toys
for Tots Parade; and
D. August 17, 2015 Council meeting minutes and September 8, 2015 Special Council meeting minutes;
E. As Needed Checks, in the amount of $93,598.36; and
F. Approval of List of Bills, in the amount of $165,108.34.
Motion by Wimmer, second by Schaefer, approving the Consent Agenda, as presented.
Voting Aye: Santi, Glab, Curry, Schaefer, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
PUBLIC WORKS COMMITTEE RECOMMENDATION: APPROVAL
OF A
RESOLUTION
FOR AN
HONORARY STREET SIGN DESIGNATING THE INTERSECTION OF
KANE
AVENUE AND
CENTER
STREET IN HONOR OF VIRGINIA (JINNY) T. WILLIAMS.
City Administrator Morefield informed the Council that a request for an Honorary Street
Sign for Virginia "Jinny" T. Williams has been submitted by Joseph Doherty and Carol Sweeney.
The sign is proposed at the intersection of Kane Avenue and Center Street. Ms. Williams lived in
Regular Meeting
Page 2
September 21, 2015
the McHenry area her entire We and continued to reside at her childhood home, located at 705
Center Street, until moving to the McHenry Villa.
Ms. Williams's service to the community of McHenry included:
• Being the sole owner of "Family Nursing", the first independent nursing practice in the
state of Illinois.
• She served on the McHenry Hospital Board of Trustees;
• In 1975 she received the "Woman of the Year" award from the Business and
Professional Women's Club and years later she was awarded the Centegra "Community
Leader of the Year" award; and
• She was a member of the Board of Directors for the Comprehensive Health Planning
Agency for McHenry, Kane and Lake Counties.
City Administrator Morefield informed Council that on September 14, 2015, the Public
Works Committee unanimously recommended approval of the designation of the intersection
of Kane Avenue and Center Street as Honorary Virginia (finny) Williams RN Drive.
Mayor Low announced that she knew finny Williams her entire life. She stated that finny
as an amazi wng woman. Alderman Schaefer concurred with Mayor Low, announcing that he
also knew Ms. Williams for his entire life. Alderman Schaefer stated that Jinny was an
incredible, selfless person.
Alderman Condon opined that designation of a street in the City of McHenry in Jinny's
honor is preserving history. She stated that she is amazed by the work that Jinny accomplished
during her lifetime.
Motion by Schaefer, second by Wimmer, approving the Resolution for an Honorary
Street Sign designating the intersection of Kane Avenue and Center Street in honor of Virginia
(Jinny) T. Williams.
Voting Aye: Santi, Glab, Schaefer, Curry, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
NEW EMPLOYEE INTRODUCTIONS: Mayor Low welcomed two new Parks and Recreation staff
members in attendance. Deputy City Administrator Hobson introduce Ms. Nicole Thompson,
Athletic Aquatic Supervisor; and Matt LaPorte, Recreation Center Manager.
MOTION
TO ADOPT
AN ORDINANCE GRANTING
A CONDITIONAL USE PERMIT TO ALLOW A
DRIVE-IN
ESTABLISHMENT
AND OUTDOOR SEATING;
AND VARIANCES FROM THE OFF-STREET
PARKING/LOADING,
LANDSCAPING, SCREENING,
AND REQUIRED SIDE YARD FOR A FENCE IN
Regular Meeting
Page 3
September 21, 2015
CONJUNCTION WITH A DUNKIN' DONUTS RESTAURANT PROPOSED Al THE SOUTHWEST
CORNER OF FRONT STREET AND OAK AVENUE
City Administrator Morefield informed the Council the Applicant currently owns and
operates two Dunkin' Donuts businesses in the city and is proposing to construct a third store
at the southwest corner of Oak Avenue and Front Street. To facilitate the development a
Conditional Use Permit is required to allow a drive-in establishment and outdoor seating and
variances from the Zoning Ordinance including:
• Variance from the off-street parking and loading Ordinance (7 spaces);
• Variance from the landscaping and screen requirements (104eet residential screening
strip along the west lot line and 7 feet foundation base planting requirement along the
front (north) side of the building; and
• Variance from the accessory uses, yards and fences section of the Zoning Ordinance to
allow a refuse enclosure in the required corner side yard.
The Applicant is also seeking a variance from the Municipal Code to allow a six foot solid
wooden fence in the required corner side yard to provide screening from the property
immediately adjacent to the west.
Staff believes the land use is appropriate for the site. There is a commercial center north
of the subject property and an office/commercial building south of the site. The property is
located along a major commercial corridor. Applicant has received a preliminary plan and
profile from IDOT that includes a full access off Front Street and approximate right-of-way
dedication along Front Street, which IDOT may seek in the future. Applicant proposes an
additional full access off Oak Avenue, which is a City of McHenry roadway. Although full access
is proposed off Front Street it should be noted the majority of traffic in the morning peak hours
travels southbound or eastbound and Dunkin' Donuts does most of their business before 12:00
pm.
The Planning and Zoning Commission unanimously recommended approval by a vote of
(7-0) of a Conditional Use Permit to allow a drive-in establishment and outdoor seating, as
presented by the applicant, subject to the following conditions:
• Site is developed in substantial conformance with the attached site and landscape plans
and building elevation;
• Applicant shall contact the Illinois Department of Transportation (IDOT) and submit an
approval letter from IDOT permitting the use of the subject property, as proposed, prior
to a Building Permit being issues;
• All off -site and on -site (access and roadway) improvements to and from Front Street
shall be in accordance with the requirements of IDOT; and
• Applicant shall dedicate right-of-way required for long-term roadway improvements to
Illinois Route 31, dedication shall be made to the City of McHenry free and clear of any
liens and encumbrances and a Plat of Dedication shall be submitted to the City of
McHenry for recordation; the City of McHenry will work with Applicant and IDOT to
determine the amount of right-of-way which may be required.
Regular Meeting
Page 4
September 21, 2015
And;
Approval of variances from the Zoning Ordinance, as presented by the Applicant:
• Seven space variance from the off-street parking and loading requirement;
• Variance from the landscaping and screen requirements (104eet residential screening
strip along the west lot line and 7400t variance from the front foundation base planting
requirement); and
• Variance from the accessory uses, yards and fences section of the Zoning Ordinance to
allow a refuse enclosure in the required corner side yard.
Responding to an inquiry from Alderman Curry regarding the purpose of the additional
304eet of fencing along the south side, Director of Economic Development Martin stated that
the additional fencing is necessary to block the glare of headlights.
Alderman Condon opined that she continues to struggle with the fact that no escape
lane exists. Director of Economic Development Martin informed Council that all parties were
concerned about the lack of an escape lane however, there was also a concern with the
placement of the escape lane and the fact that someone might inadvertently drive the wrong
way through the drive-thru.
Alderman Glab opined that he like the location for a Dunkin' Donuts, although he has
some concerns about the traffic pattern, the lack of an escape lane, and how the exit on Oak
Avenue might affect the residents.
Motion by Schaefer, second by Curry, granting a Conditional Use Permit to allow adrive-
in establishment and outdoor seating; and variances form the off street parking/loading,
landscaping, screening, and required side yard for a fence in conjunction with a Dunkin' Donuts
restaurant proposed at the Southwest corner of Front Street and Oak Avenue, as presented,
together with the conditions of the Planning and Zoning Commission, and extension of the
fencing along the south side of the property approximately 30 feet.
Voting Aye: Santi, Schaefer, Curry, Wimmer, Peterson, Condon.
Voting Nay: Glab.
Absent: None.
Motion carried.
MAYOR'S STATEMENT AND REPORT
Mayor Low introduced Attorney Ruth Schlossberg of Zukowski, Rogers, Flood and
McArdle. Mayor Low thanked Attorney Schlossberg for attending tonight's meeting in Attorney
McArdle's absence.
Regular Meeting
Page 5
September 21, 2015
Mayor Low publicly thanked the community of McHenry for the respect and caring
expressed for the family of Deputy Maness.
Mayor Low commended the McHenry POlice Department for the job they do every day
and thanked the members of the Police Department for their participation in the services for
Deputy Maness. The Mayor acknowledged McHenry Police Officers Brian Aalto and John Adams
for their service on the Honor Guard.
COMMITTEE REPORTS
Alderman Wimmer informed Council that there was a Special Finance and Personnel
Committee meeting prior to tonight's Council meeting and the minutes will be forthcoming.
Alderman Peterson informed Council that there was a Parks and Recreation Committee
meeting prior to tonight's Council meeting and the minutes will be forthcoming.
STAFF REPORTS
There were no Staff Reports.
FUTURE AGENDA ITEMS
Alderman Glab stated that he would like to discuss Second Amendment Sports. Mayor
Low informed Alderman Glab that if he would like to discuss the matter he may request that it
be presented as an Agenda Item.
Alderman Santi stated he would also like to discuss Second Amendment Sports and he
expressed satisfaction with the progress of the McHenry Recreation Center construction
project.
ADJOURNMENT
Motion by Wimmer, seconded by Peterson, to adjourn the meeting at 7.29 pm.
Voting Aye: Santi, Glab, Schaefer, Curry, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
The meeting was adjourned at 7:29 pm.
Mayor
City Clerk
REGULAR MEETING
October 5, 2015
Mayor Low called the regularly scheduled October 5, 2015 meeting of the McHenry City Council
to order at 7:00 PM in the McHenry City Council Chambers, 333 S Green Street, McHenry, IL
60050 with the following Aldermen in attendance: Sancti, Glab, Schaefer, Curry, Wimmer,
Peterson and Condon. Absent: None. Also in attendance were City Administrator Morefield,
Deputy City Administrator Hobson, Director of Economic Development Martin, Director of
Finance Lynch, Director of Public Works Schmitt, Chief of Police Jones, City Attorney McArdle,
City Engineer Pieper and City Clerk Jones.
Mayor Low invited the members of Girl Scout Troop 1614 to lead the City Council in the
Pledge of Allegiance. Mayor Low informed Council that Troop 1614 is currently working on a
Government Badge. She welcomed Troop 1614, commending the Girl Scouts for encouraging
leadership skills and thanked Troop 1614 for their attendance at tonight's meeting.
CITY OF MCHENRY MISSION STATEMENT
Mayor Low read aloud the Mission Statement of the City of McHenry.
PUBLIC INPUT SESSION
No one spoke at Public Input.
CONSENT AGENDA
A. An Ordinance providing for the Supplemental Appropriation for Fiscal Year 2014/2015;
Be Payment of $9,189.15 to Stuckey Construction for change Orders pertaining to construction of the McHenry
Recreation Center;
C. Award of Bid to Temple Display, Ltd., for installation of holiday lighting in Veterans Memorial Park, in the amount of
$16,299.60;
D. Grant a request for a one-year permit extension for the Patriot Estates Subdivision temporary advertising sign;
E. Grant a request for a one-year extension to submit a Final Plat for Brook Estates Subdivision;
F. Request from McHenry High School to stage the October 9thHomecoming Parade in Knox Park parking lot and
temporary closure of certain sections of Green Street and Waukegan Road to accommodate the parade;
G. Block Party Request on Barnwood Trail, October 31, 2015, from 2:00 pm to 11:00 pm; and
H. Approval of List of Bills, in the amount of $165,108.34.
Motion by Wimmer, second by Peterson, approving the Consent Agenda, as presented.
Voting Aye: Santi, Glab, Curry, Schaefer, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
MOTION TO APPROVE THE MAYOR'S EXECUTION OF A PROFESSIONAL SERVICES AGREEMENT
WITH HR GREEN, INC., FOR A LUMP SUM AMOUNT OF $37,989.78 FOR PHASE I AND PHASE II
ENGINEERING AND DIRECT COSTS RELATED TO THE CONSTRUCTION OF THE MUNICIPAL
CENTER BIKE PATH; AND IDOT PRELIMINARY ENGINEERING SERVIES AGREEMENT FOR
MOTOR FUEL TAX FUNDS FOR THE MUNICIPAL CENTER BIKE PATH
Regular Meeting
Page 2
October 5, 2015
City Administrator IVlorefield informed the Council that in early 2014, HR Green, Inc.,
identified and submitted an Illinois Transportation Enhancement Program (ITEP) Grant
requesting on behalf of the City a bike path proposal connecting the existing path on Municipal
Drive and extending it through Knox Park, including a connection to the Recreation Center and
on to Green Street. In April 2014, the City was awarded $358,840 for the construction portion
of the project. Similar to other federally funded projects, the City of McHenry would be
responsible for the costs of Phase I and Phase II engineering services and other direct costs.
Understanding that the McHenry recreation facility was in the planning stages, and it
would be more efficient and cost-effective to coordinate and construct the path as part of the
Recreation Center Project, the City was able to work with IDOT to delay activation of the ITEP
Award until such time as this occurred. The site work for the McHenry Recreation Center
Project is estimated for completion in spring 2016. It is now time to activate the ITEP
Agreement and finalize planning for the Bike Path Project so that it will be constructed in spring
2016 to coincide with completion of the McHenry Recreation Center.
HR Green, Inc. provided a Professional Services Agreement (PSA) outlining the Phase I
and Phase II engineering services for the "Municipal Center Bike Path." The PSA covers all
required contributions from the City of McHenry, as required by the ITEP Grant for the bike
path outside of the site of the Recreation Center, which is under a separate PSA. The PSA for
the Municipal Center Bike Path, for a lump sum amount of $37,989,78, represents 10.6% of the
ITEP Grant amount.
City Administrator Morefield provided Council with a copy of IDOT's Preliminary
Engineering Services Agreement for Motor Fuel Tax (MFT) Funds Agreement. He informed
Council that the ITEP Grant is administered through IDOT and IDOT utilizes the standard MFT
Agreement form for ITEP funded projects. The Agreement identifies the scope of the project,
the amount of engineering costs, and must be approved by the municipality to activate the ITEP
Grant. City Administrator Morefield declared MFT Funds are not being utilized for the project.
The lump sum amount for Phase I, Phase II and direct costs to HR Green, Inc., for the project,
will be paid from the Parks Developer Donation Fund.
Responding to an inquiry from Council regarding any changes to the original plans,
Deputy City Administrator Hobson informed Council that no significant changes have occurred;
however, a small loop was removed.
Responding to Alderman Curry's inquiry regarding whether the amount is a lump sum or
a not to exceed amount, City Engineer Pieper approached the podium and stated the amount is
a not to exceed dollar amount.
Deputy City Administrator Hobson provided Council with a breakdown of the project.
Regular Meeting
Page 3
October 5, 2015
Responding to an inquiry from Alderman Peterson regarding whether the project has
been approved by IDOT, City Engineer Pieper indicated that IDOT is managing the project.
Responding to Alderman Glab's inquiry regarding the total cost of the project, Deputy
City Administrator Hobson stated the cost of the project is bound by the amount of the Grant,
$358,0000
Motion by Schaefer, second by Santi, approving the Professional Services Agreement
with HR Green, Inc., for a lump sum amount of $37,989.78, for Phase I, Phase II and direct costs
related to the construction of the Municipal Center Bike Path; and approving the execution of
the Preliminary Engineering Services Agreement for Motor Fuel Tax Funds for the Municipal
Center Bike Path, as presented.
Voting Aye: Santi, Glab, Schaefer, Curry, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
MAYOR'S STATEMENT AND REPORT
Mayor Low informed Council this past Saturday the McHenry Downtown District held
the "Flavors of Fall Taste Fest" event. The event was successful and well -attended despite the
chilly weather.
Mayor Low informed Council the Jaycee's Haunted House is now open and will remain
open through November 1, 2015.
Mayor Low informed Council that the Haunted Hayride event begins in Petersen Park on
Saturday, October 10, 2015.
Mayor Low informed Council that City Attorney McArdle has asked to address Council
regarding the gun range issue. City Attorney McArdle stated that he felt it was necessary to
clarify certain matters. He informed Council that he wrote a letter dated October 5, 2015,
supplementing a letter written by Attorney Michael Smoron dated September 21, 2015,
regarding the legal position of the City of McHenry with regard to suggestions that are being
made that the City Council consider further action with regard to the gun range Use Variance
granted in 2012. He apologized for not being at the meeting on September 21, 2015, when the
issue was presented.
City Attorney McArdle explained to Council that following the meeting on September
14, 2015, on the way to his car he was stopped by Alderman Glab. At that time, Alderman Glab
said he felt issues existed with regard to the agenda item in 2012 because it did not reference
the Municipal Code amendment relating to the gun range use. Attorney McArdle stated that at
that time he indicated to Alderman Glab that he had no idea what he was talking about, but if
Regular Meeting
Page 4
October 5, 2015
he cared to send him the paperwork to review, he would be happy to do so. That was the end
of the conversation. Attorney McArdle further stated he never heard from Alderman Glab
regarding the matter and never received any follow-up paperwork. City Attorney McArdle read
his letter of October 5, 2015, aloud to the Council. He was insistent that he never told
Alderman Glab there was a "loophole." Attorney McArdle stated that he does not use the word
"loophole;" it is not a word in his normal vocabulary.
City Attorney McArdle added the gun range owners have a right to open their business.
The owners have an enforceable right, given the Ordinance adopted in 2012, granting the Use
Variance. City Attorney McArdle noted that an issue exists that the Ordinance adopted by the
Council in 2012 grants a Use Variance, but does not address the Municipal Code prohibition in
Article 3 against discharging firearms in the City of McHenry. This is known as a scrivener Is error
by the City Clerk's office, and, if necessary, could be corrected clerically. The issue does not
require Council action. City Attorney McArdle pointed out that the motion made on September
24, 2012, by Alderman Santi, was clearly to grant the Use Variance and a Variance from Article
3 of the Municipal Code prohibiting the discharge of firearms. The motion was passed with a
vote by five Aldermen in favor of the motion. The fact that the Ordinance failed to include the
Municipal Code amendment is simply a typographical error. The issue of whether the Agenda
for the September 24, 2012, meeting only references the Use Variance, and not the Municipal
Code amendment, is immaterial because the public was clearly aware that the owner was
requesting permission to operate a business involving a gun range, which is sufficient for an
agenda item to bring the matter to the Council for a vote.
City Attorney McArdle stated that the matter went through Zoning hearings, notice was
provided to the required parties and interested persons, and the time for any objection has
long since passed.
Responding to an inquiry from Council regarding whether Landmark School received
notice regarding the gun range, Director of Economic Development Martin informed Council
that Landmark School is an abutting property, not an adjoining property. Landmark School
would not have received a special notice.
Alderman Santi informed Council that to clarify any misunderstanding, the motion he
made in 2012 was based on information he received in the Agenda packet.
COMMITTEE REPORTS
Chairman Alderman Condon informed Council that a meeting
Development Committee is scheduled for Monday, October 26, 2015,
Alderman Conference Room to address Administrative Adjudication.
STAFF REPORTS
There were no Staff Reports.
of the Community
at 7:00 pm in the
Regular Meeting
Page 5
October 5, 2015
FUTURE AGENDA ITEMS
There were no Future Agenda Items.
EXECUTIVE SESSION
Motion by Wimmer, seconded by Schaefer, to adjourn to Executive Session to discuss
the purchase of real property for the use of the public body at 7:30 pm.
Voting Aye: Santi, Glab, Schaefer, Curry, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
Motion by Wimmer, seconded by Peterson, to return to Open Session at 7:52 pm.
Voting Aye: Santi, Glab, Schaefer, Curry, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
Council returned to Open Session at 7:52 pm.
ADJOURNMENT
Motion by Condon, seconded by Wimmer, to adjourn the meeting at 7.53 pm.
Voting Aye: Santi, Glab, Schaefer, Curry, Wimmer, Peterson, Condon.
Voting Nay: None.
Absent: None.
Motion carried.
The meeting was adjourned at 7:53 pm.
Mayor
City Clerk
McHenry, IL
Vendor Name Account Number Description (Item,
Vendor: AALTO, SARAH M
AALTO, SARAH M 100-46-5110 PARKS & REC PROGRAM
Expense Approval Register
LIST OF BILLS COUNCIL MEETING 11/2/15
Payable Number Post Date Amount
10/15/15 11/02/2015 337.50
Vendor AALTO, SARAH M Total: 337.50
Vendor: ADAMS ENTERPRISES
INC, R A
ADAMS ENTERPRISES INC, RA
100-33-5370
VEHICLE REPAIRS
766915
11/02/2015
68.44
Vendor ADAMS ENTERPRISES INC, R A Total:
68.44
Vendor: ADAMS STEEL SERVICE INC
ADAMS STEEL SERVICE INC
100-33-5370
VEHICLE REPAIRS
328284
11/02/2015
30.98
ADAMS STEEL SERVICE INC
100-33-5370
VEHICLE REPAIRS
328328
11/02/2015
108,75
ADAMS STEELSERVICE INC
100-33-6110
SUPPLIES
OCT15-2
11/02/2015
40.00
Vendor ADAMS STEEL SERVICE INC Total:
179.73
Vendor: ALTERNATE POWER INC
ALTERNATE POWER INC
510-32-5380
REPAIRS
98
11/02/2015
817.71
Vendor ALTERNATE POWER INC Total:
817.71
Vendor: AMELIO, ROBERT
AMELIO, ROBERT
100-47-5110
SOFTBALL UMPIRE FEES
10/5/15-10/16/15
11/02/2015
141.00
Vendor AMELIO, ROBERT Total:
141.00
Vendor: ARIES INDUSTRIES INC
ARIES INDUSTRIES INC
510-35-6110
SUPPLIES
350512A
11/02/2015
120.14
ARIES INDUSTRIES INC
510-35-6110
SUPPLIES
351176
11/02/2015
1/524684
Vendor ARIES INDUSTRIES INC Total:
1,644.98
Vendor: AT&T
AT&T
100-01-5320
PRI LINES
10/16/15-11/15/15
11/02/2015
104.05
AT&T
100-02-5320
PRI LINES
10/16/15-11/15/15
11/02/2015
39.02
AT&T
100-03-5320
PRI LINES
10/16/15-11/15/15
11/02/2015
84.53
AT&T
100-04-5320
PRI LINES
10/16/15-11/15/15
11/02/2015
45,53
AT&T
100-22-5320
PRI LINES
10/16/15-11/15/15
11/02/2015
253,59
AT&T
100-30-5320
PRI LINES
10/16/15-11/15/15
11/02/2015
39.01
AT&T
100-33-5320
PRI LINES
10/16/15-11/15/15
11/02/2015
13.00
AT&T
100-41-5320
PRI LINES
10/16/15-11/15/15
11/02/2015
39.01
AT&T
100-44-5320
PRI LINES
10/16/15-11/15/15
11/02/2015
6.50
AT&T
100-46-5320
PRI LINES
10/16/15-11/15/15
11/02/2015
13.00
AT&T
100-47-5320
PRI LINES
10/16/15-11/15/15
11/02/2015
6.50
AT&T
620-00-5110
PRI LINES
10/16/15-11/15/15
11/02/2015
26.01
AT&T
100-43-5320
ALARM CIRCUITS
10/16-11/15/15
11/02/2015
256.67
AT&T
100-45-5320
ALARM CIRCUITS
10/16-11/15/15
11/02/2015
256.67
Vendor AT&T Total:
1,18109
Vendor: AUTO TECH CENTERS INC
AUTO TECH CENTERS INC
510-32-5370
VEHICLE REPAIRS
266370
11/02/2015
568,52
Vendor AUTO TECH CENTERS INC Total:
568.52
Vendor: BAKER & SON CO, PETER
BAKER & SON CO, PETER
100-33-6110
MATERIALS
37246MB
11/02/2015
270.54
BAKER & SON CO, PETER
100-33-6110
MATERIALS
37544MB
11/02/2015
2,910.41
Vendor BAKER & SON CO, PETER Total:
3,180.95
Vendor: BEARING HEADQUARTERS COMPANY
BEARING HEADQUARTERS
510-32-5375
SUPPLIES
5014911
11/02/2015
31529,99
BEARING HEADQUARTERS
510-32-6110
SUPPLIES
5021153
11/02/2015
1,241.41
Vendor
BEARING HEADQUARTERS COMPANY Total:
4,771.40
Vendor: BEHRNS, LESLIE
BEHRNS, LESLIE
100-46-5110
PARKS & REC PROGRAM
9/25/15-9/27/15
11/02/2015
300.00
Vendor BEHRNS, LESLIE Total:
300.00
10/28/2015 2:25:15 PM
Expense Approval Register
Vendor Name Account Number Description (Item)
Vendor: BIVONA, LAURIE
BIVONA, LAURIE 100-41-3637 PARKS & REC REFUND
Vendor: BOTTS WELDING & TRUCK SERVICE INC
BOTTS WELDING & TRUCK 100-33-5370 VEHICLE REPAIRS
Vendor: BREMER, CURTIS H
BREMER, CURTIS H 100-47-5110
Vendor: BRENNAN, DAN
BRENNAN, DAN 100-03-5110
BRENNAN, DAN 100-03-5110
BRENNAN, DAN 100-03-5110
Vendor: BROWN, IUDY I
BROWN, JUDY 1 100-47-5110
Vendor: BSN SPORTS INC
BSN SPORTS INC 100-47-6110
SOFTBALL UMPIRE FEES
MOWING SERVICES
MOWING SERVICES
TREE REMOVAL
PARKS &REC PROGRAM -
SUPPLIES
Packet: APPKT00239 - PARKS & REC REFUND
Payable Number Post Date Amount
127587 11/02/2015 92.00
Vendor BIVONA, LAURIE Total: 92.00
10/15/15
11/02/2015
Vendor BOTTS
WELDING & TRUCK SERVICE INC
Total:
10/5/15-10/16/15
11/02/2015
Vendor BREMER, CURTIS H
Total:
10/19/15
11/02/2015
10/21/15
11/02/2015
INV0001153
11/02/2015
Vendor BRENNAN, DAN
Total:
9/15/15-9/29/15
11/02/2015
Vendor BROWN, JUDY I
Total:
1215432
11/02/2015
Vendor BSN SPORTS INC
Total:
Vendor: CAMPBELL, MARIA BETH
CAMPBELL, MARIA BETH 100-47-5110
PARKS & REC PROGRAM
10/8/15-10/15/15
11/02/2015
Vendor CAMPBELL, MARIA BETH
Total:
Vendor: CDS OFFICE TECHNOLOGIES
CDS OFFICE TECHNOLOGIES 450-00-8300
COMPUTER EQUIPMT
INV0955607
11/02/2015
Vendor CDS OFFICE TECHNOLOGIES
Total:
Vendor: CDW GOVERNMENT INC
CDW GOVERNMENT INC 620-00-6270
SUPPLIES
ZN93353
11/02/2015
Vendor CDW GOVERNMENT INC
Total:
Vendor: CENTEGRA OCCUPATIONAL HEALTH
CENTEGRA OCCUPATIONAL 100-01-5110
MEDICALSERVICES
159845
11/02/2015
Vendor
CENTEGRA OCCUPATIONAL HEALTH
Total:
Vendor: COMED
COMED 100-33-5520
STREET LIGHTING
9/25/15-10/22/15
11/02/2015
Vendor COMED
Total:
Vendor: COMED
COMED 510-32-5510
UTILITIES
9/22/15-10/21/15
11/02/2015
Vendor COMED
Total:
Vendor: COMMUNICATIONS REVOLVING FUND
COMMUNICATIONS 620-00-5110
COMUNICATION CHARGES
T1610661
11/02/2015
Vendor COMMUNICATIONS REVOLVING FUND
Total:
Vendor: CONSERV FS
CONSERV FS 100-45-6110
SUPPLIES
65000001
11/02/2015
CONSERV FS 100-45-6110
SUPPLIES
65000219
11/02/2015
CONSERV FS 100-45-6110
SUPPLIES
65000221
11/02/2015
CONSERV FS 100-45-6110
SUPPLIES
65000594
11/02/2015
Vendor CONSERV FS
Total:
Vendor: COWLES, KATHLENE
COWLES, KATHLENE 100-41-3636
PARKS & REC PROGRAM
127702
11/02/2015
Vendor COWLES, KATHLENE
Total:
Vendor: CRESCENT ELECTRIC SUPPLY CO
CRESCENT ELECTRIC SUPPLY CO 100-33-6110
SUPPLIES
5501066046.001
11/02/2015
CRESCENT ELECTRIC SUPPLY CO 100-33-6110
SUPPLIES
5501066046.002
11/02/2015
CRESCENT ELECTRIC SUPPLY CO 100-33-6110
SUPPLIES
5501109685.001
11/02/2015
CRESCENT ELECTRIC SUPPLY CO 100-45-6110
SUPPLIES
S5011376020001
11/02/2015
72.76
156.00
156.00
840.00
400.00
2,000.00
3,240.00
125.00
125.00
1,004.37
1,004.37
40.00
40.00
5,272.00
5,272.00
134.35
134.35
120.00
120.00
151.68
iMiiCLI
167.00
260.00
250.00
81.50
758.50
96.00
59.30
98.76
66.23
246.40
10/28/2015 2:25:15 PM
Expense Approval Register
Vendor Name Account Number
CRESCENT ELECTRIC SUPPLY CO 100-45-6110
Vendor: CURRAN MATERIALS COMPANY
CURRAN MATERIALS 100-33-6110
CURRAN MATERIALS 100-33-6110
Vendor: DOCUMENT IMAGING DIMENSIONS INC
DOCUMENT IMAGING 620-00-6210
Vendor: DREISILKER ELECTRIC MOTORS INC
DREISILKER ELECTRIC MOTORS 510-31-6110
Vendor: DRYDON EQUIPMENT INC
DRYDON EQUIPMENT INC 510-32-6110
Vendor: EDER CASELLA & CO
EDER CASELLA & CO 230-00-5110
Vendor: EDESIGN
EDESIGN 100-01-5110
Vendor: ED'S RENTAL &SALES INC
ED'S RENTAL & SALES INC 100-45-6110
Vendor: EVOQUA WATER TECHNOLOGIES LLD
EVOQUA WATER 510-32-6110
EVOQUA WATER 510-32-6110
Vendor:EXPRESS AUTO GLASS
EXPRESS AUTO GLASS 510-35-5370
Vendor: FAMILIES ETC
FAMILIES ETC 100-41-3636
Vendor: FGM ARCHITECTS
FGM ARCHITECTS 400-00-8200
Vendor: FOX RIDGE NURSERY
FOX RIDGE NURSERY 100-41-6950
Vendor: FOX VALLEY FIRE &SAFETY
FOX VALLEY FIRE &SAFETY 225-00-5110
Vendor: FOXCROFT MEADOWS INC
FOXCROFT MEADOWS INC 510-35-6110
Vendor: FUN EXPRESS LLC
FUN EXPRESS LLC 100-46-6920
Vendor: GARCIA, CINDY
GARCIA, CINDY 100-41-3637
Vendor: GOLF ACADEMY AT TERRA COTTA LLC
GOLF ACADEMY AT TERRA 100-47-5110
GOLF ACADEMY AT TERRA 100-47-5110
Packet: APPKT00239 - SUPPLIES
Description (Item)
Payable Number
Post Date
Amount
SUPPLIES
5501139348.001
11/02/2015
53.42
Vendor CRESCENT ELECTRIC SUPPLY CO Total:
524.11
MATERIALS
10042
11/02/2015
1/003080
SUPPLIES
10134
11/02/2015
275.55
Vendor CURRAN MATERIALS COMPANY Total:
1,279.35
SUPPLIES
281696
11/02/2015
486.00
Vendor
DOCUMENT IMAGING DIMENSIONS INC Total:
486.00
SUPPLIES
1981517
11/02/2015
1;708e47
Vendor DREISILKER ELECTRIC MOTORS INC Total:
1,708.47
SUPPLIES
38515
11/02/2015
1,183.97
Vendor DRYDON EQUIPMENT INC Total:
1,183.97
AUDITOR EXPENSE
14262
11/02/2015
16,380.00
Vendor EDER CASELLA & CO Total:
16,380.00
CONTRACTUALSERVICES
2015600
11/02/2015
273.13
Vendor EDESIGN Total:
273.13
SUPPLIES
150550-1
11/02/2015
58.50
Vendor ED'S RENTAL & SALES INC Total:
58.50
SUPPLIES 902365543 11/02/2015 240.00
SUPPLIES 902366830 11/02/2015 2,556.00
Vendor EVOQUA WATER TECHNOLOGIES LLD Total: 2,796.00
VEHICELREPAIRS 99838 11/02/2015 207.46
Vendor EXPRESS AUTO GLASS Total: 207.46
PARKS PROGRAM REFUND 127586
11/02/2015 150.00
Vendor FAMILIES ETC Total: 150.00
MCHENRY REC CENTER 14-1800.01-14 11/02/2015
Vendor FGM ARCHITECTS Total:
FALLTREE PLANTING 32619 11/02/2015
Vendor FOX RIDGE NURSERY Total:
CONTRACTUALSERVICES 939154
SUPPLIES
SUPPLIES
PARKS &REC REFUND
PARKS &REC PROGRAM
PARKS &REC PROGRAM
49732
673097210-01
127604
INV0001140
INV0001141
11/02/2015
Vendor FOX VALLEY FIRE &SAFETY Total:
11/02/2015
Vendor FOXCROFT MEADOWS INC Total:
11/02/2015
Vendor FUN EXPRESS LLC Total:
11/02/2015
Vendor GARCIA, CINDY Total
11/02/2015
11/02/2015
5,744.00
5,744.00
9,935.00
9,935.00
195.00
195.00
272.50
272.50
175.72
175.72
50.00
50.00
245.00
50.00
10/28/2015 2:25:15 PM
Expense Approval Register
Vendor Name Account Number
GOLF ACADEMY AT TERRA 100-47-5110
Vendor: GREEN DOOR PROMOTIONS LLC
GREEN DOOR PROMOTIONS 100-46-6920
GREEN DOOR PROMOTIONS 100-47-6110
Vendor: GREGORIO, RYAN
GREGORIO, RYAN
Vendor: GREVE, CODY
GREVE, CODY
Vendor: GREVE, CODY
GREVE, CODY
Vendor: HAWKINS INC
HAWKINS INC
100-2241
Description (Item)
PARKS & REC PROGRAM
SUPPLIES
SUPPLIES
REFUND STANDARD LIFE
Packet: APPKT00239 - PARKS & REC PROGRAM
Payable Number Post Date Amount
INV0001142 11/02/2015 165.00
Vendor GOLF ACADEMY AT TERRA COTTA LLC Total: 460.00
15-1407 11/02/2015
15-1420 11/02/2015
Vendor GREEN DOOR PROMOTIONS LLC Total:
INV0001143
100-47-5110 SOFTBALL UMPIRE FEES 10/5/15-10/16/15
100-41-3637 PARKS & REC REFUND 127540
510-32-6110 SUPPLIES 3787503
Vendor: HERITAGE -CRYSTAL CLEAN LLC
HERITAGE -CRYSTAL CLEAN LLC 510-32-6110
Vendor: HRGREEN
HRGREEN
HRGREEN
HRGREEN
HRGREEN
HRGREEN
HRGREEN
HRGREEN
HRGREEN
HRGREEN
HRGREEN
HRGREEN
HRGREEN
Vendor: ILLINOIS SWIMMING
ILLINOISSWIMMING
ILLINOIS SWIMMING
ILLINOIS SWIMMING
400-00-8200
440-00-8900
440-00-8600
740-00-5220
740-00-5220
740-00-5220
580-32-8500
740-00-5220
740-00-5220
270-00-8600
270-00-8600
270-00-8600
100-47-6110
100-47-6110
100-47-6110
Vendor: IN -PIPE TECHNOLOGY COMPANY INC
IN -PIPE TECHNOLOGY 510-32-5110
Vendor: ISA
ISA
100-41-5410
Vendor: JORSON & CARLSON INC
JORSON & CARLSON INC 100-33-5370
Vendor: KARKI, STEVE
KARKI, STEVE 100-47-5110
Vendor: KELLER AMERICA INC
KELLERAMERICAINC 510-31-6110
SUPPLIES 13719688
5[yCglXdyq� fl��;�IiPF'1�:i11iy�i4UI:IY%
TRAFFIC LIGHT
100872
2015 ROAD PROGRAM
100873
CVS PLAN REVIEW
100874
WHITE OAKS REVIEW
100875
PATRIOT ESTATES 2014
100876
FIELDSTONE LIFT STATION
100877
STORMWATERAPP REVIEW OF
100879
VA CLINIC
100881
BULLVALLY/CURRAN RD
101088
BULL VALLEY RD/CURRAN RD
101101
STREET PROGRAM
4-101193
11/02/2015
Vendor GREGORIO, RYAN Total:
11/02/2015
Vendor GREVE, CODY Total:
11/02/2015
Vendor GREVE, CODY Total
11/02/2015
Vendor HAWKINS INCTotal
11/02/2015
Vendor HERITAGE -CRYSTAL CLEAN LLC Total:
11/02/2015
11/02/2015
11/02/2015
11/02/2015
11/02/2015
11/02/2015
11/02/2015
11/02/2015
11/02/2015
11/02/2015
11/02/2015
11/02/2015
Vendor HRGREEN Total:
MARLINS TEAM INV0001144 11/02/2015
COACH MEMBERSHIP THOMPSON 11/02/2015
COACH MEMBERSHIPS WILLIAMS/PRITKIN 11/02/2015
Vendor ILLINOIS SWIMMING Total:
MONTHLY SERVICE 16049 11/02/2015
Vendor IN -PIPE TECHNOLOGY COMPANY INC Total:
MEMBERSHIP DUES ISA, IAA & 12/31/15
VEHICLE REPAIRS O421494
PARKS &REC PROGRAM
SUPPLIES
9/14/15-10/13/15
63224
11/02/2015
Vendor ISA Total:
11/02/2015
Vendor JORSON & CARLSON INC Total:
11/02/2015
Vendor KARKI, STEVE Total:
11/02/2015
Vendor KELLERAMERICAINC Total:
90.00
991.00
1,081.00
13.85
13.85
184.00
184.00
150.00
150.00
3,755.60
3,755.60
165.43
i�-lrJCx?
12,148.75
5,246.00
9,490.68
506.25
3,470.92
483.00
10,455.00
6,228.00
805.00
14,361.33
20,367.00
12,849.69
96,411.62
580.00
66.00
132.00
778.00
8,000.00
8,000.00
260.00
260.00
197.25
197.25
112.00
112.00
641.23
641.23
10/28/2015 2:25:15 PM
Expense Approval Register
Packet: APPKT00239 -
VEHICLE REPAIRS
Vendor Name
Account Number
Description (Item)
Payable Number
Post Date
Amount
Vendor: KIMBALL MIDWEST
KIMBALL MIDWEST
100-33-5370
VEHICLE REPAIRS
4376557
11/02/2015
312.98
KIMBALL MIDWEST
100-33-6110
SUPPLIES
4480741
11/02/2015
490.62
KIMBALL MIDWEST
100-33-5370
VEHICLE REPAIRS
4494226
11/02/2015
288.28
Vendor KIMBALL MIDWESTTotai:
1,091.88
Vendor: KUS, TOM
KUS, TOM
100-47-5110
SOFTBALL UMPIRE FEES
10./5/15-10/16/15
11/02/2015
76.50
Vendor KUS, TOM Total:
76.50
Vendor: LAKESIDE PEST CONTROL SERVICE INC
LAKESIDE PEST CONTROL
100-01-5110
PEST CONTROLSERVICES
080141
11/02/2015
115.00
Vendor
LAKESIDE PEST CONTROL SERVICE INC Total:
115.00
Vendor: LIFEGUARD STORE INC, THE
LIFEGUARD STORE INC, THE
100-47-6110
SUPPLIES
INV332328
11/02/2015
195.50
Vendor LIFEGUARD STORE INC, THE Total:
195.50
Vendor: LUNKENHEIMER, JOHN
LUNKENHEIMER, JOHN
100-47-5110
PARKS & REC PROGRAM
9/12/15-9/26/15
11/02/2015
11.75
Vendor LUNKENHEIMER, JOHN Total:
11.75
Vendor: MCANDREWS PC, THE
LAW OFFICE OF PATRICK
MCANDREWS PC, THE LAW
100-01-5230
TRAFFIC/ORDINANCE
OCT 2015
11/02/2015
51175.00
Vendor MCANDREWS PC, THE LAW OFFICE OF PATRICK Total:
5,175.00
Vendor: MCCANN INDUSTRIES
INC
MCCANN INDUSTRIES INC
100-33-5370
VEHICLE REPAIRS
11038953
11/02/2015
359.33
MCCANN INDUSTRIES INC
100-33-5370
VEHICLE REPAIRS
11038954
11/02/2015
30.74
MCCANN INDUSTRIES INC
100-33-5370
VEHICLE REPAIRS
11038978
11/02/2015
333.45
MCCANN INDUSTRIES INC
100-33-6110
SUPPLIES
11039026
11/02/2015
220.50
Vendor MCCANN INDUSTRIES INC Total:
944.02
Vendor: MCH CTY MUNICIPAL RISK MGMT AGENCY
MCH CTY MUNICIPAL RISK
610-00-5950
INSTALL 2-2015/2016 POOL
2015-MCH-02
11/02/2015
292,536,00
Vendor MCH
CTY MUNICIPAL RISK MGMT AGENCY Total:
292,S36.00
Vendor: MCHENRY ANALYTICAL WATER LABORATORY INC
MCHENRY ANALYTICAL WATER
510-31-5110
MONTHLY DRINKING WATER
1505275
11/02/2015
420.00
MCHENRY ANALYTICAL WATER
510-32-6110
SUPPLIES
1505407
11/02/2015
120.00
MCHENRY ANALYTICAL WATER
510-32-6110
NITROGEN SAMPLES
1505408
11/02/2015
60.00
MCHENRY ANALYTICAL WATER
510-32-6110
NITROGEN SAMPLES
388982
11/02/2015
60.00
Vendor MCHENRY ANALYTICAL WATER LABORATORY INC Total:
660.00
Vendor: MCHENRY POWER EQUIPMENT INC
MCHENRY POWER EQUIPMENT
100-33-5370
VEHICLE REPAIRS
151454
11/02/2015
8.73
Vendor MCHENRY POWER EQUIPMENT INC Total:
8.73
Vendor: MCHENRY SPECIALTIES
MCHENRY SPECIALTIES
100-47-6110
SUPPLIES
2015-855
11/02/2015
112.00
Vendor MCHENRY SPECIALTIES Total:
112.00
Vendor: MCMASTER-CARR SUPPLY CO
MCMASTER-CARR SUPPLY CO
510-32-6110
SUPPLIES
18800
11/02/2015
36.58
Vendor MCMASTER-CARR SUPPLY CO Total:
36.58
Vendor: MEYER MATERIAL COMPANY
MEYER MATERIAL COMPANY
510-35-6110
MATERIALS
705829120
11/02/2015
833.69
MEYER MATERIAL COMPANY
510-35-6110
MATERIALS
705829121
11/02/2015
184.80
MEYER MATERIAL COMPANY
510-35-6110
MATERIALS
705835835
11/02/2015
93.77
MEYER MATERIAL COMPANY
100-33-6110
MATERIALS
705802377
11/02/2015
100.10
MEYER MATERIAL COMPANY
100-33-6110
MATERIALS
705816854
11/02/2015
108.94
MEYER MATERIAL COMPANY
100-33-6110
MATERIALS
705829120A
11/02/2015
227.63
MEYER MATERIAL COMPANY
100-45-6110
MATERIALS
705835835A
11/02/2015
76.97
Vendor MEYER MATERIAL COMPANY Total:
1,625.90
Vendor: MID AMERICAN WATER
OF WAUCONDA INC
MID AMERICAN WATER OF
510-35-6110
SUPPLIES
169059W
11/02/2015
135.00
Vendor MID AMERICAN WATER OF WAUCONDA INC Total:
13S.00
10/28/2015 2:25:15 PM
Expense Approval Register
Packet: APPKT00239 - CONTRACTUAL
SERVICES
Vendor Name
Account Number
Description (Item)
Payable Number
Post Date
Amount
Vendor: MIDCO
MIDCO
620-00-5110
CONTRACTUAL SERVICES
298727
11/02/2015
21604.78
Vendor MIDCO
Total:
20604.78
Vendor: MIDWEST METER INC
MIDWEST METER INC
510-31-6110
SUPPLIES
0070435-IN
11/02/2015
2,376.50
MIDWEST METER INC
510-31-6110
SUPPLIES
0071826-IN
11/02/2015
51721.00
Vendor MIDWEST METER INC
Total:
8,097.50
Vendor: MINUTEMAN PRESS OF
MCH
MINUTEMAN PRESS OF MCH
100-01-6210
SUPPLIES
84833
11/02/2015
29.20
MINUTEMAN PRESS OF MCH
100-41-5330
SUPPLIES
84836
11/02/2015
190.00
MINUTEMAN PRESS OF MCH
100-00-6210
SUPPLIES
84854
11/02/2015
11664.56
Vendor MINUTEMAN PRESS OF MCH
Total:
1,883.76
Vendor: MOORE, KEVIN
MOORE, KEVIN
100-47-5110
SOFTBALL UMPIRE FEES
10/5/15-10/16/15
11/02/2015
51.00
Vendor MOORE, KEVIN
Total:
51.00
Vendor: MOTOROLA SOLUTIONS - STARCOM21 NETWORK
MOTOROLA SOLUTIONS -
100-22-5320
STARCOM 21
201738272015
11/02/2015
2/146000
Vendor MOTOROLA
SOLUTIONS - STARCOM21 NETWORK
Total:
2,146.00
Vendor: NBS CALIBRATIONS
NBS CALIBRATIONS
510-32-6110
SUPPLIES
00096985
11/02/2015
115.00
Vendor NBS CALIBRATIONS
Total:
115.00
Vendor: NICOR GAS
NICOR GAS
100-42-5510
UTILITIES
9/14/15-10/12/15
11/02/2015
382.56
NICOR GAS
100-45-5510
UTILITIES
9/14/15-10/12/15
11/02/2015
20.89
NICOR GAS
100-46-5510
UTILITIES
9/14/15-10/12/15
11/02/2015
20.89
NICOR GAS
510-31-5510
UTILITIES
9/14-10/12/15
11/02/2015
111.27
NICOR GAS
510-32-5510
UTILITIES
9/14-10/12/15
11/02/2015
427.01
NICOR GAS
100-43-5510
UTILITIES
9/18/15-10/20/15
11/02/2015
24.89
NICOR GAS
100-45-5510
UTILITIES
9/18/15-10/20/15
11/02/2015
148A2
NICOR GAS
510-31-5510
UTILITIES
9/18-10/20/15
11/02/2015
26.37
NICOR GAS
510-32-5510
UTILITIES
9/18-10/20/15
11/02/2015
35.69
Vendor NICOR GAS
Total:
11197.99
Vendor: NORTH SUBURBAN WATER
NORTH SUBURBAN WATER
510-31-5430
MONTHLY MEETING
11/2015
11/02/2015
80.00
Vendor NORTH SUBURBAN WATER
Total:
80.00
Vendor: NWBOCA
NWBOCA
100-03-5430
IRC CLASS
INV0001145
11/02/2015
80.00
Vendor NWBOCA
Total:
80.00
Vendor: OLD TOWNE PIZZA
OLD TOWNE PIZZA
100-00-3310
REIM LIQ LICENSE FEE
INV0001154
11/02/2015
700.00
Vendor OLD TOWNE PIZZA
Total:
700.00
Vendor: OTTOSEN BRITZ KELLY COOPER &GILBERT LTD
OTTOSEN BRITZ KELLY COOPER
100-01-5230
LEGAL SERVICES
82271
11/02/2015
179.00
Vendor OTTOSEN
BRITZ KELLY COOPER &GILBERT LTD Total:
179.00
Vendor: PETERSEN, DR MICHAEL
PETERSEN, DR MICHAEL
100-00-3410
TEMP SIGN REFUND - 15-08-
INV0001146
11/02/2015
30.00
Vendor PETERSEN, DR MICHAEL Total:
30.00
Vendor: PETERSON, DWAYNE
PETERSON, DWAYNE
100-47-5110
SOFTBALL UMPIRE FEES
10/5/15-10/16/15
11/02/2015
207.00
Vendor PETERSON, DWAYNE Total:
207.00
Vendor: PETROLIANCE LLC
PETROLIANCE LLC
100-03-6250
VEHICLE FUEL
9686952
11/02/2015
119.07
PETROLIANCE LLC
100-03-6250
VEHICLE FUEL
9689913
11/02/2015
43.79
PETROLIANCE LLC
100-22-6250
VEHICLE FUEL
9689918
11/03/2015
11364.37
PETROLIANCE LLC
510-35-6250
VEHICLE FUEL
9692717
11/02/2015
177A8
PETROLIANCE LLC
100-03-6250
VEHICLE FUEL
9692746
11/02/2015
78.33
10/28/2015 2:25:15 PM
Expense Approval Register
Packet: APPKT00239 -
VEHICLE FUEL
Vendor Name
Account Number
Description (Item)
Payable Number
Post Date
Amount
PETROLIANCE LLC
510-32-6250
VEHICLE FUEL
9692747
11/02/2015
267.69
PETROLIANCE LLC
510-31-6250
VEHICLE FUEL
9692748
11/06/2015
163.66
PETROLIANCE LLC
100-45-6250
VEHICLE FUEL
9692749
11/02/2015
242.15
PETROLIANCE LLC
100-33-6250
VEHICLE FUEL
9692750
11/02/2015
752.01
PETROLIANCE LLC
100-22-6250
VEHICLE FUEL
9692751
11/02/2015
21130,14
PETROLIANCE LLC
100-22-6250
VEHICLE FUEL
9695744
11/02/2015
11873.47
PETROLIANCE LLC
100-03-6250
VEHICLE FUEL
9695739
11/02/2015
118.99
PETROLIANCE LLC
100-45-6250
VEHICLE FUEL
9695742
11/02/2015
388.86
Vendor PETROLIANCE LLC Total:
7/720601
Vendor: PETTIBONE & CO, P F
PETTIBONE & CO, P F
100-22-6110
SUPPLIES
34201
11/02/2015
294.00
PETTIBONE & CO, P F
100-22-6110
SUPPLIES
34202
11/02/2015
294.00
PETTIBONE & CO, P F
100-22-4510
EMPLOYEE UNIFORM ALLOW
34174
11/02/2015
104.45
PETTIBONE & CO, P F
100-22-4510
EMPLOYEE UNIFORM ALLOW
34175
11/02/2015
64.95
PETTIBONE & CO, P F
100-22-4510
EMPLOYEE UNIFORM ALLOW
34176
11/02/2015
54.95
PETTIBONE & CO, P F
100-22-4510
EMPLOYEE UNIFORM ALLOW
34177
11/02/2015
54.95
PETTIBONE & CO, P F
100-22-4510
EMPLOYEE UNIFORM ALLOW
34180
11/02/2015
193.95
Vendor PETTIBONE & CO, P F Total:
1,061.25
Vendor: PITEL SEPTIC INC
PITEL SEPTIC INC
100-45-5110
PORTABLE TOILET RENTAL
12233
11/02/2015
750.00
Vendor PITEL SEPTIC INC Total:
750.00
Vendor: POMPS TIRE SERVICE INC
POMPS TIRE SERVICE INC
100-33-5370
VEHICLE REPAIRS
640036045
11/02/2015
609.88
Vendor POMPS TIRE SERVICE INC Total:
609.88
Vendor: POSTMASTER MCHENRY IL
POSTMASTER MCHENRY IL
100-46-6920
SANTA LETTERS - POSTAGE
INV0001147
11/02/2015
78.40
Vendor POSTMASTER MCHENRY IL Total:
78.40
Vendor: QUALITY TIRE SERVICE
QUALITY TIRE SERVICE
100-45-5370
VEHICLE REPAIRS
39393
11/02/2015
120.00
QUALITY TIRE SERVICE
100-33-5370
VEHICLE REPAIRS
39442
11/02/2015
80.00
Vendor QUALITY TIRE SERVICE Total:
200.00
Vendor: QUILL CORPORATION
QUILL CORPORATION
100-04-6210
SUPPLIES
8593534
11/02/2015
118.38
Vendor QUILL CORPORATION Total:
118.38
Vendor: RAND, CARSON
RAND, CARSON
100-41-3637
PARKS & REC REFUND
127541
11/02/2015
75.00
Vendor RAND, CARSON Total:
75.00
Vendor: RELIABLE MAINTENANCE INC
RELIABLE MAINTENANCE INC
100-01-5110
CONTRACTUAL SERVICES
42177
11/02/2015
875.00
Vendor RELIABLE MAINTENANCE INC Total:
875.00
Vendor: RESERVE ACCOUNT
RESERVE ACCOUNT
100-01-5310
POSTAGE FOR MAILING
INV0001148
11/02/2015
11.23
RESERVE ACCOUNT
100-02-5310
POSTAGE FOR MAILING
INV0001148
11/02/2015
15.37
RESERVE ACCOUNT
100-03-5310
POSTAGE FOR MAILING
INV0001148
11/02/2015
42.01
RESERVE ACCOUNT
100-04-5310
POSTAGE FOR MAILING
INV0001148
11/02/2015
328.51
RESERVE ACCOUNT
100-22-5310
POSTAGE FOR MAILING
INV0001148
11/02/2015
205.07
RESERVE ACCOUNT
100-41-5310
POSTAGE FOR MAILING
INV0001148
11/02/2015
198.81
RESERVE ACCOUNT
510-31-5310
POSTAGE FOR MAILING
INV0001149
11/02/2015
293.86
Vendor RESERVE ACCOUNT Total:
1,094a86
Vendor: REX AUTO BODY
REX AUTO BODY
100-22-5370
VEHICLE REPAIRS
10977
11/02/2015
660.75
Vendor REX AUTO BODY Total:
660.75
Vendor: ROTARY CLUB OF MCHENRY
ROTARY CLUB OF MCHENRY
100-02-5410
DUES
2640
11/02/2015
223.00
Vendor ROTARY CLUB OF MCHENRY Total:
223.00
10/28/2015 2:25:15 PM
Expense Approval Register
Packet: APPKT00239 -
TRAVEL REIMB
Vendor Name
Account Number
Description (Item)
Payable Number
Post Date
Amount
Vendor: SCHMITT, JON
SCHM17 JON
100-30-5430
TRAVEL REIMB
INV0001150
11/02/2015
34.50
Vendor SCHMITT, JON Total:
34.50
Vendor: SHAFER. SAMUEL
SHAFER. SAMUEL
100-22-5440
TUITION REIMB
INV0001151
11/02/2015
11125.00
Vendor SHAFER. SAMUEL Total:
10125000
Vendor: SKOPEK, KRISTEN
SKOPEK, KRISTEN
100-41-3637
PARKS & REC REFUND
127539
11/02/2015
210.00
Vendor SKOPEK, KRISTEN Total:
210.00
Vendor: STAPLES ADVANTAGE
STAPLES ADVANTAGE
100-00-6210
OFFICE SUPPLIES
803646820
11/02/2015
280.76
STAPLES ADVANTAGE
100-01-6210
OFFICE SUPPLIES
803646820
11/02/2015
31.96
STAPLES ADVANTAGE
100-04-6210
OFFICE SUPPLIES
803646820
11/02/2015
57.94
STAPLES ADVANTAGE
100-41-6210
OFFICE SUPPLIES
803646820
11/02/2015
47.95
Vendor STAPLES ADVANTAGE Total:
418.61
Vendor: STAPLES CREDIT PLAN
STAPLES CREDIT PLAN
100-00-6210
OFFICE SUPPLIES
9/16/15-10/13/15
11/02/2015
69.38
STAPLES CREDIT PLAN
100-01-6210
OFFICE SUPPLIES
9/16/15-10/13/15
11/02/2015
44.91
STAPLES CREDIT PLAN
100-03-6210
OFFICE SUPPLIES
9/16/15-10/13/15
11/02/2015
87.95
STAPLES CREDIT PLAN
100-04-6210
OFFICE SUPPLIES
9/16/15-10/13/15
11/02/2015
7.67
STAPLES CREDIT PLAN
100-22-6210
OFFICE SUPPLIES
9/16/15-10/13/15
11/02/2015
146.86
Vendor STAPLES CREDIT PLAN Total:
356.77
Vendor: STEPONIK, TRESA
STEPONIK, TRESA
740-00-3750
REFUND OF RETAIN
INV0001152
11/02/2015
306.50
Vendor STEPONIK, TRESA Total:
306.50
Vendor: TEAM REIL INC
TEAM REIL INC
100-45-6110
SUPPLIES
12734P
11/02/2015
1,081.00
Vendor TEAM REIL INC Total:
1,081000
Vendor: TRAFFIC CONTROL & PROTECTION INC
TRAFFIC CONTROL &
100-33-6110
SUPPLIES
84659
11/02/2015
554.55
TRAFFIC CONTROL &
100-33-6110
SUPPLIES
84754
11/02/2015
319.15
Vendor
TRAFFIC CONTROL & PROTECTION INC Total:
873.70
Vendor: TREDROC TIRE/ANTIOCH 002
TREDROC TIRE/ANTIOCH 002
100-33-5370
VEHICLE REPAIRS
8/31/15
11/02/2015
499.52
Vendor TREDROC TIRE/ANTIOCH 002 Total:
499.52
Vendor: TYLER BUSINESS FORMS
TYLER BUSINESS FORMS
100-04-6210
SUPPLIES
214485
11/02/2015
6A4
Vendor TYLER BUSINESS FORMS Total:
6.14
Vendor: TYLER TECHNOLOGIES
TYLER TECHNOLOGIES
510-31-5110
FINANCE SOFTWARE
025-137983
11/02/2015
91.66
TYLER TECHNOLOGIES
510-32-5110
FINANCE SOFTWARE
025-137983
11/02/2015
91.67
TYLER TECHNOLOGIES
510-31-5110
FINANCE SOFTWARE
025-138485
11/02/2015
60.00
TYLER TECHNOLOGIES
510-32-5110
FINANCE SOFTWARE
025-138485
11/02/2015
60.00
Vendor TYLER TECHNOLOGIES Total:
303.33
Vendor: USA BLUEBOOK
USA BLUEBOOK
510-31-6110
SUPPLIES
754903
11/02/2015
246.77
USA BLUEBOOK
510-31-6110
SUPPLIES
757154
11/02/2015
105.90
Vendor USA BLUEBOOK Total:
352.67
Vendor: VIKING CHEMICAL COMPANY
VIKING CHEMICAL COMPANY
510-32-6110
SUPPLIES
23621
11/02/2015
81767.82
Vendor VIKING CHEMICAL COMPANY Total:
81767,82
Vendor: WASTE MANAGEMENT
OF WI PHEASANT RUN RDF
WASTE MANAGEMENT OF WI
510-32-5580
SLUDGE REMOVAL
0029475-2752-6
11/02/2015
71426.27
Vendor WASTE MANAGEMENT OF WI PHEASANT RUN RDF Total:
71426.27
10/28/2015 2:25:15 PM
Expense Approval Register
Packet: APPKT00239 "SUPPLIES
Vendor Name
Account Number
Description (Item) Payable Number Post Date
Amount
Vendor: WATER PRODUCTS -
AURORA
WATER PRODUCTS -AURORA
510-35-6110
SUPPLIES 0261919 11/02/2015
11270*00
Vendor WATER PRODUCTS - AURORA Total: 1,270.00
Vendor: WATER WELL SOLUTIONS
WATER WELL SOLUTIONS
510-31-5110
CONTRACTUAL SERVICES 133539 11/02/2015
18,230*00
Vendor WATER WELL
SOLUTIONS Total: 18,230.00
Grand Total: 553,097.86
10/28/2015 2:25:15 PM Page 9 of 12
Expense Approval Register
Packet: APPI T00239 - CONTRACTUAL SERVICES
Fund Summary
Fund
Expense Amount
100-GENERAL
FUND
58,190.43
225-ALARM
BOARD FUND
195.00
230 -
AUDIT EXPENSE FUND
16,380,00
270-
MOTOR FUEL TAX FUND
47,578.02
400 -
RECREATION CENTER FUND
17,892675
440 -
CAPITAL IMPROVEMENTS FUND
14,736.68
450-
CAPITAL EQUIPMENT FUND
5,272.00
510 -
WATER/SEWER FUND
74,801.17
580 -
UTILITY IMPROVEMENTS FUND
10,455.00
610 -
RISK MANAGEMENT FUND
292,536.00
620 -
INFORMATION TECHNOLOGY FUND
3,261.14
740 -
RETAINED PERSONNEL ESCROW
11,799.67
Grand Total• 553,097.86
Report Summary
Office of the City Administrator
Derik Morefield
McHenry Municipal Center
333 Green Street
McHenry, Illinois 60050
Phone: (815) 363-2100
Fax: (815) 363-2119
www.ci.mchenry.il.us
AGENDA SUPPLEMENT
TO: Mayor and City Council
FROM: Derik Morefield, City Administrator
FOR: November 2, 2015 Regular City Council meeting
RE: Request for a Class Al Liquor License AKLSC, LLC d/b/a Lucky Louise's
located at 341 Front Street and an Ordinance amending Municipal Code
Chapter 4 increasing the number of Class Al liquor licenses from one to two.
ATT: Application
Concept Plan/Floor Plan
Ordinance
Ms. Pamela Swift, president of AKLSC, LLC d/b/a Lucky Louise's submitted an application for
a Class Al liquor license in conjunction with a video cafe in the Fountain Shoppes retail center
located at 341 Front Street. The Class Al liquor license permits the service of beer and wine at
tables only and the retail sale of beer in packages. As a point of reference, Stuc's Pizza holds a
Class Al liquor license.
In the attached concept plan submitted by the applicant, Lucky Louise's is marketed as a family
owned and operated deli -style cafe serving wine and offering video gaming. The food will be
offered for dine -in and carry -out. Wine from Illinois Vineyards will be available for sale by the
glass and packaged. Please also note that while the conceptual site plan depicts outdoor seating,
this is subject to review and approval by the City Administration based on the amendments
recently adopted by Council regarding outdoor seating. In addition, the service of alcohol in this
outside area would be subject to a subsequent review and approval by the City Council.
All fees have been paid; and, all required paperwork has been submitted. McHenry Police
received a satisfactory fingerprint report.
If Council concurs, then it is recommended a motion is considered to a) grant a Class Al
liquor license to AKLSC, LLC d/b/a Lucky Louise's located at 341 Front Street with the
condition that all employees involved in the sale and service of alcoholic liquors obtain
State of Illinois BASSET certification; and, b) approve the attached Ordinance increasing
the number of Class Al liquor licenses in effect from one (1) to two (2).
The City of McHenry is dedicated to providing its citizens, businesses, and visitors with the highest quality of programs and
services in a customer -oriented, efficient, and fiscally responsible manner.
License No.
Date Issued
Date Effective
CITY OF MCHENRY
APPLICATION FOR LIQUOR LICENSE
UNDER
CITY OF MCHENRY LIQUOR CONTROL
ORDINANCE
FISCAL YEAR 2015/2016
TO BE FILED WITH THE
OFFICE OF THE MAYOR
Fee Received
Date Received
Receipt Issued On
Check No.
Cashier's Chk.
ALL LICENSES EXPIRE APRIL 30 Cert. Check
FOLLOWING DATE OF ISSUANCE
Cash
NAME OF BUSINESS, ADDRESS, & TELEPHONE #.:
1
2.
3.
4.
5.
6.
Please indicate form of ownership: CORPORATION PARTNERSHIP INDIVIDUAL/SOLE PROP.
IF CORPORATION:
Corporation Name: _
Corporate Address:
Corporate Phone Number:
State of Incorporation:
IF PARTNERSHIP:
Name:
Corporate Address:
Corporate Phone Number:
State of Incorporation:
IF INDIVIDUAL/SOLE PROP:
Applicant's Full Name:
Date of Birth:
Residence Address: k 5 q -o N W mve
Home Phone: � Q C` (a to ID" ©��-� Business Phone: i
Citizen of U.S.? If a naturalized citizen, when and where naturalized?
Court in which (or law under which) nduralized:
(A) If ApplicantPARTNERSHIP, give name and address of all partners holding 5% or more of the partnership interest:
(B) If Applicant is CORPORATION, give name, address and tel�hone number of owners holding 5% or more shares and registered vent:
2012
PAGE, TWO
10. If Applicant and Local Manager are not the same, givename, address and telephone number of Local Manager:
Local Manager's: Date of Orth: Place of Birth: , �Ze Citizen of U.S.?
11 Principal Type of Business: S , , & % Ct, / 6jX n �P. byva. 1 &0' Vw � n3 JJJ
12. What is current zoning for this property?
13. Type of License Sought:
ti 0 ? TM
14. Date on which business was begun at this location:,
15. Does applicant own premises for whichlicense is sought? IV C If not, state name and address of owner and attach copy of executed lease.
16. If property is ownel by a land trust, trustee must file affidavit disclosing names and adlresses of all beneficial owners and percentage of interest.
17. Is the location of applbant's business
for which
license
is so�ht within
one
hundred feet
of any
church, school
(except institutions of higbr
education), hospital, home for aged or
indigent
persons
or for veterans
and
their families
or any
mill rry or naval
station?
A. If answer to the above is "YES', is the applicant's place of business a hotel offering restaurant service, a regularly orgaraed club, a food
shop or other place where the sale of ligior is to the principal business? If yes, how long has place of business been in
operation?
18. If applicant has ever engaged in the business or sale of alcoholic liquor at retaf, list address of all bcations (may attach supplemental sheet).
19. Illinois State Liquor License Number: !�`� � Attached copy of`S/tote Liqugor License Certificate.
20. Give applicant's Retailer's Occupatbnal tax (ROT) Registration Number: p /
21. Are you delinquent in the payment of the Retailer's Occupational Tax (Sales Tax), and ifso, the reasons therefore: P,)
22.'\If this application is for a new license or a transferred license, attach to this Application a copy of Applicant's balance sheet and operating
statement for the past three years, or if nib available, other proof of financial responsibility.
23. tate name and address of dram shop insurance company for both the licensee and owner of the building in which the alcoholic liquor will to
sold for the duration of the IrcenseAND attach a copy of the declaration page showing the insured parties and amants of coverage.
24. Describe parking facilities available to the business:
25. Are you familiar withal)
the laws
of the United
States,
liquor; and will you
abide by
them?
�
of Illinois arai ordinances of the City of McHenry petaining to the sale of alcoholic
26. Will you maintain the entire premises in a safe, clean and sanitary manner free from conditions, which might cause accidents? � �.�
27. Will you attempt to prevent rowdiness, fights and disorderly conduct of any kind and imrsdiately notify the McHenry Police Department is any
such events take place? ��
28. Has any manufacturer, imputing distributor or distributor of alcoholic liquors directly or indirediy paid or agreed to pay for this licerae, advanced
money or anything else of valve or any credit (other than merchandising credit in the ordinary course of business for a penis) not in excess of 90
days), or is such a person directly or indirectly intereted in the ownership, conduct or operation of theplace of business? f�Qlf answer is
"YES", give particulars:
29. Have you,
or in the
case
of a corporation, the owners of
5% or
more sha?s of
the corporation or the local m�n�ger, or in the case of partnership,
any of the
partners,
ever
been convictedof any violation
of any
law pertaining
to alcoholic liquors? ��GG
answer is "YES", explain
30. Have you, or in the case of a corporation, the owners of 5% or more shams of the 'nand the local manager, or in tl� case of a �lt `�
partnership, any of tl� partners, ever been convicted of either a felony or a misdemeanor? If so, please describe : > S�'E- 11
31. Is any individual who is
4
directly
or indirectly interested in applicant's place of
iness, a
lawenforcing
official or
elected public official (mayor,
alderman, and member
of any
City commissioh, committee or board)?
If so,
please state
name and
address of such person:
PAGE1THREE)
32. List your occupation or employmert with addresses thereof for the past 10 years (if partnership or corporation, list sa a irdrmation for each
partner and the local manager — (please attach). �} �*y\i �� � ��,�c� �����; Nsa1,Jra
33. Have you ever been convicted of a gamblirg offense (if a partnership or corporation include all partners, owners of 5% or more shares of the
corporation and the local manager)?A40 If so, give all details:
34. Has any owners) or members) of a Partneship been issued a federal gaming devise stamp or a federal wagering stamp by thefederal
government for the current tax period? f a Corporation, has any officer, manager, or director thereof; or, anystockholder owning in the aggregate
more than twenty (20) percent of thestock, been issued a federal wagering devise stamp or a federal wagering stamp by the fderal government
for the current tax period? t4 0
35. Will you and all your employees refuse to serve or sell alcoholic liquor to an intoxicated person or to a minor? 1 �'✓�
36. Have you, or any partner, or owner of 5% or more shared Qf t6 corporation or local manager, ever had a liquor license revoked or suspended?
37. If so, give all ddails, including location of the licensed property (please attach).
CAUTION: Failure to provideaccurate or complete information may result in the su!pension and/or revocation of your liquor license
and/or the issuance of a fine.
No person holding a license issued by the City of McHenry shall, in the conduct of the licensed business or upon the licensed
premises, either directly or through the agents or employees of the licensee:
1. Violate or permit a violation of any federal law or state statue.
2. Violate or permit a violation of any City ordinance or resolution regulating the sale of alcoholic liquor or relating to the eligibility
of the licensee to hold a liquor license.
3. Violate or permit a violation of any rule or regulation of the Illinois Liquor Control Commission, as revised from time to time.
4. Permit the sale of and/or consumption of any alcoholic beverages outdoors absent a specific permit granted by the McHenry
City Council however; provided, outside sales and/or consumption shall be permitted from the hours of 11:00 a.m. to 4:30 p.m.
during Sidewalk Sales on the Saturday preceding Parade Day during Fiesta Days.
5. During Fiesta Days Celebrations on Parade Day, sell or serve (a) carryout alcoholic beverages (not including packaged liquor
sales); or (b) alcoholic beverages in non -original containers, such as plastic cups. Only original containers, such as cans, bottle
or glassware may be used.
6. Allowing fighting, disorderly conduct or excessive noise constituting a nuisance or tumultuous conduct of patrons and/or
employees of licensee as defined in the McHenry City Code, to take place on the licensed premises or on, about and/or adjacent
to the property where the licensed premises is located.
7. Allow patrons to serve or distribute alcoholic beverages to minors on the licensed premises or allow minors to drink alcoholic
beverages on the licensed premises.
8. Fail to call the City Police Department upon the violation of any City ordinance or state law relating to fighting, disorderly
conduct or excessive noise constituting a nuisance or tumultuous conduct of patrons and/or employees on the licensed
premises.
2012
PAGEFOUR
AFFIDAVIT
STATE OF ILLINOIS )
) SS
COUNTY OF MCHENRY )
I, the undersigned, being first duly sworn, deposes and says that I (we), have read tfe above and foregoing Application, caused the answers to be
provided thereto and all of the information given on said Application to be true and correct, and consent to investigation ad background check by the
Local Liquor Control Commissioner or his designee and agree to comply with all City Ordiiances and the rules stated on this applicztion.
SOLE PROPRIETOR:
Signature of Applicant
PARTNERSHIP:
(Authorized Agent of the Partnership)
Signature
Print Name
Title
CORPORATION:
(Authorized Agent of the Corporation)
Signatu (� �
Print Name
Title
MANAGER:
wpFF[C 9h�
Marcia M. Gera
Notary Public, State of "iino,
res 06112
MY Commission Expi
Signature of Local Manager
Print Name
Subscribed and sworn to before me this
flJ day of tok V , 20 k l) .
NOTARY PUBLIC
Subscribed and sworn to before me this
A
NOTARY PUBLIC
bscribed and sworn to befor m'e this /
day of 20 [
ARY PUBLIC
Subscribed and sworn to before me this
day of , 20
NOTARY PUBLIC
2012
10/6/15
lucky Louises Wine Deli Gaming
Concept Plan
A. Hi my name is Pamela Swift. I am looking to bring a family style deli to the village of
Mchenry. Our business concept will incorporate our family style recipes with a form of
class and uniqueness that all ages will be able to enjoy. We will be offering a premium
Boars Head deli product, with multiple price points. We will allow the consumer to
either dine in or carry out. This will be family owned and operated, and I will be
involved with design, construction, and compliance, starting from ground zero. My
mom and dad will also be involved, with their one of a kind Belizean style soup recipes.
We will be naming the business Lucky Louise's wine deli, after my mother Louise Swift.
B. Lucky Louise's will also offer a wide variety of wines. Our signature wine distributors
will all be handpicked from Illinois vineyards. Our business will serve Mchenry as an
affordable premium deli where you can enjoy a nice glass of wine, alongside a freshly
made sandwich/and or a sampler of meats and cheeses. Customers will not only
appreciate Lucky Louise's aesthetics but also the clean environment it provides.
C. In addition to sandwich and wine sales, we will offer video gaming as a form of
entertainment to our respective clientele.
Lucky Louise Is will apply for a gaming license once city and state liquor license
requirements have been satisfied. It is an extra form of income, to help pay the monthly
Bills.
D. Hours of operation will be Monday -Sunday in full accordance to the liquor license
hours of serving. Mon -Sat gam -lam; Sunday 10am-till our liquor liscense allows us to
stay open and serve till. Each day will be comprised of two, two person shifts. We
will have 4 full times employees and 2 part time employees (All family members).
E. Lucky Louise's will use local advertising streams to help market its business to the
community. Such as B2B promotional offers, newspaper ads, and money mailer
coupons/ads.
F. Attached is a rough concept floor plan.
60
�J
6
Kx
I
ORDINANCE NO. 15-
AN ORDINANCE
Increasing number of Class Al Liquor Licenses (Lucky Louise's)
WHEREAS, the City of McHenry, McHenry County, Illinois, is a home rule municipality
as contemplated under Article VII, Section 6, of the Constitution of the State of Illinois, and the
passage of this Ordinance constitutes an exercise of the City's home rule powers and functions as
granted in the Constitution of the State of Illinois.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF McHENRY5
McHENRY COUNTY, ILLINOIS, as follows:
SECTION 1: Section 4-6(1) of the Municipal Code relating to liquor license
classifications is hereby amended by increasing the number of Class "A1" Liquor Licenses from one
(1) to two (2).
SECTION 3: All ordinances, or parts thereof, in conflict with the terms and provisions
hereof, be and the same are hereby repealed to the extent of such conflict.
SECTION 4: This ordinance shall be published in pamphlet form by and under the
authority of the corporate authorities of the City of McHenry, Illinois.
SECTION 5.: This ordinance shall be in full force and effect from and after its passage,
approval and publication, as provided by law.
PASSED and APPROVED this 2"d day of October 2015.
Voting Aye:
Voting Nay:
Absent:
Not Voting:
Abstaining:
ATTEST:
City Clerk
Mayor
Office of the City Administrator
Derik Morefield
McHenry Municipal Center
333 Green Street
McHenry, Illinois 60050
Phone: (815) 363-2100
Fax: (815) 363-2119
www.ci.mchenry.il.us
AGENDA SUPPLEMENT
TO: Mayor and City Council
FROM: Derik Morefield, City Administrator
FOR: November 2, 2015 Regular City Council meeting
RE: Request for a Class F2 Liquor License Highland Park CVS, LLC d/b/a
CVS/Pharmacy #10470 located at 3900 West Elm Street and an Ordinance
amending Municipal Code Chapter 4 increasing the number of Class F2
liquor licenses from nine (9) to ten (10).
ATT: Application
Ordinance
An application for a Class F2 liquor licenses was submitted by CVS/Pharmacy for the new store
located at 3900 West Elm Street scheduled to open in January 2016. The Class F2 liquor license
permits the retail sale of alcohol in packages only for consumption off premises where 50% of
sales are devoted to goods and commodities other than alcoholic liquors. As a point of reference,
Walgreens and Osco Drug Store hold Class F2 licenses.
All fees have been paid; and, all required paperwork has been submitted. McHenry Police
received a satisfactory fingerprint report for the store manager Cathleen Deneen.
If Council concurs, then it is recommended a motion is considered to a) grant a Class F2
liquor license to Highland Park CVS, LLC d/b/a CVS/Pharmacy #10470 located at 3900
West Elm Street with the condition that all employees involved in the sale of alcoholic
liquors obtain State of Illinois BASSET certification; and, b) approve the attached
rdinance increasing the number of Class F2 liquor licenses in effect from ni One (9) to ten
(10).
The City of McHenry is dedicated to providing its citizens, businesses, and visitors with the highest quality of programs and
services in acustomer-oriented, efficient, and fiscally responsible manner.
CV$/pharmacy°
October 1, 2015
City of McHenry
Deputy Clerks Office
333 S Green Street
McHenry, IL 60050
RE: Alcohol License
Highland Park CVS, L.L.C.
dba CVS/pharmacy # 10470
3900 West Elm Street
McHenry, IL 60050
Dear Sir or Madam:
Enclosed please find a completed application, supporting documents and a check in the
amount of $800.00 for the Alcohol License for the above referenced pharmacy. This store is
scheduled to open January 17, 2016.
Thank you for your attention to this matter. If you have any questions or need further
information for this application please contact me (401) 770-5036 or via email at
Therese.Fluette@cvshealth.com,
Sincerely,
Therese Fluette
Licensing Coordinator
Legal Department
/tmf
Enclosures
UPS
pp., 'A�t
r
License No.�
Date Issued
Date Effective
City of McHenry
Deputy Clerks Office
333 S Green Street
McHenry, IL 60050
815-363-2108
Class F(2) License $800.00
CITY OF MCHENRY
APPLICATION FOR LIQUOR LICENSE
UNDER
CITY OF MCHENRY LIQUOR CONTROL
ORDINANCE
FISCAL YEAR 2015/2016
TO BE FILED WITH THE
OFFICE OF THE MAYOR
ALL LICENSES EXPIRE APRIL 30
FOLLOWING DATE OF ISSUANCE
Fee Received o o
Date Received
/S
Receipt Issued On 1 C) hL, S
Check No.
Cashier's Chk.
Cert. Check
Cash
NAME OF BUSINESS, ADDRESS, & TELEPHONE #.: CVSlpharmacy # 10470 located at 3900 W Elm Street
3.
4,
5.
6.
f1
f�
F!I
Please indicate form of ownership: CORPORATION
IF Q1rAiFRP1mN:LC:
Corporation Name:
Corporate Address:
Highland Park CVS, L.L.C.
McHenry, IL 60050
RTNERSHIP INDIVIDUAL/SOLE PROP. _X_LLC
One CVS Drive, Woonsocket, RI 02895
Corporate Phone Number:
State of Incorporation:
IF PARTNERSHIP
Name:
Corporate Address:
Corporate Phone Number:
State of Incorporation:
401-765-1500
IL 8/24/2001
1►1/_1
IF INDIVIDUAL/SOLE PROP:
Applicant's Full Name: NIA
Date of Birth:
Residence Address:
Home Phone:
401-765-1500
Business Phone
pending
Citizen of U.S.? yes If a naturalized citizen, when and where naturalized?
Courtin which (or law under which) naturalized:
NIA
N/A
(A) If Applicant is a PARTNERSHIP, give name and address of all partners holding 5% or more of the partnership interest:
N/A
(B) If Applicant is tS�A(7CON, give name, address and telephone number of owners holding 5% or more shares and registered agent:
Please see attached officer list
2012
1:7_[el:8r�►�c+
10, If Applicant and Local Manager are not the same, give
Cathleen Deneen 513 N River Roac
Local Manager's: Date of Birth:
11 Principal Type of Business: Retail Pharmacy
12. What is current zoning for this property?
address and telephone number of Local Manager:
enrv, IL 60051 847-533-0994
Place of Birth: Chicago, IL
13. Type of License Sought: Class F(2) License
14, Date on which business was begun at this location: 12/13/2015
Citizen of U.S.? Yes
15. Does applicant own premises for which license is sought? Yes If not, state name and address of owner and attach copy of executed lease.
Please see attached Deed
16. If property is owned by a land trust, trustee must file affidavit disclosing names and addresses of all beneficial owners and percentage of interest. NIA
17. Is the location of applicant's business for which license is sought within one hundred feet of any church, school (except institutions of higher
education), hospital, home for aged or indigent persons or for veterans and their families or any military or naval station?146 Sec A4+A4CWl
A. If answer to the above is "YES", is the applicant's place of business a hotel offering restaurant service, a regularly organized club, a food
shop or other place where the sale of liquor is to the principal business? If yes, how long has place of business been in
operation?
18. If applicant has ever engaged in the business or sale of alcoholic liquor at retail, list address of all locations (may attach supplemental sheet .
please see attache list
19. Illinois State Liquor License Number: pending city license Attached copy of State Liquor License Certificate,
20. Give applicant's Retailer's Occupational tax (ROT) Registration Number: 3381-7006
21. Are you delinquent in the payment of the Retailer's Occupational Tax (Sales Tax), and if so, the reasons therefore: No
22. If this application is for a new license or a transferred license, attach to this Application a copy of Applicant's balance sheet and operating
statement for the past three years, or if not available, other proof of financial responsibility. please See attached annual reports
23. State name and address of dram shop insurance company for both the licensee and owner of the building in which the alcoholic liquor will be
sold for the duration of the license AND attach a copy of the declaration page showing the insured parties and amounts of coverage.please See
attached
24. Describe parking facilities available to the business:
75 parking spots in a private parking lot
25. Are you familiar with all the laws of the United States, State of Illinois and ordinances of the City of McHenry pertaining to the sale of alcoholic
liquor; and will you abide by them? Yes
25. Will you maintain the entire premises in a safe, clean and sanitary manner free from conditions, which might cause accidents?
Yes
27. Will you attempt to prevent rowdiness, fights and disorderly conduct of any kind and immediately notify the McHenry Police Department is any
such events take place? Yes
28. Has any manufacturer, importing distributor or distributor of alcoholic liquors directly or indirectly paid or agreed to pay for this license, advanced
money or anything else of value or any credit (other than merchandising credit in the ordinary course of business for a perio�not in excess of 90
days), or is such a person directly or indirectly interested in the ownership, conduct or operation of the place of business? o If answer is
"YES", give particulars:
29. Have you, or in the case of a corporation, the owners of 5% or more shares of the corporation or the local manager, or in the case of partnership,
any of the partners, ever been convicted of any violation of any law pertaining to alcoholic liquors? Yes, see attached
answer is "YES", explain:
30. Have you, or in the case of a corporation, the owners of 5% or more shares of the corporation and the local manager, or in the case of a
partnership, any of the partners, ever been convicted of either a felony or a misdemeanor? Yes If so, please describe:
see attached
31. Is any individual who is directly or indirectly interested in applicant's place of business, alaw-enforcing official or elected public official (mayor,
alderman, and member of any City commission, committee or board)? No If so, please state name and address of such person:
2012
PAGE THREE
32. List your occupation or employment with addresses thereof for the past 10 years (if partnership or corporation, list same information for each
partner and the local manager — (please attach). Please see attached
33. Have you ever been convicted of a gaRbling offense (if a partnership or corporation, include all partners, owners of 5% or more shares of the
corporation and the local manager)? 1 o If so, give all details:
34. Has any owners) or members) of a Partnership been issued a federal gaming devise stamp or a federal wagering stamp by the federal
government for the current tax period? If a Corporation, has any officer, manager, or director thereof; or, any stockholder owning in the aggregate
more than twenty (20) percent of the stock, been issued a federal wagering devise stamp or a federal wagering stamp by the federal government
for the current tax period? NO
35. Will you and all your employees refuse to serve or sell alcoholic liquor to an intoxicated person or to a minor? Yes
36. Have you, or any partn N,00r owner of 5% or more shares of the corporation or local manager, ever had a liquor license revoked or suspended?
37. If so, give all details, including location of the licensed property (please attach).
CAUTION: Failure to provide accurate or complete information may result in the suspension and/or revocation of your liquor license
and/or the issuance of a fine.
No person holding a license issued by the City of McHenry shall, in the conduct of the licensed business or upon the licensed
premises, either directly or through the agents or employees of the licensee:
1. Violate or permit a violation of any federal law or state statue.
2. Violate or permit a violation of any City ordinance or resolution regulating the sale of alcoholic liquor or relating to the eligibility
of the licensee to hold a liquor license.
3. Violate or permit a violation of any rule or regulation of the Illinois Liquor Control Commission, as revised from time to time.
4. Permit the sale of and/or consumption of any alcoholic beverages outdoors absent a specific permit granted by the McHenry
City Council however; provided, outside sales and/or consumption shall be permitted from the hours of 11:00 a.m. to 4:30 p.m.
during Sidewalk Sales on the Saturday preceding Parade Day during Fiesta Days.
5, During Fiesta Days Celebrations on Parade Day, sell or serve (a) carryout alcoholic beverages (not including packaged liquor
sales); or (b) alcoholic beverages in non -original containers, such as plastic cups. Only original containers, such as cans, bottle
or glassware may be used.
6. Allowing fighting, disorderly conduct or excessive noise constituting a nuisance or tumultuous conduct of patrons and/or
employees of licensee as defined in the McHenry City Code, to take place on the licensed premises or on, about and/or adjacent
to the property where the licensed premises is located.
7. Allow patrons to serve or distribute alcoholic beverages to minors on the licensed premises or allow minors to drink alcoholic
beverages on the licensed premises.
8. Fail to call the City Police Department upon the violation of any City ordinance or state law relating to fighting, disorderly
conduct or excessive noise constituting a nuisance or tumultuous conduct of patrons and/or employees on the licensed
premises.
2012
PAGEFOUR AFFIDAVIT
STATE OF ILLINOIS )
) ss
COUNTY OF MCHENRY )
I, the undersigned, being first duly sworn, deposes and says that I (we), have read the above and foregoing Application, caused the answers to be
provided thereto and all of the information given on said Application to be true and correct, and consent to investigation and background check by the
Local Liquor Control Commissioner or his designee and agree to comply with all City Ordinances and the rules stated on this application.
SOLE PROPRIETOR: NI MX
Signature of Applicant
PARTNERSHIP:
(Authorized Agent of the Partnership) NIA
Signature
Print Name
Title
>5>ptJ[�F]O�N I-• L.C.
(Authorized Agent of th 'Corpor t�iLn��
Signature
Linda M Cimbron
Print Name
Assistant Secretary
Title
MANAGER:
nature of Local Ma
Cathleen Deneen
Print Name
Subscribed and sworn to before me this
NOTARY PUBLIC
Subscribed and sworn to before me this
An
y of
NOTARY PUBLIC
Subscribed and sworn to before me this
NOTARY
2015
Therese M. Fluette
Notary Public
State of Rhode Island
My Commission expires 09/02/2017
Su cribed anteJd �s,`y��orn to before a this—
/Sav
2012
ORDINANCE NO. 15-
AN ORDINANCE
Increasing number of Class Al Liquor Licenses (CVS/Pharmacy)
WHEREAS, the City of McHenry, McHenry County, Illinois, is a home rule municipality
as contemplated under Article VII, Section 6, of the Constitution of the State of Illinois, and the
passage of this Ordinance constitutes an exercise of the City's home rule powers and functions as
granted in the Constitution of the State of Illinois.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF McHENRY,
McHENRY COUNTY, ILLINOIS, as follows:
SECTION 1: Section 4-6(5) of the Municipal Code relating to liquor license
classifications is hereby amended by increasing the number of Class "F2" Liquor Licenses from nine
(9) to ten (10).
SECTION 3: All ordinances, or parts thereof, in conflict with the terms and provisions
hereof, be and the same are hereby repealed to the extent of such conflict.
SECTION 4: This ordinance shall be published in pamphlet form by and under the
authority of the corporate authorities of the City of McHenry, Illinois.
SECTION 5.: This ordinance shall be in full force and effect from and after its passage,
approval and publication, as provided by law.
PASSED and APPROVED this 2"d day of October 2015.
Voting Aye:
Voting Nay:
Absent:
Not Voting:
Abstaining:
ATTEST:
City Clerk
Mayor
Department of Public Works
Jon M. Schmitt, Director
1415 Industrial Drive
McHenry, Illinois 60050
Phone: (815) 363-2186
Fax: (815) 363-2214
www.ci.mchenry.il.us
REGULAR AGENDA SUPPLEMENT
DATE: November 2, 2015
TO: Mayor and City Council
FROM: Jon M. Schmitt, Director of Public Works
RE: Purchase of permanent utility and temporary construction easements from the
McHenry Country Club for the purpose of installing a 24" sanitary sewer line
between CWWTP and SWWTP
ATT: Easement agreement and exhibits
BACKGROUND: As the City Council is aware, plans are complete for the installation of a 24"
forcemain to convey raw wastewater from the Central Wastewater Treatment Plant (CWWTP)
to the South Wastewater Treatment Plant (SWWTP). The conveyance line sections required to
complete the directional boring of the 24" forcemain include: under the channel at the Riviera
Marina, across the first fairway and part of the parking area at the McHenry Country Club to the
intersection of John Street and Riverstream Drive; and then south starting at the east end of
Fairway Drive to the SWWTP (see attached exhibits). An addition to the existing utility
easement purchased from the McHenry Country Club in 2010 is required to soften the curve of
the 24" forcemain into a directional bore pit just northwest of the existing parking lot.
Temporary construction easements are also required adjacent to John Street and at the east
end of Fairway Drive.
ANALYSIS: The McHenry Country Club requested staff and the City Engineer to investigate the
installation of a parking lot as part of the 24" forcemain project as compensation for the
permanent utility easement and temporary construction easements.
It was determined that the engineer opinion of probable cost (EOPC) estimates the cost of the
parking lot (including a 20% contingency) at $60,464.00.
The City of McHenry is
dedicated to providing the
citizens, businesses and visitors of
McHenry with the highest
quality
of programs and services in
acustomer-oriented, efficient and
fiscally responsible manner.
The McHenry Country Club Board opted to accept a payment of $60,464.00 instead of the City
constructing the parking lot as part of the of the 24" forcemain project.
RECOMMENDATION: Therefore, if Council concurs, it is recommended to approve the purchase
of the permanent utility easement and temporary construction easements from the McHenry
Country Club in the amount of $60,464.00 and to authorize the Mayor to execute the attached
easement agreement.
The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest
quality of programs and services in acustomer-oriented, efficient and fiscally responsible manner.
EASEMENT AGREEMENT
In exchange for the payment of the
sum of Sixty Thousand Four Hundred
Sixty Four Dollars ($60,464.00) in
hand paid, the adequacy and
sufficiency of which is hereby
acknowledged, the McHenry Country
Club, 820 N. John St., McHenry,
Illinois, 60050 ("Grantor"), does
hereby grant, convey and transfer to
the City of McHenry ("Grantee") the
following Easement Areas:
1. An exclusive perpetual easement referred to as the North Additional UtilityEasement consisting of
approximately 1,593 square feet and a temporary construction easement consisting of approximately
15,379 square feet referred to as the North Temporary Construction Easement over, under, and upon the
respective premises legally described and depicted on the attached Exhibit A prepared by HR Green, dated
2015 and referred to as job number 86130341.
The North Additional Utility Easement Area is being conveyed for the installation and
maintenance of Grantee sanitary sewer conveyance lines, conduit, pipes, valves, and all necessary
accessories and appurtenances used in connection therewith, together with the right to remove trees,
vegetation and any other obstructions or improvements therein and for access to enter upon, in, on, under,
over and through the North Additional Utility Easement Area. This North Additional Utility Easement
Area shall perpetually run with the land in favor of the Grantee, its successors and assigns and shall be and
remain free and clear of all encumbrances.
The North Temporary Construction Easement shall exist and run with the land for eighteen (18)
months commencing from the date construction of public improvements within the North Additional
Utility Easement Area shall begin ("North TCE Commencement Date"). Notice of the North TCE
Commencement Date shall be provided in writing from Grantor to Grantee. The purpose of the North
Temporary Construction Easement is to allow the Grantee access to the North Additional Utility Easement
Area and to store machinery and material, including aggregate and pipes for the purpose of installing
sanitary sewer conveyance lines within the North Additional Utility Easement Area.
2. An additional temporary construction easement consisting of approximately 45,310 square feet
referred to as the Temporary Construction Easement over, under, and upon the premises legally described
and depicted on the attached Exhibit B prepared by HR Green, dated 2015 and referred to as job number
86130341. The Temporary Construction Easement shall run for eighteen (18) months commencing from
the date construction of public improvements within the Existing 400.0' Municipal Utility Easement
shown on Exhibit B shall begin ("TCE Commencement Date"). Notice of the TCE Commencement Date
shall be provided in writing from Grantor to Grantee. The purpose of the Temporary Construction
Easement is to allow the Grantee access to the Existing 400.0' Municipal Utility Easement area and to
store machinery and material, including aggregate and pipes for the purpose of installing sanitary sewer
conveyance lines within the Existing 400.0' Municipal Utility Easement area.
The areas referenced as the North Additional Utility Easement, North Temporary Construction
Easement and Temporary Construction Easement on Exhibits A and B, respectively, shall collectively be
referred to herein as `Basement Areas".
The Grantee hereby agrees to protect, indemnify, defend and hold harmless the Grantors, their
tenants, successors and assigns from any costs, expenses, damages, suits or claims against the Grantors
and/or their tenants, successors and assigns and resulting from Grantee's activities within the Easement
Areas. Following any construction or maintenance work within the Easement Areas, Grantee shall restore
the Easement Areas to substantially the same condition as existed at the commencement of the work.
Grantor covenants with Grantee that it is currently the lawful fee simple owner of the Easement
Areas and that the Easement Areas are not encumbered by any mortgage or lien and that it has the right
and authority to make this grant.
GRANTOR:
McHenry Country Club
Date:
Prepared by:
David W. McArdle
Zukowski, Rogers, Flood & McArdle
50 Virginia Street, Crystal Lake, Illinois 60014
815/459-2050
Z:\1VI\McHenryCityoflCountryClub\Easement. Sewer(2). doc
Mail to:
City Clerk
City of McHenry
333 S Green Street
McHenry, IL 60050
2
GRANTEE ACCEPTANCE:
City of McHenry
By
Date:
Susan E. Low, Mayor
2015
COUNTY CLERKS PLAT
LOT 5
SOUTHWEST LORNEft OF LOT 5 TH
LHE COUNTY CLERK'S PUT OE THE
NORTH HALF OF SECTOR
A6
1 D/20/2015 13:56:]6 PM
Y O:\8613034 i\Survey\Dwgz\6fi 130341_EGzemenls.ewg
NORTH TEMPORARY CONSTRUCTION USEMEM
TMAi PART OF THE NORTHEAST QUARTER OF SECTION 35, TOWNSHIP 45 NORTH. RANGE 6 EAST OF
THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS: COMMENCING AT THE SOUTHWEST CORNER
OF A PIECE D LAND DEEDED 6Y SOPHRONA, OF McHH TO GEORGE IL NOIS.BECKWITH, SAID DEED
BEING RECORDED N THE REPORTER'S OFFICE N MCHENRY SOUTHWEST
ICORNE, O BOON 64 OF
DEE05 ON PAGE 3ILA SAID POINT BEING KNOWN E THE SOUTHWEST CORNER OF NORTH, RANGE 5 OF THE
GOUT E T IRDK'PRPUPAL IERID NOR TH HALE SF TEC15 EGREE535, W32 IP 45 MINUTES 5BECONDS BESTCAST
NORTH 6) DECREES 2) MINUTES 12 SECONDS EAST, 51.86
FEET ALD CURVE
A NON TANGENT CURVE TO TEE LEFT, HAVING A
OF SAID CURVE BURS SOUTH 35 DEGREES S MINUTES D]
NORTH AODRIONAL UTILItt EASEMENT
THAT PART OF THE NORTHEAST QUARTER E SECTION F TOWNSHIP a5 NORTH, RANGE 9
UST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS FOLLOWS; COMMENCING AT THE
SOUTHWEST GIRDER OF A PIECE R LAND DEEDED BY ERS O NN BOF MCHENRY
TO CEORGE ,
BECKWRH, SAID DEED BEING RECORDED IN THE RECORDERS OFFICE OF MCHENRY COUNTY,
ILLIN015. IN BOOK 84 OF T 5 ON PAGE 312, CLE POINT BEING KNOWN AS THE
SOUTHWEST CORNER IP 5 5 H, THE 5 EA CLERK'S PUT OF THE NORTH HALF O
SECTION 35, TOWNSHIP 45 NORTH. RANGE B UST OF THE THIRD PRINCIPAL BASED
O MERIDIAN:
F
THENCE SOUTH O DEGREES S MINUTES 58 SECONDS WEST (OF 214.. BASED ON ILLINOIS
POINT
STATE PUNE COORDINATES EAST REEF S MON3). A DISTANCE CC 214.9E FEET TO A POINT
ON THE NORTH LINE OF JOHN STREET T LONUMENTEN AND OCCUPIED; THENCE STREET.
74
DEGREES 40 MINUTES ] SECONDS UST ALONG SAID NORTH LINE OF 5 SE STREET. A
DISTANCE OF HENCE FEET: THENCE NORTH 14 DEGREES 59 MINUTES 55 SECONDS EAST.
FEET; THENCE NORTH 79 DEGREES DES MINUTES Ot SECONDS UST, O THE
FEET;
THENCE NORTH 67 DEGREES 27 MINUTES 12 SECONDS FAST, 51.86 FEET TO THE POINT OF
SECONDS EAST, 55.58 FEET; THENCE SOUTH 39 DEGREES 44 MINUTES 16 SECONDS UST, 66 SOUTHEASTERLY 55.6} FEET ALONG A NO TANGENT CURVE TO THE LEFT BEING SAID
GEET: THENCE SOUTH 09 DEGREES T MINUTES 26 SECONDS WEST, SEC FEET TO SAID NORTH WESTERLY LINE, HAVING A RATIOS OF 346.4E FEET. THE CHORD OF SAID CURVE 639
UNE OF JE, 1 STREET; THENCE NORTH )4 DEGREES 40 MINUSES 43 SECONDS WEST ALONG SAID SOUTH 35 DEGREES 11 MINUTES 03 SECONDS EAST, 55.58 FEES; THENCE SOUTH 39
NORTH LINE, T59.54 FEET TO THE POINT OF BEGINNING IN THE Cltt OF MCHENRY, MCHENRY DEGREES 440 MINUTES W T, 25.95 EAST, 66.8E FEET: THENCE SOUTH 75 DEGREES 00
COUNtt, ILLINDIS. MINUTES DO SECONDS WEST, THEN FEET: THENCE NORTH 59 DEGREES 44 MINUTES O
THE ABOVE DESCRIBED PARCEL CONTAINS 15,3)9 SQUARE FEET, MORE OR LESS. SECONDS WEST, RADIUS
FEET: THENCE NORTHWESTERLY OFF FEET ALONG A CURVE TO THE
RIGHT. HAVING I RAS 5 OF 365.0E FEET, THE CHORD OF SAID CURVE BEARS REFS 36
DECREES 0 MINUTES 52 SECONDS WEST, 43.5E ET: THENCE NORTH 15 DEGREES 00
MINUTES OD SECONDS UST, 20.5E FEET TO THE POINT OF BEGINNING IN THE Cltt OF
\ MCHENRY, MCHENRY COUNTY. ILLINDIS.
\ THE ABOVE DESCRIBED PARCEL CONTAINS 1,593 SQUARE FEET. MORE OR LESS.
\ IXImMUNICIPAL
UUTY EASEMENT TT
McHENRY COUNTRY CLUB
WESTERLY LINE OF MUNICIPAL
UiIUTY EASEMENT
UFLITY
/' /
COPN SOtRPOSED TEMPORARY
LIMO? CoMiEM�T
(t5, SQ. )
�
a1
�I
POE
(RURTH TEMPORARY
CTION EASEMENT\
I
MCHENRY COUNTRY CLUB
\ PflOPO5E0 i5.0' MUNICIPK
\///''' UTILITY EASEMENT
,JOHN STREET _
HATCH LEGEND:
DENOTES TEMPORARY CONSTRUCTION
EASEMENT
NOTES MUNICIPAL UTILITY
EASEMENT
Q
l�
V
rr
0
Q
N
z
U
4
W
T
�
w
=
o
�
z
Q
J
Q
�
z
H
m
a
C7
3
U W
H ON
INTS
ORDINGLY
m
CJP
2015
341
DM6W NC
EX -A
NORTH ADDITIONAL UTILITY EASEMENT
THAT PART OF THE NORTHEAST QUARTER OF SECTION 35, TOWN3= 45
NORTH, RANGE 8 EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS
FOLLOWS: COMMENCING AT THE SOUTHWEST CORNER OF A PIECE OF
LAND DEEDED BY SOPHRONIA BECKWITH TO GEORGE H. BECKWITH, SAID
DEED BEING RECORDED IN THE RECORDER'S OFFICE OF McHENRY
COUNTY, ILLINOIS, IN BOOK 84 OF DEEDS ON PAGE 312, SAID POINT BEING
KNOWN AS THE SOUTHWEST CORNER OF LOT 5 OF THE COUNTY CLERK'S
PLAT OF THE NORTH HALF OF SECTION 35, TOWNSHIP 45 NORTH, RANGE 8
EAST OF THE THIRD PRINCIPAL MERIDIAN; THENCE SOUTH 16 DEGREES 32
MINUTES 58 SECONDS WEST (BEARINGS BASED ON ILLINOIS STATE PLANE
COORDINATES EAST ZONE NAD1983), A DISTANCE OF 214.90 FEET TO A
POINT ON THE NORTH LINE OF JOHN STREET AS MONUMENTED AND
OCCUPIED; THENCE SOUTH 74 DEGREES 40 MINUTES 43 SECONDS EAST
ALONG SAID NORTH LINE OF JOHN STREET, A DISTANCE OF 639.72 FEET;
THENCE NORTH 14 DEGREES 59 MINUTES 55 SECONDS EAST, 91.87 FEET;
THENCE NORTH 79 DEGREES 06 MINUTES 01 SECONDS EAST, 17.11 FEET,
THENCE NORTH 67 DEGREES 27 MINUTES 12 SECONDS EAST, 51.86 FEET TO
THE POINT OF BEGINNING BEING THE WESTERLY LINE OF AN EXISTING
UTILITY EASEMENT; THENCE SOUTHEASTERLY 55.63 FEET ALONG A NON
TANGENT CURVE TO THE LEFT BEING SAID WESTERLY LINE, HAVING A
RADIUS OF 348.40 FEET, THE CHORD OF SAID CURVE BEARS SOUTH 35
DEGREES 11 MINUTES 03 SECONDS EAST, 55.58 FEET; THENCE SOUTH 39
DEGREES 44 MINUTES 16 SECONDS EAST, 66.80 FEET; THENCE SOUTH 75
DEGREES 00 MINUTES 00 SECONDS WEST, 25.98 FEET; THENCE NORTH 39
DEGREES 44 MINUTES 16 SECONDS WEST, 46.17 FEET; THENCE
NORTHWESTERLY 43.62 FEET ALONG A CURVE TO THE RIGHT, HAVING A
RADIUS OF 365.00 FEET, THE CHORD OF SAID CURVE BEARS NORTH 36
DEGREES 18 MINUTES 52 SECONDS WEST, 43.59 FEET; THENCE NORTH 15
DEGREES 00 MINUTES 00 SECONDS EAST, 20.59 FEET TO THE POINT OF
BEGINNING IN THE CITY OF MCHENRY, MCHENRY COUNTY, ILLINOIS.
THE ABOVE DESCRIBED PARCEL CONTAINS 1,593 SQUARE FEET, MORE OR
LESS.
NORTH TEMPORARY CONSTRUCTION EASEMENT
THAT PART OF THE NORTHEAST QUARTER OF SECTION 35, TOWNSHIP 45
NORTH, RANGE 8 EAST OF THE THIRD PRINCIPAL MERIDIAN DESCRIBED AS
FOLLOWS: COMMENCING AT THE SOUTHWEST CORNER OF A PIECE OF
LAND DEEDED BY SOPHRONIA BECKWITH TO GEORGE H. BECKWITH, SAID
DEED BEING RECORDED IN THE RECORDER'S OFFICE OF McHENRY
COUNTY, ILLINOIS, IN BOOK 84 OF DEEDS ON PAGE 312, SAID POINT BEING
KNOWN AS THE SOUTHWEST CORNER OF LOT 5 OF THE COUNTY CLERK'S
PLAT OF THE NORTH HALF OF SECTION 35, TOWNSHIP 45 NORTH, RANGE 8
EAST OF THE THIRD PRINCIPAL MERIDIAN; THENCE SOUTH 16 DEGREES 32
MINUTES 58 SECONDS WEST (BEARINGS BASED ON ILLINOIS STATE PLANE
COORDINATES EAST ZONE NAD1983), A DISTANCE OF 214.90 FEET TO A
POINT ON THE NORTH LINE OF JOHN STREET AS MONUMENTED AND
OCCUPIED; THENCE SOUTH 74 DEGREES 40 MINUTES 43 SECONDS EAST
ALONG SAID NORTH LINE OF JOHN STREET, A DISTANCE OF 639.72 FEET TO
THE POINT OF BEGINNING; THENCE NORTH 14 DEGREES 59 MINUTES 55
SECONDS EAST, 91.87 FEET; THENCE NORTH 79 DEGREES 06 MINUTES 01
SECONDS EAST, 17.11 FEET; THENCE NORTH 67 DEGREES 27 MINUTES 12
SECONDS EAST, 51.86 FEET; THENCE SOUTHEASTERLY 55.63 FEET ALONG A
NON TANGENT CURVE TO THE LEFT, HAVING A RADIUS OF 348.40 FEET,
THE CHORD OF SAID CURVE BEARS SOUTH 35 DEGREES 11 MINUTES 03
SECONDS EAST, 55.58 FEET; THENCE SOUTH 39 DEGREES 44 MINUTES 16
SECONDS EAST, 66.80 FEET; THENCE SOUTH 09 DEGREES 15 MINUTES 28
SECONDS WEST, 57.98 FEET TO SAID NORTH LINE OF JOHN STREET;
THENCE NORTH 74 DEGREES 40 MINUTES 43 SECONDS WEST ALONG SAID
NORTH LINE, 159.54 FEET TO THE POINT OF BEGINNING IN THE CITY OF
MCHENRY, MCHENRY COUNTY, ILLINOIS.
THE ABOVE DESCRIBED PARCEL CONTAINS 15,379 SQUARE FEET, MORE OR
LESS.
McHENRY COUNTRY CLUB
i 0/20/2015 12:56:36 PM
0:\B6130341\Survey\Dugs\86130341 _Eosementz.dxg
HoA�CH LEGEND:
Tcfi TEMvaRA0.1' consmurnax
EASEMENT
NORTH LINE OF THE SOUTH
HALF OF THE FRACTIONAL. SW
CHARIER SEC-36-{SN-B-BE
r_ Isl.or
I I I
LINE IS 151.00' EAST OF AND
PARALLEL TO THE
LINE OF COUNTRY CUB RLY
ESTATES UNIT 2
I I I
I I I
TEMPORARY CONSTRUCTION EASEMENTXISTING 400.O' MUNICIPAL THAT PART OF THE SOUTH HALF OF THE FRACTIONAL
UTILITY EASEMENT CHARTER OF SECTION 36, TOWNSHIP 45 NORTH, RAN OF
THIRD PRINCIPAL MERIDIAN. CITY OF MCHENRY, MCHE
IL INOIS, DESCRIBED AS FOLLOWS: BEGINNING AT TH
CORNER OF LOT 22 OF COUNTRY CLUB ESTATES UNI
SUBDIVISION OF PART OF THE SOUTH HALF OF THE
OF SECTION 35 OF SAID TOWNSHIP; THENCE EASTERI
THE
LINE OF SAID SOUTH HALF OF THE FRACTIONAL SOUTHWEST OVARTER.
151.D3 FEET: THENCE SOUTHERLY ALONG A LINE LYING 151.00 FEET
EASTERLY OF AND PARALLEL WITH THE EASTERLY LINE OF 5A10 COUNTRY
CLUB ESTATES UNIT 2, SOUTHERLY
FEET; THENCE WESTERLY ALONG A LINE
LYING E SOUTH
FEET SOUTHERLY OF AND PARALLEL WITH SAID NORTH LINE
OF THE SOUTH HALF LY THE FRACTIONAL SOUTHWEST ALONG
SAID. 151.03
FEET 3 SAID O T E P LINE; THENCE NORTHERLY ALONG SAID EASTERLY
* LINE, }OO.OI TO THE POINT OF BEGINNING.
THE ABOVE DESCRIBED PARCEL CONTAINS 45,310 SOUARE FEET. MORE OR
LESS.
I�
/ / I
/ I
PROPOSED TEMPORARYSTR CONSTRUCTION EASEMENT
(45,310 SO. FT.)
I
I
I
(
CEBAR
or
IF
ADJUST
DIRAWN
Joe
go-
AYV
LL
Z
z
F
0
J
z
}U
C
U
W
r
fr
�
W
TEMPORARY CONSTRUCTION EASEMENT
THAT PART OF THE SOUTH HALF OF THE FRACTIONAL SOUTHWEST
QUARTER OF SECTION 36, TOWNSHIP 45 NORTH, RANGE 8 EAST OF THE
THIRD PRINCIPAL MERIDIAN, CITY OF MCHENRY, MCHENRY COUNTY,
ILLINOIS, DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHEAST
CORNER OF LOT 22 OF COUNTRY CLUB ESTATES UNIT 2 BEING A
SUBDIVISION OF PART OF THE SOUTH HALF OF THE SOUTHEAST QUARTER
OF SECTION 35 OF SAID TOWNSHIP; THENCE EASTERLY ALONG THE NORTH
LINE OF SAID SOUTH HALF OF THE FRACTIONAL SOUTHWEST QUARTER,
151.03 FEET; THENCE SOUTHERLY ALONG A LINE LYING 151.00 FEET
EASTERLY OF AND PARALLEL WITH THE EASTERLY LINE OF SAID
COUNTRY CLUB ESTATES UNIT 2, 300.07 FEET; THENCE WESTERLY ALONG
A LINE LYING 300.00 FEET SOUTHERLY OF AND PARALLEL WITH SAID
NORTH LINE OF THE SOUTH HALF OF THE FRACTIONAL SOUTHWEST
QUARTER, 151.03 FEET TO SAID EASTERLY LINE; THENCE NORTHERLY
ALONG SAID EASTERLY LINE, 300.07 TO THE POINT OF BEGINNING.
THE ABOVE DESCRIBED PARCEL CONTAINS 45,310 SQUARE FEET, MORE OR
LESS.
Department of Public Works
Jon M. Schmitt, Director
1415 Industrial Drive
McHenry, Illinois 60050
Phone: (815) 363-2186
Fax: (815) 363-2214
www.ci.mchenry.il.us
REGULAR AGENDA SUPPLEMENT
DATE: November 2, 2015
TO: Mayor and City Council
FROM: Jon M. Schmitt, Director of Public Works
RE: Water Tower #3 Maintenance Professional Services Agreement with
HR Green Inc.
ATT: 2013 Maintenance Inspection Report and HR Green Professional Services
Agreement
BACKGROUND: Water Tower #3 located at Adams Industrial Park was constructed in the fall of
2000. The coating on the tower has experienced some failures. During 2012 some spot cleaning
and coating touch-ups were completed by Water Division staff. In April 2013 Dixon Engineering
completed an inspection of the exterior and interior of the tank. The recommendations are
outlined in Dixon's report date April 10, 2013 (attached) include exterior overcoat, dry interior
painting, wet interior painting, seam sealing, flap gate installation, expansion joint replacement,
cable support relocation and overspray protection/cleaning. A 20 year life expectancy for the
coating is desirable; maintenance of the paint coatings provides longevity to the steel structure
and a clean appearance.
ANALYSIS: HR Green has submitted the attached Professional Services Agreement (PSA) for
Water Tower #3 repainting and maintenance repair. The PSA includes engineering design,
bidding services and construction observation services on a time and material basis not to
exceed $37,833.00.
The Capital Improvement Program includes $300,000 for the maintenance and repair of Water
Tower #3.
RECOMMENDATION: Therefore, if Council concurs, it is recommended to approve the attached
Professional Services Agreements with HR Green, Inc. in an amount not to exceed $37,833.00
and authorization to publicly bid the Water Tower #3 repainting and maintenance repair
project.
The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest
quality of programs and services in acustomer-oriented, efficient and fiscally responsible manner.
CONCLUSIONS:
The exterior coating is an epoxy urethane coating system that is in fair condition. The
coating has faded slightly. Primary modes of failure are rock nicks and spot coating
breaks to the substrate. The primer has good adhesion. Coating deterioration is minor
and the condition is above average for a 13-year-old coating system. The lettering is
slightly faded.
The dry interior coating is an epoxy system that is in good condition. The coating is 99
percent intact; however, minor failure has occurred on the tops of the platforms and there
are some spot failures from abrasion and age.
The wet interior coating is a three coat epoxy system that is in fair condition overall.
Below the high water line, the coating has minor spot failures on the access tube and
sidewalls. Above the high water line, the coating is in good condition. The roof coating
is deteriorating at the open lap seams and oil the roof beam edges with minor corrosion.
I2);COMM);NDATIONS:
1. Schedule regular cleanings and inspections of the tank by an independent third patty as
recommended by AW WA, or once every five years.
2. Complete the recommended work in 3-5 years. The coating work is the greatest cost and
largest part of the recommendations. The repairs and upgrades should be completed
during the next major tank rehabilitation process when coating repairs are made.
3. High-pressure water clean (5,00040,000 psi), spot power tool clean and recoat the
exterior with a polyurethane system. The estimated cost is $100,000.
4. Abrasive blast clean the topsides of the platforms, I foot up the walls, the access tube,
and bowl and the other areas of failed coating and apply a spot epoxy coating system to
all prepared surfaces. The estimated cost is $15,0009
5. Abrasive blast clean the entire wet interior to a near white metal condition (SSPGSPI O),
and apply a three -coat epoxy polyamide system. The estimated cost is $120,000.
G. After coating the wet interior, seam seal the roof lap joints with urethane caulk. The
estimated cost is $2,000.
Install cathodic clips and a pressure fitting for future installation of a submerged cathodic
protection system. The estimated cost is $I,500.
8. Install a chain link fence around the tack for security.
9. Water clean and coat the foundations to prevent further deterioration. Cost would be
incidental to exterior painting.
10. Install a painter's rigging rail outside the existing roof handrail. The estimated cost is
$2,000.
11. Install safety grabs on the exterior roof for temporary fall prevention of workers in the
wet interior. Cost would be incidental to coating costs.
12. Install couplings at the existing painter's rigging rail for temporary fall prevention of
workers in the wet interior. Cost would be incidental to coating costs.
13. Relocate the aviation lights to the roof handrail. The estimated cost is $1,000.
14. Relocate the cable support on the roof to allow the roof hatch to open properly.
15, Install a screened flap gate on the end of the overflow pipe. The estimated cost is $2,0000
16. Replace the existing roof vent screen. Cost would be incidental to exterior repainting.
17. Annually inspect the roof vent screen.
18. Remove the glandular expansion joint, and replace with a bellows -type joint. The
estimated cost is $8,000.
19.Operate the and valve annually to minimize sediment build up.
2
A DISCUSSION ON RESCUE AND RETRIEVAL OPERATIONS FROM ELEVATED
PEDESTAL STORAGE TANKS
A series of accidents involving falls from or in water tanks has highlighted inadequacies
in tank design and a potentially greater problem. The rescue may be more dangerous,
with potential for more loss of life or injury, than the original accident. Contractors and
engineers are responsible for their own employees. Even with safety training and proper
equipment, accidents will occur. Most rescue squads are local or neighboring fire
departments, some with more practice than other departments. Elevated tanks were
designed to store water, not for rescue or retrieval convenience. The following items
would make working on and retrieval from water tanks safer. This discussion is offered
as a starting point, We recommend that you meet with your rescue personnel and draft a
rescue plan. A copy of the plan should be kept at the tank and with the rescue crew.
OSHA uow requires 30-inch mauways and hatches with fall prevention on all ladders.
We have always objected to replacement of ladders as new regulations are passed
relatively frequently, especially on retrofit of existing tanks. We recommend the changes
for tite convenience and safety of your employees, rescue personnel, and others working
an the tank. As far as we know, none of these conversion items recommended are
required or mandated by any government agency for retrofits.
DIXON recorrunends these changes be made daring the next major tank painting.
RETRIEVAL CROM WET INTERIOR:
Access:
The dry interior ladders are located in the base cone, stem, and access tube. These
ladders do meet OSHA standards. All ladders do contain a rail -type fall prevention
device. There is an 18 x 24-inch manway in the access tube for access into the bottom of
the wet interior. The roof has a 30-inch diameter roof hatch for the dry interior, and a 30-
inch diameter roof hatch for the wet interior. There is a 20-foot diameter by 41-inch high
handrail on the roof with a 4-inch high toe plate. The area within the handrail is large
enough for temporary basket storage. There is not a painter's rigging rail around the
handrail.
There is a full under the bowl, and a condensate ceiling at approximately 20 feet above
the ground in the dry interior. Ladder openings iu platforms are 30-inch in diameter.
Procedure:
1. It is not possible to install a 30-inch manway iu the bottom of the tank. Retrieval must be
up to the roof by use of a winch and tripod. Rescue personnel enter the tarilc through the
304nch roof hatch or the bottom manway.
2. Inside the roof handrail, the rescue crew raises the basket to the roof using a tripod and a
winch. Place the basket on the roof while the tripod is moved over the access tube hatch.
3. Establish a helicopter rescue, or lower thre basket down the access tube to the top
platform. From the top platform, lower the basket to ground level through the 30-inch
platform hatches with a pulley or winch connected to an attaclmient lug welded to the
tank's bowl.
From the roof, it is possible to lower the basket over the side to growrd level, but that
would require a very large winch and increased loading on the attachment point. On a
rainy, windy, or snowy day, the objective would be to get rescue personnel off the roof as
soon as possible, so lowering through the dry interior is preferred.
Structural Modifications Necessary (As stated in the reconunendationsl:
], Install a painter's rail on the roof. ($2,000)
2. Weld an attaclmrent lug to the tank's bowl. Cost is incidental to coating costs.
Equipment:
Winch or pulley system.
Tag line rope.
Basket.
f:!
COST SUMMARY:
Exterior overcoat
$100,000
Dryinterior painting
153000
Wet interior paint
120000
Seam sealing
2,000
Cathodic clips
1,500
Painter's rail
2,000
Aviation lights
11000
Flap gate
2,000
Expansion joint
8 000
2511500
Engineering and Contingencies
48,500
Total
$300,000
INSPECTION:
On April 1, 2013, Dixon Engineering, Inc. (DIXON) performed a preliminary
maintenance inspection on the 750 000-gallon spheroid water storage tank owned by tine
Village of McHenry, Illinois. Purposes of the inspection were to evaluate tine interior and
exterior coating's performance and life expectancy, assess tine condition of metal surfaces
and appurtenances, review safety and health aspects, and make budgetary
recommiendations for continued maintenance of the tank. All recommendations, with
budgeting estimates for repairs are incorporated in this report. The inspection was
performed by Ton Van Gernert, project manager. The inspector was assisted by Kyle
Lay, ROV driver, and Craig Springer, staff technician.
Wet interior inspection was completed with a remotely operated vehicle (ROV). Video
of the inspection and still photos are attached from your review. No cleaning, paint
thickness, or adhesion tests are performed in the wet interior during an ROV inspection.
TANI{ INI'ORMATION:
The tank was built in 2000 by CB&I with a height -to -high-water line of 129-feet. The
tank is welded construction. The tank was last painted in 2000 by CB&I.
CONDITIONS AND RECOMMENDATIONS:
EXTCRIOR COATING CONDITIONS:
The exterior coating system is the original nnnitiple coat epoxy urethane coating system,
Information provided to DIXON showed the exterior was abrasive blast cleaned to SSPC-
SP 6 spot blasted in 2000. Bare metal surfaces were then primed, followed by
application of a fill intermediate coat, and a fill finish coat to the entire tank.
Tlie exterior coating is in fair condition overall and is beginning to chalk and fade and
there is loss of gloss. Surfaces have faded due to exposure to ultraviolet rays, which is a
normal occurrence for an exterior coating system. The coating is adequately protecting
the metal and the aesthetics are good. The system is performing as would be expected for
a 13-year-old system.
Several areas of rock chip damage were noted on the base cone and lower stem. These
areas have started to surface rust and undercut the surrounding coating.
The stem coating is in fair condition. No coating breaks were found on the stem. Minor
chalking and fading of the coating was found.
Tine coating on the bowl is in fair condition. There are minor coating breaks with small
amounts of surface rust and rust staining.
The sidewall coating is in fair condition. No coating breaks were found on tine sidewal(s.
Tlne bowl areas are covered with light algae growth.
The roof coating is in fair condition. Primary methods of roof coating deterioration is
spot coating breaks to the substrate.
Good adhesion was noted on the ASTM x-cut test areas, with trace loss of topcoat to the
substrate coat in areas tested. The tank is a candidate for over -coating.
Lettering on the tank consists of McHenry Heart of the Fox in two locations.
1;XTCRI0R COATING RCCOMNtL+NDATIONS:
Take no irmnediate action on the exterior. Budget for exterior overcoating in the year
2016, or when aesthetics dictate. Perform a maintenance inspection in five years to
update the recoating times and costs. Current adhesion showed the existing coating
would support an additional recoat.
The existing coating is a urethane system. The recommended procedure is to higln-
pressure water clean (5,00040,000 psi) the exterior to remove any delamination or
flaking coating and any contaminants, followed by spot power tool cleaning to bare metal
(SSPC-SP 11) any rusted or failed areas.
The coating system would consist of a spot prime coat on the bare metal, a full coat of
epoxy, followed by a two full coats of polyurethane. The polyurethane system offers
excellent abrasion resistance with high gloss and sheen retention. The expected life of
this system is fifteen years.. The system can be recoated again in fifteen years, and a
second time approximately fifteen years after the first recoating, extending the life of tine
coating to forty-five years before total removal would be necessary again. The tank
would be removed fron service during the painting project. This is necessary to reduce
moisture condensation on tine tank's surface. Polyurethane coatings have a miuinuan
temperature requirennent for application and are sensitive to moisture during the curing
process. If moisture is present during the curing process, the appearance will become
cloudy with little or no gloss. The estimated cost to spot power tool clean and overcoat
the existing system with an epoxy polyurethane system is $100,000.
DRY INTERiOR COATING CONDITIONS:
The dry interior area on this structure is defined as the non -water contact surfaces,
• consisting of tine base cone, stem, and access tube.
The dry interior coating is an epoxy system that is in good condition, 99 percent intact.
No significant coating deterioration was found in the base cone or stem.
The primary causes of deterioration in the access tube and bowl is rust bleed through and
spot coating breaks.
Tile coating on the tops of the platforms is in fair condition. The areas are slightly rusted.
Primary causes of deterioration is abrasion.
DRY INTERIOR COATING RECOD'1MENDATIONS:
Abrasive blast clean to a SSPC-SP6 the entire topsides of the platforms and 1 foot up the
wall, the bowl, the access tube, and the other areas of failure noted throughout the dry
interior. The bare metal would be prime coated followed by a coat of epoxy. The
estimated cost of spot repainting is $15,0000
WET INTERIOR COATING CONDITIONS:
The wet interior coating is an epoxy system applied Uy CB&I in 2000.
The roof coating is in good cmrditimr. The coating is 99 percent intact, with the primary
areas of deterioration along the lap seams, the beam edges, and in the crevices. The
tank's roof contains open lap seams that have started to rust and streak. Staining is
typical for a tank of this construction where the lap seams are open and not seal welded
or caulked. Staining in the lap seams is not a concern, but should be monitored during
fixture inspections for corrosion growth. Roof beam edge corrosion is typical but should
be corrected before structural loss of steel occurs.
Coating deterioration is occurring along edges of some of the roof support beams. Rust is
also occurring at the roof-lo-beam junction. Rust is forming at edges of the cathodic lift
boles.
The sidewall coating is in fair condition. Tire coating on the sidewalls is 99 percent
intact. There is not any significant damage at the high water line, which would be the
area most affected by ice pressures and ice movement. Causes of deterioration are spot
coating breaks. The coating is still protecting the metal, with the exception of several
spot coating breaks.
The access tube coating is in fair condition. The coating on the access tube is 99 percent
intact. There is not any significant damage at the high water line, which would be the
area most affected by ice pressures and ice movement. Below the water level, the coating
is in fair condition with a few small spot coating breaks. Above the water level, the
coating is in poor condition.
Tire coating on the tank bottom was difficult to inspect due to sediment covering the
coating. It is expected that a few spot coating breaks would be found.
Tfie tank bottom was covered with approximately 2-fnclnes of unal sediment.
The bottom, sidewall, bowl, and access tube are covered with heavy mineral staining,
which does not affect the integrity of the coating system.
WET INTERIOR COATING RECOD'111IENDATIGNS:
Remove the coating system by abrasive blast cleaning the metal to a near white metal
grade (SSPC-SP 10) and apply a new epoxy coating system. Paint systems are to be
approved for potable storage tanks contingent upon meeting requirements of National
Sanitation Foundation Standard 60/61.
Epoxy paint systems are recommended in most applications. Their drawbacks are a
minimum application temperature of 50°F or 35°F for fast cure; and long cure times, 7
days at 70°F and up to 28 days at 35°F. The coatings are formulated in high solids form
to reduce VOC emissions and have good adhesion and abrasion resistant qualities. The
coatings are normally applied in three coats with recoat times up to twenty-four hours.
The estimated cost to apply the three -coat epoxy system is $120,000.
As an alternative, apply a high film build 100% solids epoxy or plural component
urethane coating. These coating systems are not solvent based, so thicker films can be
obtained in a single pass. This saves on labor cost for applying second and third coats.
The thicker film performs better covering rough and pitted surfaces than conventional
systems. The coatings have a very short cure times usually less than forty-eight hours. In
addition, they may be applied in lower temperature conditions. However the coatings
have a higher cost due to the additional material used and the proprietary mixing and
application equipment which must be rented or purchased by the contractor. Training by
tlie material supplier is also needed to ensure that the contractor applies the product
correctly. The estimated cost for a high build epoxy or urethane system is $180,000.
After coating the roof, use a urethane caulk to fill gaps between roof sheets. The caulk
will fill open joints and seal edges, extending the life of the wet interior coating. The
estimated cost is $2,000.
CATHODIC PROTECTION CONDITIONS:
The tank does not contain a cathodic protection system.
The tank does not have clips and a pressure fitting already installed for a fuhu•e cathodic
protection installation.
CATHODIC PROTECTION RECOMMENDATIONS:
Install cathodic clips and couplings for finhue installation of floating -type cathodic
protection system. The estimated cost is $2,500.
The full all impressed current cathodic protection system could be installed at a later date.
The system is designed with a horizontal ring configuration. The anode is suspended into
the lower one-third of the tank by floats or arms off the access tube. As water fills the
tank, the anode takes the desired ring configuration. This design is considered ice -free.
Formation of ice normally occurs at the high water level and some along the sidewalk.
As long as the tank is operated in the upper one-half of its capacity, the probability of ice
damage is very low$ The anode used is a platinized niobium or titanium wire with a
design life of ten years. The system also incorporates copper/copper sulfate reference
anodes.
The system is automatically controlled by monitoring the water -to -tank potential. It
provides protection to steel surfaces where holidays (coaling pinholes) or coating breaks
exist. Cathodic protection operates by inhibiting galvanic cell corrosion where steel is
exposed. The system creates an equipotential across the tank and drives the tank
potential down to a point (-850 millivolts) where corrosion is essentially non-existent.
Only surfaces that are in contact with water are protected because water acts as the
electrolyte for the circuit. Therefore, areas of the roof and upper sidewall are not
protected by the system. The estimated cost of the fill system is $17,0004
PIT AND PIT PIPING CONDITIONS:
The tank is operated by au electronic control system located in the base cone.
SITC CONDITIONS:
The size of the tank site is large and is not fenced.
1'he site is well maintained.
There is industrial development to the east and south. It is adjacent to a ball field to the
west and an open field to the north.
The neighbors are close to the tank and extra precautions will need to be taken to keep
from getting paint or debris on the neighbors' properties.
The site is accessible from a municipal street and a paved drive.
SITC COMMENDATIONS:
Install a fence around the tank to provide increased security. The fence should be 10-12
feet larger than the bowl diameter to allow room for coutaimnent. Obtain a quote from a
qualified fencing contractor.
10
I+OUNDATION CONDITIONS:
The exposed foundation is in good condition and showed minor amounts of deterioration.
Deterioration includes cracking, with no rebar exposed.
Pressure wash the concrete and patch the small areas of deterioration. Coat the exposed
concrete to prevent further deterioration with an epoxy coating system. The cost would
be incidental to exterior painting.
GROUT CONDITIONS:
The grout is in good condition, None of the grout is missing between the bottom plate
and the foundation.
ROOK HANDRAIL AND PAINTL+R�S RAILS:
A handrail is located on the roof surrowtding the roof hatches and the vent. The handrail
is in good condition. The handrail is being used for antenna mounts.
The tank has uo roof painter's rail
ROOK HANDRAIL AND PAINTRR°S RAIL RECOMAICNDATIONS:
Install a painter's rigging rail outside the existing roof handrail. The estimated cost is
$210004
AVIATION LIGHTS AND RLL�CTRICAL CONDITIONS:
The tank has a double aviation light on the roof that is in good condition. The light is
operating properly.
The photoelectric cell for the aviation lights is located on the support arnt for the lights.
The photoelectric cell was covered during the inspection and the aviation lights were
functional.
The anterma is lug►ter than the aviation lights.
There are light fixtures located in the dry interior. None of the lights were burnt out
during the inspection.
AVIATION LIGHTS AND I$LRCTRICAL RECOMMENDATIONS:
Relocate the aviation lights to the roof handrail. The liglrts should be located to the top of
the handrail The estimated cost to relocate the lights and run new electrical conduit is
$I,000.
11
ANTCNNAS:
Tlie roof area contains one SCADA antenna. The antennas are attached to the roof
handrail.
Elie cable from the access tube to the handrail is supported by a metal angle. The
location of the angle prevents the wet interior roof hatch from opening past 90 degrees.
To keep it open, it must be tied up.
AN•P)iNNA RRC011'nNT•,NDATIONS:
Relocate the antenna and cable support on the roof to keep from interfering with the roof
batch lid.
OVL�RPLOw PIPR CONDITIONS:
The tank has an 8-inch diameter overflow pipe that extends along tine access tube iu the
dry interior down through the dry riser and exits near the bottom of the base cone.
The discharge end of the overflow pipe is screened. The screen is in good condition.
The pipe discharges to a splash pad with the required air gap. The discharge area is in
good condition.
OVL�RRLO\Y PIPL� RECOMbIRNDATIONS:
Install a screened flap gate with a corrosion resistant screen on the end of the overflow
pipe. The flap gate would allow water to discharge even if the screen becomes plugged
or frosted over. It is designed to stay closed to prevent rodents or birds from entering the
pipe. Tine estimated cost is $2,000,
HATCH AND NIANwAY CONDITIONS:
The tank has a 36 x 80 inch access door into the base cone of the tack into the dry
interior. The door is in good condition and operated properly during the inspection.
The tank has a 30-inch flip -top, round, roof access hatch to the wet interior. The hatch is
in good condition but cannot open far enough because of the cable support behind it.
Tlie tank has a 30-inch flip -top, round roof access hatch into the dry interior. The hatch
is in good condition.
12
The roof wet interior hatch was secured with a wire matching the owner's plaster key
system.
The exterior roof area contains a 24-inch diameter painter's hatch with a bolted cover that
is in good condition. The hatch is used for ventilation and lighting during maintenance or
a rescue. The nuts and bolts are rusting.
The tank has a 24-inch diameter painter's hatch (bird hatch) at the top of the riser. The
hatch is in good condition.
The tank has an 18 x 24-inch elliptical access manway in the access tube that is in good
condition,
The manway is hinged, the gasket showed no signs of leaking. The crab bolts are mildly
rusted.
The ladder openings in the dry interior platforms are 30-inch round with lids.
The top platform is a full platform.
HATCH AND MAWAY RECOMMENDATIONS:
Install a lock on the roof hatch to the wet interior. People working on tanks and antennas
on a routine basis may not be familiar with the sanitary requirements for a potable water
supply.
VENT CONDITIONS:
The roof vent is a 8-inch pressure -vacuum design. The vent is in good condition.
VENT RECOMMENDATIONS:
Replace the existing roof vent screen; the screen is starting to deteriorate. Cost would be
incidental to exterior repainting.
Annually inspect the vent to make sure the screen is open and not damaged.
LADDER CONDITIONS:
Drv;
The dry interior ladders are in good condition. They are located in the base cone, stem,
and access tube. The ladders do meet OSHA requirements.
The base cone ladder is in good condition and does have a rail -type fall prevention
device.
13
Wet:
The stem ladder is in good condition and does have a rail -type fall prevention device.
The access tube ladder is in good condition and does have a rail -type 1611 prevention
device.
The fall prevention devices are in good condition.
The wet interior contains a ladder that is iu good condition. The ladder does meet current
OSHA size requirements.
The wet interior ladder does contain a rail -type fall prevention device. The fall
prevention device is in good condition.
TILL PIP1; CONDITIONS:
The 12-inch diameter fill pipe runs tiuough the dry interior into the bottom of the bowl.
The pipe extends one foot into the bottom of the tank, There is a deflector plate over top
of the line.
1;XPANSION JOINT CONDITIONS:
The joint is covered with corrosion byproducts that will interfere with movement when it
combines with the seal material. Scale rust is over the entire joint.
The tank was not drained because this inspection was completed by ROV. No movement
of the expansion joint would occur and the joint could not be checked.
)CXPANSION JOINT I2L+COMMPNDATIONS:
Replace the glandular expansion joint with a stainless steel bellows style joint. The
bellows joint is essentially maintenance free, The estimated cost is $8,000.
MUD VALVC CONDITIONS:
A single mud valve is located in the bottom of the tank.
MUD VALVT; RLC0314MKNDATIONS:
Continue annual operation of the nmd valve to minimize sediment accunmlation.
14
CONDENSATE DRAIN CONDITIONS:
The condensate line is a 2-inch rubber hose with a check valve that nuns from the
condensate platform to the overflow pipe,
The line is in good condition, the drain in the platform appeared opeD.
WET INTERIOR METAI. CONDITIONS:
The steel structure is iR good condition above the high water line and in good condition
below it.
No pitting was found at the existing coating breaks on the sidewalls and access hube.
Roof Beams:
fhe interior roof is supported by two transverse beams that are in good condition with
minor corrosion in the crevices and on the edges.
15
DIXON ENGINEERING, INC.
STEEL TANK P'IELD INSPECTION REPORT
SPHEROID TANI{
DATE: Anril 12 2013
I, TANK DATA
OWNER: Village of McHenry
CLIENT CODE: 13-56-05-03
LOCATION: Street: Barney Ct. and Richard Ct.
City: McHenry
State: Illinois
GPS coordinates: N 42o 201 40" W 880 15` 19"
TANK SIZE: Capacity: 750,000 gallons
Diameter: 65 feet
Height to bottom (LWL): 129 feet 4 inches
Height to overflow (HWL): 160 feet
Head range: 40 feet
CONSTRUCTION:
Type of structure: Spheroid
Type of Roof: Hemisphere
Type of Bowl: Hemisphere
DATE CONSTRUCTED: 2000
MANUFACTURER: CB&I
CONTRACT NUMBER: 118263
COATING HISTORY..
_. EXTERIOR
WET
INTERIOR`
=DRY -INTERIOR
DATE LAST
COATED
2000
2000
2000
CONTRACTOR
CB&I
CB&I
CB&I
COATING SYSTEM
Urethane
Enoxy
E ox
SURFACE
PREPARATION
SSPC SP-6
SSPC SP-10
SSPC SP-6
COATING
MANUFACTURER
Tnemec
Tnemec
Tnemec
PERSONNEL: Inspector Kyle e LaX, Top person "fom Van Gernert, Ground person Craig
S rp inset
TYPE OF INSPECTION: Preliminary Maintenance
Metliod of inspection: ROV
II. INSPECTION DATA
SITE CONDITIONS
Fenced: No
Control building: No
Antenna control site: No
SCADA controls: Yes
Location of antenna: Roof
Site conditions: Well maintained
Neighborhood: Industrial
To the North: Oven field
To the East: Comnnercial building
To the South: Commercial building
To the West: Ball fields
Power lines within 50 feet: No
Site drainage: Away from taiilc
Indications of underground leakage: No
Shrub, tree, etc. encroachnnent: No
PIPING:
N/A
TOUNDATION
Foundation exposed: Yes
Exposed height: 4"14 inches
Undermining of foundation: No
Exposed foundation condition: Good
Damage or deterioration: Yes
Type of damage: Cracked
Severity: Minor
Crack location: At anchor bolts, random
Exposed rebar: No
Type of grout: Cement
Condition: Good
Grout missing: No
Indications of foundation settlement: No
Foundation commients: Fourteen cracks counted in foundation, all but 2 are located at
anchor bolts
> XTERIOR COATING
Base cone:
Stem:
Bowl:
Topcoat condition: Fnir
Primer coating condition: Good
Describe coating: Chalking, ading spot coating breaks to substrate
Dry film thickness: 7-13 mils
Coating adhesion: 4A
Metal condition: Good
Base cone comments: Spot coating repairs made by Village
Topcoat condition: Good
Primer coating condition: Good
Describe coating: Chalking fading spot coating breaks to substrate
Mildew growth: No
Metal condition: Good
Topcoat condition: Fair
Primer coating condition: Good
Describe coating: Chalking fading snot coating breaks to substrate, rust bleed
throe h
Mildew growth: Yes
Amount: Moderate
Metal condition: Good
SidewalL•
Lettering: Yes
Number: 2
Describe lettering: McHenry (in block lettering) Heart of the Fox
Logo: No
Topcoat condition: Fair
Primer coating condition: Good
Describe coating: Chalking fading spot coating breaks to substrate rust bleed
throe Ir
Metal condition: Good
Roof:
Topcoat condition: Fair
Primer coating condition: Fair
Describe coating: Chalking fading spot coating breaks to substrate rust undercutting
Dry film thickness: 8-9 mils
Coating adhesion: 4A
Metal condition: Good
T XTERIOR APPURTENANCES
Access door:
Size: 36 x 80 inches
Coating condition: Good
Metal condition: Good
Anchor bolts:
Number of bolts: 18
Diameter: I'/ inches
Anchor bolt chairs: Yes
Coating condition: Fair
Metal condition: Good
Overflow pipe:
Coating condition: Good
Metal condition: Good
Inside diameter: 8 inches
Condition of screen: Good
Percent of screen open: 50
Flap gate: No
Air gap: Yes
Bottom of pipe to ground distance: 12 inches
Splash pad: Yes
Type: Concrete pact
Condition: Good
Roof handrail:
Diameter: 20 feet
Height: 41 inches
Midrail height: 19 inches
Toe plate height: 4 inches
Coating condition: Good
Metal condition: Good
Painter's rail:
N/A
);XTERIOR APPURTE NANCEI S
Roof hatches:
Wet interior:
Coating condition: Fair
Metal condition: Good
Neck diameter: 30 inches
Shape: Round
Hatch security: Bolt
Dry interior:
Coating condition: Good
Metal condition: Good
Size: 30 inches
Shape: Round
Hatch comments: Wet interior hatch doesn't open past 90° because of SCADA cable
interference
Bolted ventilation Latch:
Coaling condition: Good
Metal condition: Good
Neck diameter:24 inches
Ventilation hatch conuuents: Rust on bolts only
Roof vents:
Number: 1
Type: Screened uressurc-vacuum
Neck diameter: 8 inches
Vent Material: Steel
Coating condition: Good
Metal condition: Good
Screen condition: Good
Percent of screen open: 99
Vent comments: Access tube air gap present but covered with robber sheet.
Aviatimr lights:
Condition: Good
Functioning: Yes
Design: Double red
Photoelectric Cell: Yes
Items higher than lights: Yes
Describe items: SCADA and whip antemia
Removable
cathodic caps:
N/A
Rigging pohnts:
Rigging couplings: Yes
Number: 2
Rigging clips: No
Coating condition: Good
Metal condition: Good
Antennas:
Roof Number: 2
Attached to: Handrail
Sidewall Number: 0
Stem Number: 0
Cable runs: In dry interior
Antennas or cables interfere with climbing or working: No
Antenna issues: Cables interfere with hatches or manways
Location: Wet interior manway opening only opens 90'
Are antennas 4G or microwave type: No
Antenna comments: One whip antenna attached to access tube penetrations
Antenna pod:
N/A
DRY INT)JRIOR
Below the bottom platform:
Topcoat condition: Good
Primer coating condition: Good
Describe coating: No significant coating deterioration
Dry film thickness: 1349 mils
Metal condition: Good
Floor: Concrete
Comments: 20 inches of concrete foundation in dry interior then the rest is gravel
Bottom platfm•m:
Platform design: Full
Coating condition: Fair
Describe coating: Spot coating breaks to substrate
Metal condition: Good
Ladder opening size: 30 inches
Shape: Round
Drain: Yes
Type: To overflow
Size: 2 inches
Functioning properly: Yes
Platform comments: Coating breaks around drain only
DRY INTERIOR
Stem above the bottom platform:
Diameter: I I feet 7 inclies
Topcoat condition: Good
Primer coating condition: Good
Describe coating: No significant coating deterioration
Dry film thickness: 1 I-15 mils
Metal condition: Good
brtermediate platform:
N/A
Top platform:
Platform design: Full
Coating condition: Poor
Describe coating: Spot coating breaks to substrate rust bleedthrough
Metal condition: Good
Ladder opening size: 30 inches
Shape: Round
Top platform comments: Rust bleed through only at painter's hatch
Stem clove the top platform:
Topcoat condition: Fair
Primer coating condition: Good
Describe coating: Rust bleed through no significant coating deterioration
other than 12 inches from tine bottom of bird hatch to platform — in that area
only
Dry film thickness: 10-15 mils
Metal condition: Good
Cone:
Material: Metal
Topcoat condition: Poor
Primer coating condition: Poor
Describe coating: Rust bleed through
Metal condition: Good
Bowl comments: Extensive rust bleed through
Access tube:
Diameter: 42 iuclnes
Topcoat condition: Fair
Primer coating condition: Fair
Describe coating: Rust bleed through
Dry film thickness: 740 mils
Metal condition: Good
Access tube conunents: Extensive rust bleed through and staining
DRY INTRRIOR APPUR I ENANCES
Base cote ladder:
Coating condition: Good
Metal condition: Good
Toe clearance: 6 inches or greater, open
Width of rungs: 16 inches
Thickness of rungs: % inch
Shape of rungs: Diannond
Fall prevention device: Yes
Type: Rail
Condition: Good
Cage: No
Stent ladder:
Coating condition: Good
Metal condition: Good
Toe clearance: 6 inches or greater
Width of nags: 16 inches
Thickness of rungs: % inch
Shape of rungs: Diannond
Fall prevention device: Yes
Type: Rail
Condition: Good
Cage: No
Access babe ladder:
Coating con(ition: Poor
Metal condition: Good
Toe clearance: 6 inches or rg eater
Width of rungs: 16 inches
Thickness of rungs: N inch
Shape of rungs: Diamond
Fall prevention device: Yes
Type: Rail
Condition: Good
Ladder comments; Extensive rust bleed through
Painter's
(bird) hatch:
Coating condition: Good
Metal condition: Good
Size: 24 inches
Manway to wet interior:
Location: hn access tube
Coating condition: Poor
DRY INTERIOR APPURTENANCES
Metal condition: Good
Size: 18 x 24 inches
Gasket leaking: No
Hinged: Yes
Expansion joint:
Location: Bottom of fill pipe
Accessible for inspection: No
Fill pipe insulation:
Type: laid foam
Condition: Good
Insulation cover: Yes
Type: Aluminum
Condition: Good
Mud valve:
Number: I
Functioning properly: Yes
Coating condition: Good
Metal condition: Good
Elechrical:
Lights fimctioning: Yes
Number burnt out: 1
Grills and globes present: Yes — globes only
Number damaged: 0
Enough light for safety: Yes
Electrical outlets: Yes
Functioning: Yes
Location: In bottom of dry interior, at top of stem at top of access tube
WET INTERIOR COATING
Roof:
Topcoat condition: Good
Primer coating condition: Good
Describe coating: Crevice corrosion edge corrosion
Metal condition: Good
Lap scams: Open
Condition of laps: Good
Sidewall:
Topcoat condition: Pair
Primer coating condition: Fair
Describe coating: Spot coating breaks to substrate
WET INTERIOR COATING
Mineral deposits: Heavy
Metal condition: Good
Active pitting: No
Access tube:
Topcoat condition: Good
Primer coating condition: Good
Describe coating: Spot coating breaks to substrate
Mineral deposits: Moderate
Metal condition: Good
Active pitting: No
Previous pitting: No
Previous pit filling: No
Access tube comments: Coating poor above high water line
Tank bottom:
Type: Cone
Depth of sediment: 2 inches
Bottom comments: Could not see due to sediment coverage
WET INTERIOR APPURTENANCES
Tank ladder:
Coating condition: Fair
Metal condition: Good
Toe clearance: 6 inches or greater
Width of rungs: 16 inclies
Thickness of rungs: 3/, inch
Shape of rungs: Diamond
Shape of side rails: Flat
Fall prevention device: Yes
Type: Rail
Condition: Good
Cathodic protection:
N/A
Fill pipe:
Diameter: 12 inches
Height above floor: 12 inches from floor
Deflector over end: Yes
Removable silt ring: No
Mixing system: No
Coating condition: Good
Metal condition: Good
10
WET INTERIOR APPURTENANCES
Separate draw pipe:
N/A
Overflow pipe:
Type: Elbow
Coating condition: Fair
Metal condition: Good
Roof beams:
Number: 2
Style: Transverse
Shape: Flat plate
Dimensions: G inches
Connections: Welded
Coating condition: Fair
Metal condition: Good
SIdewall beams:
N/A
Iuterior balcony:
N/A
pield Inspection Report is prepared from the coniractm•'s viewpohrt. It contains information the contractor
needs to prepare his bid for any repair or recoatiag. The engineer uses it to prepare the engineering report. Cost
estimates are more accurate if the contractor's problems can be anticipated. While prepared 6•om the
contractor's viewpoint, the only intended beneficiary is the owner. These reports are completed with diligence,
but the accuracy is not guaranteed. The contractor is still advised to visit the site.
11
�J
I
3. The exterior ball coating is iu
fair condition. A small amount
of mildew is present on the bowl.
2. The site around the an is
large and is surrounded by
industrial buildings and a ball
fieIds
4. The bowl and stem coating is
iu fair condition.
a
6. The coatiug on the base cone
exterior is in fair condition with
only minor coating deterioration.
5. The overflow pipe and splash
paI are in good condition.
7. The foundation and grout are
iu good condition.
9. Same.
8. The base cone interior is in
good condition.
10. The coating a� the bottom
platform is in good condition.
L'1
I5. The roof haucL•ail is in good
condition and is well coated.
14. The exterior roof coating is
in fair condition with a few spot
coating breaks to the substrate
found.
I6. The SCADA antenna is
mounted to the roof handrail. A
cable support runs from the
access tube to the rail and
orevents the wet interior lid from
opening.
18. The wet interior roof hatch is
in good condition. The lid
cannot open fully because a
cable support is directly behind
it.
17. The access tube hatch is iu
good condition.
19. The roof vent is iu good
condition and is well screened.
21. The bolted ventilation hatch
is in good condition; the bolts are
rusting.
20. The sheet over the access
tube air gap is in good condition.
22. The cable penetration in the
top of the access tube is properly
sealed.
PROFESSIONAL SERVICES AGREEMENT
For
Tower No. 3 Repainting and Maintenance Repair
Bidding and Construction Coordination Services
Jon M. Schmitt
Director %J Public Works
City of McHenry
1415 Industrial Drive
McHenry, Illinois 60050
815-363-2186
Chad J. Pieper, P.E.
City Engineer
HR Green
420 North Front Street
McHenry, Illinois 60050
86150164
November 2, 2015
TABLE OF CONTENTS
1.0 PROJECT UNDERSTANDING
2.0 SCOPE OF SERVICES
3.0 DELIVERABLES AND SCHEDULES INCLUDED IN THIS AGREEMENT
4.0 ITEMS NOT INCLUDED IN AGREEMENT/SUPPLEMENTAL SERVICES
5.0 SERVICES BY OTHERS
6.0 CLIENT RESPONSIBILITIES
7.0 PROFESSIONAL SERVICES FEE
8.0 TERMS AND CONDITIONS
Professional Services Agreement
Tower No. 3 Repainting
86150205
November 2, 2015
Page 1 of 9
THIS AGREEMENT is between CITY OF MCHENRY (hereafter "CLIENT") and HR GREEN,
INC. (hereafter "COMPANY").
1.0 Project Understanding
1.1 General Understanding
The McHenry Water Tower No. 3 interior and exterior coatings are in need of
maintenance. The CLIENT has requested that the COMPANY prepare bidding
documents, assist with administering the bid and provide general construction oversight of
the project.
1.2 Design Criteria/Assumptions
An inspection of the tower was performed by Dixon Engineering (Dixon) on April 1, 2013.
Dixon created a report from this inspection, which was dated April 10, 2013. This report
detailed the condition of the tower and made recommendations of items that should be
completed within the following 5 years. The City has reviewed these recommendations
and has chosen to proceed with the following items:
• Exterior overcoat - High-pressure exterior water cleaning, spot power clean and
recoat exterior with polyurethane system.
• Dry interior painting - Abrasive blast clean the topsides of platforms, 1 foot up the
walls, the access tube, and bowl and the other areas of failed coating and apply
epoxy coating system to all prepared surfaces.
• Wet Interior Paint - Abrasive Blast clean the entire wet interior to a near white
metal condition and apply epoxy polyamide system.
• Seam Sealing - After coating wet interior, seam seal the roof lap joints with
urethane caulk.
• Flap Gate - Install a screened flap gate on the end of the overflow pipe.
• Expansion Joint - Remove the glandular expansion joint and replace with a
bellows -type joint
• Cable Support Relocation - Relocate the cable support on the roof to allow the roof
hatch to open properly. This would be a bid alternate item.
• Overspray protection/Cleaning - Provide for protection from and incidental clean
up of any overspray.
2.0 Scope of Services
The CLIENT agrees to employ COMPANY to perform the following services:
Engineering Design:
During this phase of the project the COMPANY will:
1. Prepare construction documents for the water tower cleaning and painting
including a plan set and project manual, based on the recommendations from
Dixon, selected by the CLIENT.
2. Hold one design review meeting with the CLIENT at the 90% design stage.
Professional Services Agreement
Tower No, 3 Repainting
86150205
November 2, 2015
Page 2 of 9
3. Provide drawing for locating the City logo on the Tower and the tower painting
scheme. One (1) review and revision provided.
4. Perform a QC review focusing on issues of consistency, presentation,
organization, completeness, clarity, coordination, constructability, and cost
effectiveness of the deliverables. (Assume review at 90% design.)
5. Provide on -going Project Management for this project.
6. Provide coordination with the Illinois Environmental Protection Agency ([EPA)
during the project and submit documents required to obtain a construction permit.
Bidding Services
After authorization to proceed with the bidding phase, COMPANY shall:
1. Assume one Bidding Phase.
2. Print the required number of specifications, and contract documents for
distribution to prospective bidders. As directed by CLIENT, drawings and
specifications may be distributed electronically in pdf format in compact disc
(CD).
3. Assist the CLIENT in advertising for and obtaining bids for construction, receive
and process deposits for bidding documents, and maintain a record of
prospective bidders to whom bid documents have been issued.
4. Issue Addenda as appropriate to interpret, clarify or expand bidding documents.
5. Consult with and advise the CLIENT as to the acceptability of subcontractors,
suppliers, and other persons and organizations proposed by the Contractor for
those portions of the work where such acceptability is required by the bidding
documents.
6. Attend the bid opening, prepare bid tabulation sheets, and assist the CLIENT in
evaluating bids and awarding contracts for construction.
7. Prepare construction contract documents and deliver the executed documents to
the CLIENT and its legal counsel for review.
Construction Observation Services
1. Attend a preconstruction meeting after award of construction contract with the
CLIENT, contractor, and subcontractors.
2. Review shop drawings, samples, and other data which the contractor is required
to submit, but only for conformance with design concept of the project and
conformance with the information given in the contract documents, and only as
requested by the CLIENT. Such review shall not extend to means, methods,
techniques, sequences or procedures of construction or to safety precautions
and programs incident thereto.
3. Consult with and advise CLIENT and act as CLIENT's representative. The
CLIENT's instructions to the contractor will be issued through the COMPANY,
who will have the authority to act on behalf of CLIENT. The COMPANY shall not
act on the CLIENT's behalf without securing actual authority from the CLIENT
prior to taking such action. The COMPANY will provide qualified personnel to
Professional Services Agreement
Tower No. 3 Repainting
86150205
November 2, 2015
Page 3 of 9
perform the Scope of Services. It is agreed that COMPANY shall assign the
following personnel to manage the Services under this AGREEMENT. These
persons are designated "Key Personnel" and shall not be replaced without prior
written approval of the CLIENT.
Chad J. Pieper.
It is agreed that the CLIENT shall assign the following personnel to provide the
CLIENT's authority to act on Behalf of the CLIENT. These persons are also
designated "Key Personnel".
Jon M. Schmitt
4. During the period of construction, and only as requested by the CLIENT,
COMPANY shall make periodic visits to the site at various stages of construction
as COMPANY deems appropriate. The purpose of these visits shall be to
observe the site and work, to familiarize COMPANY with the progress and quality
of the work, and to determine for the CLIENT's benefit and protection if the work
is proceeding in accordance with the intent of the contract documents and
construction schedule. On the basis of his on -site observations as a professional
engineer, the COMPANY shall keep the CLIENT informed of the progress and
quality of the work and he shall use reasonable care to inform the CLIENT of
defects and deficiencies in the contractor's work and of the contractor's failure to
carry out the work in accordance with the intent of the construction documents
and the construction schedule. The COMPANY shall not, during such visits,
supervise, direct or have control over the contractor's work nor shall COMPANY
have authority over or responsibility for the means, methods, techniques,
sequences or procedures of construction selected by the contractor, for safety
precautions and programs incident to the work or for any failure of the contractor
to comply with laws, rules, regulations, ordinances, codes or orders applicable to
the contractor furnishing and performing his work. Accordingly, the COMPANY
makes no guarantee of the Contractor's performance of its construction contract
with the City, nor assumes responsibility for the Contractor's failure to furnish and
perform his work in accordance with the contract documents, however, this
statement does not remove or eliminate the duties and obligations of the
COMPANY as otherwise stated herein. During such visits COMPANY shall
disapprove of or reject the Contractor's work, after obtaining CLIENT's approval,
while it is in progress if COMPANY believes that such work will not produce a
completed Project that conforms generally to the contract documents or that it
will prejudice the integrity of the design concept of the Project as reflected in the
contract documents.
5. Consult with CLIENT regarding the status of the work and partial payments due
to the Contractor. Such recommendations of payment will constitute a
representation to CLIENT, that the work has progressed to the point indicated,
and that the quality of such work is substantially in conformance with the contract
documents. In the case of unit price work, COMPANY's recommendation of
payment will include determinations of quantities and classifications of such
work. COMPANY's review of the Contractor's work for the purpose of
recommending payments shall not impose on COMPANY the responsibility to
make any examination to ascertain how or for what purposes the Contractor has
Professional Services Agreement
Tower No. 3 Repainting
86150205
November 2, 2015
Page 4 of 9
used the monies paid on account of the contract price.
6. Conduct an observation as needed and requested by the CLIENT to assist the
CLIENT in determining if the work is substantially complete and a final
observation to determine if the completed work is acceptable so that COMPANY
may recommend, in writing, final payment to the contractor and may give written
notice to CLIENT and the contractor that the work is acceptable, but any such
recommendation and notice will be subject to the limitations expressed in item 3,
and the duties imposed under item 4. COMPANY will provide a punchlist for the
Contractor.
7. Review any operating and maintenance information supplied by the
manufacturers of the equipment into a Manufacturers Operations and
Maintenance Manual as provided by Dixon.
8. Provide One Year Warranty Inspection, from date of final completion.
a. Inspect the tank 's interior coating for compliance with warranty
requirements of prior interior painting contract.
b. Review all interior surfaces for corrosion and/or damage, and qualify
damage foe repairs. All repairs are to be quantified by extrapolation
of a measured area and compared with warranty requirements.
c. Inspect exterior coating.
d. Review all exterior appurtenances for damage due to corrosion.
e. Review exterior of all exposed foundations.
f. Review all health aspects of the tank, including screening of the vent,
overflow pipe, and other possible contamination sources.
g. Prepare report documenting all items found that meet or fail to meet
warranty requirements and recommendations for repair. The
engineering report will be letter format.
3.0 Deliverables and Schedules Included in this Agreement
Item
Completion
Notice To Proceed From CLIENT
November 3, 2015
Out To Bid
February 2016
Bid Opening
February 2016
Award
March 2016
Substantial Completion
August 2016
Final Completion
August 2016
This schedule was prepared to include reasonable allowances for review and approval
times required by the CLIENT and public authorities having jurisdiction over the project.
This schedule shall be equitably adjusted as the project progresses, allowing for changes
in the scope of the project requested by the CLIENT or for delays or other causes beyond
the control of COMPANY.
Professional Services Agreement
Tower No. 3 Repainting
86150205
November 2, 2015
Page 5 of 9
Deliverables for this project include:
• 90% Specifications for review — 2 paper sets of each
• Final Construction Documents — 3 paper sets for City, 10 CD copies for Bidding
• Recommendation of Award to Contractor
• Meeting Minutes from Pre -construction meetings
• Daily Observation Reports
• Laboratory tests results, as necessary
• One Year Warranty report
4.0 Items not included in Agreement/Supplemental Services
The following items are not included as part of this agreement:
1. A Engineer's Opinion of Probable Construction costs. This was provided by Dixon.
2. Additional or extended services during construction made necessary by (1) work
damaged by fire or other cause during construction, (2) a significant amount of
defective or negligent work by any contractor, (3) acceleration of the progress
schedule involving service beyond normal working hours, (4) default by any
contractor, and (5) failure of the contractor to complete the work within the
construction contract time.
3. Evaluation of unusually complex or unreasonably numerous claims submitted by
contractor or others in connection with the work.
Supplemental services not included in the agreement can be provided by COMPANY
under separate agreement, if desired.
5.0 Services by Others
Coating Inspection Services sub -contracted, with Dixon Engineering as a specialty
service.
6.0 Client Responsibilities
CLIENT shall provide the following items:
1. Prompt review of drawings, specifications, sketches, Technical Memos, and
information submitted by the COMPANY.
2. Any permits or permit fees.
3. Legal review of information as needed by the project.
4. During One Year Warranty Inspection:
a. Fill tank to overflow or high capacity, and isolate it from the system during
the ROV inspection, or as a minimum, maintain positive flow, no water
withdrawal from tank.
b. Perform free chlorine residual and bacteriological testing after completion
of inspection.
Professional Services Agreement
Tower No, 3 Repainting
86150205
November 2, 2015
Page 6 of 9
7.0 Professional Services Fee
7.1 Fees
The fee for services will be based on COMPANY standard hourly rates current at the time
the agreement is signed. These standard hourly rates are subject to change upon 30
days' written notice. Non salary expenses directly attributable to the project such as: (1)
living and traveling expenses of employees when away from the home office on business
connected with the project; (2) identifiable communication expenses; (3) identifiable
reproduction costs applicable to the work; and (4) outside services will be charged in
accordance with the rates current at the time the service is done.
7.2 Invoices
Invoices for COMPANY's services shall be submitted, on a monthly basis. Invoices shall
be due and payable upon receipt. If any invoice is not paid within 15 days, COMPANY
may, without waiving any claim or right against the CLIENT, and without liability
whatsoever to the CLIENT, suspend or terminate the performance of services. The
retainer shall be credited on the final invoice. Accounts unpaid 30 days after the invoice
date may be subject to a monthly service charge of 1.5% (or the maximum legal rate) on
the unpaid balance. In the event any portion of an account remains unpaid 60 days after
the billing, COMPANY may institute collection action and the CLIENT shall pay all costs of
collection, including reasonable attorney's fees.
7.3 Extra Services
Any service required but not included as part of this contract shall be considered extra
services. Extra services will be billed on a Time and Material basis with prior approval of
the CLIENT.
7.4 Exclusion
This fee does not include attendance at any meetings or public hearings other than those
specifically listed in the Scope of Services. These service items are considered extra and
are billed separately on an hourly basis.
7.5 Payment
The CLIENT AGREES to pay COMPANY on the following basis:
Time and material basis with a Not to Exceed fee of $37,833.00.
See attachment A for a breakdown of man hours anticipated for this project.
8.0 Terms and Conditions
The following Terms and Conditions are incorporated into this AGREEMENT and made a part of it.
8.1 Standard of Care
Services provided by COMPANY under this AGREEMENT will be performed in a manner consistent with
Illinois law applicable to the professional services provided by COMPANY.
8.2 Entire Agreement
This Agreement, and its attachments, constitutes the entire understanding between CLIENT and COMPANY
relating to professional engineering services. Any prior or contemporaneous agreements, promises,
Professional Services Agreement
Tower No. 3 Repainting
86150205
November 2, 2015
Page 7 of 9
negotiations, or representations not expressly set forth herein are of no effect. Subsequent modifications or
amendments to this Agreement shall be in writing and signed by the parties to this Agreement.
8.3 Time Limit and Commencement of Work
This AGREEMENT must be executed within ninety (90) days to be accepted under the terms set forth herein.
The work will be commenced immediately upon receipt of this signed Agreement.
8.4 Suspension of Services
If the Project or the COMPANY'S services are suspended by the CLIENT for more than thirty (30) calendar
days, consecutive or in the aggregate, over the term of this Agreement, the COMPANY shall be compensated
for all services performed and reimbursable expenses incurred prior to the receipt of notice of suspension.
If the COMPANY'S services are suspended for more than ninety (90) days, consecutive or in the aggregate,
the COMPANY may terminate this Agreement upon giving not less than five (5) calendar days' written notice
to the CLIENT.
8.5 Book of Account
COMPANY will maintain books and accounts of payroll costs, travel, subsistence, field, and incidental
expenses for a period of five (5) years. Said books and accounts will be available at all reasonable times for
examination by CLIENT at the corporate office of COMPANY during that time.
8.6 Insurance
COMPANY will maintain insurance for claims under the Worker's Compensation Laws, and from General
Liability and Automobile claims for bodily injury, death, or property damage arising from the negligent
performance by COMPANY's employees of the functions and services required under this Agreement.
Professional Liability insurance will be maintained for the professional services. See attached Exhibit B for
Certificate of Insurance..
8.7 Termination or Abandonment
The CLIENT has the option to terminate this Agreement for any reason or no reason at all.
8.8 Waiver
Either Party's waiver of any term, condition, or covenant or breach of any term, condition, or covenant, shall
not constitute a waiver of any other term, condition, or covenant, or the breach thereof.
8.9 Severability
If any provision of this Agreement is declared invalid, illegal, or incapable of being enforced by any arbitrator
or court of competent jurisdiction ("Removed Provision"), all of the remaining provisions of this Agreement
shall nevertheless continue in full force and effect, and no provision shall be deemed dependent upon any
other provision unless so expressed herein. Provided, however, should an arbitrator or judge find that the
Removed Provision is found to substantially affect the remaining terms of this Agreement, the arbitrator or
court may blue pencil the Agreement according to intent of the parties.
8.10 Successors and Assigns
No assignment of this Agreement shall be made without written consent of the parties to this Agreement.
8.11 Third -Party Beneficiaries
Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of
a third party against either the CLIENT or the COMPANY. The COMPANY's services under this Agreement
are being performed solely for the CLIENT 's benefit, and no other party or entity shall have any claim against
the COMPANY because of this Agreement or the performance or nonperformance of services hereunder.
The CLIENT and COMPANY agree to require a similar provision in all contracts with contractors,
subcontractors, subconsultants, vendors and other entities involved in this project to carry out the intent of this
provision.
Professional Services Agreement
Tower No. 3 Repainting
86150205
November 2, 2015
Page 8 of 9
8.12 Governing Law and Jurisdiction
The CLIENT and the COMPANY agree that this Agreement and any legal actions concerning its validity,
interpretation and performance shall be governed by the laws of the State of Illinois, McHenry County without
regard to any conflict of laws provisions, which may apply the laws of other jurisdictions.
8.13 Dispute Resolution
The CLIENT and COMPANY agree that they will first attempt to mutually work towards a resolution on any
dispute between them arising out of or relating to this agreement. In the event a mutual agreement cannot be
made between the parties, any controversy or claim arising out of or relating to this Agreement, or the breach
thereof, shall be settled by binding arbitration administered by the American Arbitration Association under its
Construction Industry Arbitration Rules or ADR Systems, Chicago, Illinois, In the discretion of the CLIENT, at
the McHenry Municipal Center, 333 South Green Street, McHenry, Illinois, and judgment on the award
rendered by the arbitrator may be entered in any court having jurisdiction thereof. Provided, however, the only
exception to this exclusive procedure is with regard to enforcement of equitable remedies such as injunctive
relief and mechanic lien rights which may be maintained by filing suit in the 22"d Judicial Circuit Court,
McHenry County, Illinois. In the event of arbitration or litigation of this Agreement between the CLIENT and
the COMPANY, the prevailing party to any litigation or arbitration shall be entitled to recover from the non -
prevailing party all of its expenses incurred, including but not limited to (a) attorneys' fees, (b) filing costs, (c)
witness fees, and (d) other general expenses of the litigation or arbitration.
8.14 Ownership of Instruments of Service
All reports, plans, specifications, field data, field notes, laboratory test data, calculations, estimates and other
documents including all documents on electronic media prepared by COMPANY as instruments of service
shall remain the property of COMPANY. At no cost to CLIENT, documents referenced in this section 8.14,
shall be provided to the CLIENT in any requested format.
8.15 Reuse of Documents
All project documents including, but not limited to, plans and specifications furnished by COMPANY under this
project are intended for use on this project only. Any reuse, without specific written verification or adoption by
COMPANY, shall be at the CLIENT's sole risk, and CLIENT shall defend, indemnify and hold harmless
COMPANY from all claims, damages and expenses including attorney's fees arising out of or resulting
therefrom.
In no event shall the COMPANY be liable for indirect or consequential damages as a result of the CLIENT's
reuse of the electronic files.
8.16 Design Information in Electronic Form
CLIENT shall retain copies of the work performed by COMPANY in electronic form only for information and
use by CLIENT for the specific purpose for which COMPANY was engaged, except as otherwise provided for
herein. Said material shall not be used by CLIENT or transferred to any other party, for use in other projects,
additions to this project, or any other purpose for which the material was not strictly intended by COMPANY
without COMPANY's expressed written permission. Any unauthorized use or reuse or modifications of this
material shall be at CLIENT'S sole risk.
8.17 Job Site Visits and Safety
Neither the professional activities of COMPANY, nor the presence of COMPANY'S employees and
subconsultants at a construction site, shall relieve the General Contractor and any other entity of their
obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence,
techniques or procedures necessary for performing, superintending or coordinating all portions of the work of
construction in accordance with the contract documents and any health or safety precautions required by any
regulatory agencies. COMPANY and its personnel have no authority to exercise any control over any
construction contractor or other entity or their employees in connection with their work or any health or safety
precautions. The CLIENT agrees that the General Contractor is solely responsible for job site safety, and
warrants that this intent shall be made evident in the CLIENT's AGREEMENT (prepared by the COMPANY)
with the General Contractor. The CLIENT also agrees that the COMPANY may confirm that the CLIENT's
AGREEMENT (prepared by the COMPANY) provides that the CLIENT, COMPANY and COMPANY'S
consultants shall be shall be made additional insureds on the General Contractor's and all subcontractor's
general liability policies on a primary and non-contributory basis.
Professional Services Agreement
Tower No. 3 Repainting
86150205
November 2, 2015
Page 9 of 9
8.18 Indemnification
The COMPANY agrees, to the fullest extent permitted by law, to indemnify and hold harmless the CLIENT, its
officers, directors and employees (collectively, CLIENT) against all damages, liabilities or costs, including
reasonable attorneys' fees and defense costs, to the extent caused by the COMPANY'S negligent
performance of professional services under this Agreement and that of its subconsultants or anyone for whom
the COMPANY is legally liable.
The CLIENT agrees, to the fullest extent permitted by law, to indemnify and hold harmless the COMPANY, its
officers, directors, employees and subconsultants (collectively, COMPANY) against all damages, liabilities or
costs, including reasonable attorneys' fees and defense costs, to the extent caused by the CLIENT'S
negligent acts in connection with the Agreement and the acts of its contractors, subcontractors or consultants
or anyone for whom the CLIENT is legally liable.
Neither the
CLIENT nor
the CONSULTANT shall
be
obligated to indemnify the other party in any manner
whatsoever
for the other
party's own negligence or
for
the negligence of others.
8.19 Municipal Advisor
The COMPANY is not a Municipal Advisor registered with the Security and Exchange Commission (SEC) as
defined in the Dodd -Frank Wall Street Reform and Consumer Protection Act. When the CLIENT is a
municipal entity as defined by said Act, and the CLIENT requires project financing information for the services
performed under this AGREEMENT, the CLIENT will provide the COMPANY with a letter detailing who their
independent registered municipal advisor is and that the CLIENT will rely on the advice of such advisor. A
sample letter can be provided to the CLIENT upon request.
This AGREEMENT is approved and accepted by the CLIENT and COMPANY upon both parties
signing and dating the AGREEMENT. Services will not begin until COMPANY receives a
signed agreement. COMPANY's services shall be limited to those expressly set forth in this
AGREEMENT and COMPANY shall have no other obligations or responsibilities for the Project
except as agreed to in writing. The effective date of the AGREEMENT shall be the last date
entered below.
Sincerely,
HR GREEN, 1NC.
City Engineer
Approved by:
Printed/Typed Name
Title:
CITY OF McHENRY
Accepted by:
Printed/Typed Name:
Title:
Date:
Date:
Hrgmhnas:\\O:\86150205\Design\Contract\agt-110215-HR_Green_PSA-McHenry Watertower No 3_cjp.docx
HRGreen
Man -Hour Estimate
Water Tower No. 3
Job Number: 86150205
Date: November 2, 2015
Exhibit A
TASK
Personnel
MAN-
HOURS
IABOR COST
Engineering Design
Project Manager
8
$1,288.00
Project Engineer
16
$2,192.00
QC Engineer
2
$322000
Admin.
1
$94.00
Subtotal.
27
$3,89&00
Bidding Services
Project Manager
4
$805000
Project Engineer
12
$1,644000
Admin.
1
$94.00
Subtotal.
17
$2,543.00
Construction Administration
Project Manager
8
$10288600
Project Engineer
14
$1,918000
Admin.
2
$188000
Subconsultant
$281000.00
Subtotal:
24
$31,394M
Contract Total:
$37,833.00
Based upon our understanding of the project detailed in this Contract, the above is a summary of man-
hours and costs associated with the project. This Contract will be completed as a Time and Material,
Not -to -Exceed Contract.
Hrgmhnas\\O:\86150205\Design\Contract\ex-090915-Exhibit_A-Man-hour estimate -McHenry Watertower No. 3_cjp-REVISED.docx
I■
Department of Public Works
Jon M. Schmitt, Director
1415 Industrial Drive
McHenry, Illinois 60050
Phone: (815) 363-2186
Fax: (815) 363-2214
www.ci.mchenry.il.us
REGULAR AGENDA SUPPLEMENT
DATE: November 2, 2015
TO: Mayor and City Council
FROM: Jon M. Schmitt, Director of Public Works
RE: Curran Road (formerly Draper Road) S-Curve Safety Improvements Phase I
Engineering
ATT: IDOT Preliminary Engineering Services Agreement for Federal Participation;
IDOT Resolution for Improvement by Municipality under the Illinois Highway
Code
BACKGROUND: The Illinois Department of Transportation through the Highway Safety
Improvement Program (HSIP) was recently awarded $450,000 for the Curran Road (formerly
Draper Road) S-Curve Safety Improvements. The improvements on Curran Road from
approximately 400 feet south of Route 120 to Ojibwa Lane includes super -elevated pavement,
paved shoulder with rumble strips, ditch grading for recoverable slopes, pavement markings
and additional signage. HSIP funds pay for 90% of Phase I & II engineering, construction and
construction observation engineering. Motor Fuel Tax (MFT) revenues will be utilized for the
City's cost of the project. It is estimated that the contract documents will be prepared to meet a
2017 letting.
ANALYSIS: HR Green has submitted an engineering services agreement using the Illinois
Department of Transportation's required standard form. The scope of services include: project
coordination; data collection and review; survey services; preliminary design studies;
environmental studies; project development report; and meetings with city staff, Illinois
Department of Transportation (IDOT) and the Federal Highway Administration (FHWA) for an
amount not to exceed $29,990.27. The city's cost participation for Phase I engineering is
$2,999.03 funded by Motor Fuel Tax (MFT) revenues. IDOT has reviewed and approved the
IDOT Preliminary Engineering Services Agreement for Federal Participation with HR Green, Inc.
RECOMMENDATION: Therefore, if Council concurs, it is recommended to approve the IDOT
Preliminary Engineering Services Agreement for Federal Participation with HR Green, Inc. in an
amount not to exceed $29,990.27 for Phase I Engineering of Curran Road (formerly Draper
Road) S-Curve Safety Improvements and the IDOT Resolution for Improvement by Municipality
under the Illinois Highway Code.
The City of McHenry is
dedicated to providing the
citizens, businesses and visitors of
McHenry with the highest
quality
of programs and services in
acustomer-oriented, efficient and
fiscally responsible manner.
Local Agency Consultant
City of McHenry L [IGrlols Department HR Green, Inc
0 of Transportation C
County C 0 Address
McHenry A N 420 N Front Street
Section L S City
McHenry
Project No. A Preliminary Engineering L State
wwwwwwwwww Services Agreement IL
Job No. G For T zip Code
50
Contact Name/Phone/E-mail Address N Federal Participation N 600Contact Name/Phone/E-mail Address
Jon Schmitt C T Akram Chaudhry
815 363-2186 Y 815-759-8310
ischmittci.nwichenrwv.il.us achaudhr hr reen.com
THIS AGREEMENT is made and entered into Phis day of between the above
Local Agency (LA) and Consultant (ENGINEER) and covers certain professional engineering services in connection with the PROJECT.
Federal -aid funds allotted to the LA by the state of Illinois under the general supervision of the Illinois Department of Transportation
(STATE) will be used entirely or in part to finance engineering services as described under AGREEMENT PROVISIONS.
Project Description
Name Draper Road {CurranRoad) Route Length 0.75 mi Structure No. NA
Termini Curve South of IL 120 to Ojibwa Lane
Description Complete Phase t Engineering for safety related improvemen#s to Draper Road (Curran Roadj from south of tL 120 to Ojibwa
Lane in the City of McHenry.
regiment Provisions
!. TFfE ENGINEER AGREES,
1. To perform or be responsible for the performance, in accordance with STATE approved design standards and policies, of
engineering services for the LA for the proposed improvement herein described.
2. To attend any and all meetings and visit the site of the proposed improvement at any reasonable time when requested by
representatives of the LA or STATE.
3. To complete the services herein described within 200 calendar days from the date of the Notice to Proceed from the
LA, excluding from consideration periods of delay caused by circumstances beyond the control of the ENGINEER.
4. The classifications of the employees used in the work should be consistent with the employee classifications and estimated man-
hours shown in EXHIBIT A. !fhlgher-salaried personnel of the firm, including the Principal Engineer, perform services that are
indicated in Exhibit to be performed by losser-salaried personnel, the wage rate billed for such services shall be commensurate
with the payroll rate for the work performed.
5. That the ENGINEER is qualified technically and is entirety conversant with the design standards and policies applicable for the
PROJECT; and that the ENGINEER has sufficient properly trained, organized and experienced personnel to perform the services
enumerated herein.
6. That the ENGINEER shall be responsible for the accuracy of the work and shall promptly make necessary revisions or corrections
resulting from the ENGfNEER's errors, omissions or negligent acts without additional compensation. Acceptance o#worfor by the
STATE will not relieve the ENGINEER of khe responsibility to make subsequent correction of any such errors or omissions or for
clarification of any ambiguities.
7. That all plans and other documents furnished by the ENGINEER pursuant to this AGREEMENT will be endorsed by the ENGINEER
and will affix the ENGINEER's pro#essional seal when such seal is required bylaw. Plans for structures to be built as a part of the
improvemen# will be prepared under the supervision of a registered structural engineer and will affix structural engineer seal when
such seal is required bylaw. It will be the ENGINEER's responsibility to affix the proper seal as required by the Bureau of Local
Roads and Streets manual published by the STATE.
8. That the ENGINEER will comply with applicable federal statutes, state of Illinois statutes, and local laws or ordinances of the LA.
Page 1 of 7 BLR 05610 (Rev. 11/21113)
Printed on 9/26/2046 10:19:01 AM
It 9. The undersigned certifies neither the ENGINEER nor I have:
a. employed or retained for commission, percentage, brokerage, contingent we or other considerations, any firm or person (other
than a bona fide employee working solely for me or the above ENGINEER) to solicit or secure this AGREEMENT,
b. agreed, as an express or implied condition for obtaining this AGREEMENT, to employ or retain the services of any firm or
person in connection with carrying out the AGREEMENT or
c. paid, or agreed to pay any firm, organization or person (other than a bona fide employee working solely for me or the above
ENGINEER) any fee, contribution, donation or consideration of any kind for, or in connection with, procuring or carrying out the
AGREEMENT.
d, are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered
transactions by any Federal department or agency,
e. have not within a three-year period preceding the AGREEMENT been convicted of or had a civil judgment rendered against
them for commission of fraud or criminal offense in connection with obtaining, attempting to obtain or performing a public
(Federal, State or local) transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft,
forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property,
f, are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with
commission of any of the offenses enumerated in paragraph (e) and
g. have not within a three-year period preceding this AGREEMENT had one or more public transactions (Federal, State or local)
terminated for cause or default.
10_ To pay its subconsultants for satisfactory performance no later than 30 days from receipt of each payment from the LA.
11, To submit all invoices to the LA within one year of the completion of the work called for in this AGREEMENT or any subsequent
Amendment or Supplement.
12. To submit BLR 05613, Engineering Payment Report, to the STATE upon completion of the project (Exhibit B).
13. Scope of Services to be provided by the ENGINEER:
® Make such detailed surveys as are necessary for the planning and design of the PROJECT.
❑ Make stream and Flood plain hydraulic surveys and gather both existing bridge upstream and downstream high water data and
flood flow histories.
❑ Prepare applications for U.S. Army Corps of Engineers Permit, Illinois Department of Natural Resources Offrce of Water
Resources Permit and Illinois Environmental Protection Agency Sec#ion 404 Water Quality Certification.
❑ Design and/or approve cofferdams and superstructure shop drawings.
❑ Prepare Bridge Condition Report and Preliminary Bridge Design and Hydraulic Report, (including economic analysis of bridge or
culvert types and high water effec#s on roadway overflows and bridge approaches).
® Prepare the necessary environmental and planning documents including the Project Development Report, Environmental Class of
Action pe#ermination or Environmental Assessment, State Clearinghouse, Substate Clearinghouse and all necessary
environmental clearances.
❑ Make such soil surveys or subsurface investigations including borings and soil profiles as may be required to furnish sufficient data
for the design of the proposed improvement. Such investiga#ions #o be made in accordance with the current Standard
Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal -Aid
Procedures for Local Highway Improvements or any other applicable requirements of the STATE.
❑ Analyze and evacuate the sot) surveys and structure borings to determine the roadway structural design and bridge foundation.
® Prepare preliminary roadway and drainage structure plans and meet with representatives of the LA and STATE at the site of the
improvemen#for review of plans prior to the establishment of final vertical and horizontal alignment, location and size of drainage
structures, and compliance with applicable design requirements and policies.
❑ Make or cause to be made such traffic studies and counts and special intersection studies as may be required to furnish sufficient
data for the design of the proposed improvement.
❑ Complete the general and detailed plans, special provisions and estimate of cost. Contract plans shalt be prepared in accordance
with the guidelines contained in the Bureau of Local Roads and Streets manual. The special provisions and detailed estimate of
cost shall be furnished in quadruplicate.
❑ Furnish the LA with survey and drafts in quadruplicate all necessary right-of-way dedications, construction easements and borrow
pit and channel change agreements including prints of the corresponding plats and staking as required.
page 2 of 7 BLR 05s10 (Rev. 11121113)
Printed on 9/25/2Q15 1Q:19:Q1 AM
II. THE LA AGREES,
1. To furnish the ENGINEER all presently available survey data and information
2. To pay the ENGINEER as compensation for all services rendered in accordance with this AGREEMENT, on the basis of the
following compensation formulas:
Cast Plus Fixed Fee ® CPFF = 14.5°/a[DL + R(DL) + OH(DL) + IHDCj, or
❑ CPFF=14.5%[DL + R(DL) + 1.4(DL) + IHDC), or
❑ CPFF = 14.5%](23 + R)DL + IHDC]
Whore: DL =Direct Labor
IHDC = In House Direct Costs
OH = Consultant Firm's Actual Overhead Factor
R = Complexity Factor
Specific Ra#e ❑ (Pay per eEement)
Lump Sum ❑
3. To pay the ENGINEER using one of the following methods as required by 49 CFR part 26 and 605 ILCS 5/5-409:
❑ With Retainage
a) For the first 60% of completed work, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by
the LA, monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to
90% of the value of the partially completed work minus all previous partial payments made to the ENGINEER.
b) After 50% of the work is completed, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by
the LA, monthly payments covering work performed shall be due and payable to the ENGINEER, such payments to be equal to
95% of the value of the partially completed work minus all previous partial payments made to the ENGINEER.
c) Final Payment -- Upon approval of the work by the LA but not later than 60 days after the work is completed and reports have
been made and accepted by the LA and the STATE, a sum of money equal to the basic fee as determined in this
AGREEMENT less the total of the amounts of partial payments previously paid to the ENGINEER shall be due and payable to
the ENGINEER.
® Without Retainage
a) For progressive payments —Upon receipt of monthly invoices from the ENG]NEER and the approval thereof by the LA,
monthly payments for the work per€orrned shalt be due and payable to the ENGINEER, such payments to be equat to the value
of the partially completed work minus all previous partial payments made to the ENGINEER.
b) Final Payment — Upon approval of the work by the LA but not later than 60 days after the work is completed and reports have
been made and accepted by the LA and STATE, a sum o money equal to the basic fee as determined in this AGREEMENT
less the total of the amounts of partial payments previously paid to the ENGINEER shall he due and payable to the ENGINEER.
4. The recipient shall not discriminate on the basis of race, color, national origin or sox in the award and performance of any DOT -
assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26. The recipient shall take all
necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of DOT -assisted
contracts. The recipient's DBE program, as required by 49 CFR part 26 and as approved by DOT, is incorporated by reference in
this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as violation of
this agreement. Upon notification to the recipient of its failure to carry out its approved program, the Department may impose
sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or
the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et seq.).
III. IT IS MUTALLY AGREED,
That no work shall be commenced by the ENGINEER prior to issuance by the LA of a written Notice to Proceed.
2, That tracings, plans, specifications, estimates, maps and other documents prepared by the ENGINEER in accordance with this
AGREEMENT shall be delivered to and become the property of the LA and that basic survey notes, sketches, charts and other data
prepared or obtained in accordance wi#h this AGREEMENT shall be made available, upon request, to the LA or to the STATE,
without restriction or limitation as to their use.
Page 3 of 7 BLR 05610 {Rev.11l21113}
Printed on 9125J20i5 10:i9:01 AM
3. That all reports, plans, estimates and special provisions furnished by the ENGINEER shall be in accordance with the current
Standard Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal -Aid
Procedures for Local Highway Improvements or any other applicable requirements of the STATE, it being understood that all such
furnished documents shall be approved by the LA and the STATE before final acceptance. During the performance of the
engineering services herein provided for, the ENGINEER shall be responsible for any loss or damage to the documents herein
enumerated while they are in the ENGINEER's possession and any such loss or damage shall be restored at the ENGINEER's
expense.
4. That none of the services to be furnished by the ENGINEER shall be sublet, assigned or transferred to any other party or parties
without written consent of the LA, The consent to sublet, assign or otherwise transfer any portion of the services to be furnished by
the ENGINEER shall not be construed to relieve the ENGINEER of any responsibility for the fulfillment of this agreement.
5. To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to
verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all
books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and
the STATE; and to provide full access to all relevant materials. Failure to maintain the books, records and supporting documents
required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under
the contract for which adequate books, records and supporting documentation are not available to support their purported
disbursement.
&. The payment by the LA in accordance with numbered paragraph 3 of Sec#ion II will be considered payment in full for all services
rendered in accordance with this AGREEMENT whether or not they be actually enumerated in this AGREEMENT.
7. That the ENGINEER shall be responsible for any and all damages io property or persons arising out of an error, omission andlor
negligent act in the prosecution of the ENGINEER's work and shall Indemnify and save harmless the LA, the STATE, and their
officers, agents and employees from all suits, claims, actions or damages of any nature whatsoever resulting there from. These
indemnitios shall not be limited by the listing of any insurance policy.
8. This AGREEMENT may be terminated by the LA upon giving notice in writing to the ENGINEER at the ENGINEER's last known post
office address. upon such termination, the ENGINEER shall cause to be del!vered to the LA all drawings, plats, surveys, reports,
permits, agreements, soils and foundation analysis, provisions, specifications, partial and completed estimates and data, if any from
soil survey and subsurface investigation with the understanding that all such material becomes the property of the LA. The LA will be
responsible for reimbursement of all eligible expenses to date of the written notice of termination.
9. This certification is required by the Drug Free Workplace Act {301LCS 580). The Drug Free Workplace Act requires that no grantee
or contractor shall receive a grant or be considered far the purpose of being awarded a contract for the procurement of any property
or service from the State unless that grantee or contractor will provide a drug free workplace. False certification or violation of the
certification may result in sanctions including, but not limited to, suspension of contract or grant payments, termination of a contract or
grant and debarment of the contracting or grant opportunities with the State for at least one (1) year but no more than five (5) years,
For the purpose of this certification, "grantee" or "contractor means a corporation, partnership or other entity with twenty-five (25) or
more employees at the time of Issuing the grant, or a department, division or other unit thereof, directly responsible for the specific
performance under a contract or grant of $5,000 or more from the State, as defined in the Act.
The contractor/grantee certifies and agrees that it will provide a drug free workplace by:
a. Publishing a statement:
(1) Notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance,
including cannabis, is prohibited in the grantee's or contractor's workplace.
(2) Specifying the actions that will be taken against employees for violations of such prohibition.
(3) Notifying the employee that, as a condition of employment on such contract or grant, the employee will:
(a) abide by the terms of the statement; and
(b) notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five (5)
days after such conviction,
b. Establishing a drug free awareness program to inform employees about:
(1) The dangers of drug abuse in the workplace;
(2) The grantee's or contractor's policy of maintaining a drug free workplace;
(3) Any available drug counseling, rehabilitation and employee assistance program; and
(4) The penalties that may be imposed upon an employee for drug violations.
c. Providing a copy of the statement required by subparagraph (a) to each employee engaged in the performance of the contract or
grant and to post the statement in a prominent place in the workplace.
d. Notifying the contracting or granting agency within ten (10) days after receiving notice under part (8) of paragraph (3) of
subsection (a) above from an employee or otherwise receiving actual notice of such conviction.
e. Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program by,
f. Assisting employees in selecting a course of action in the event drug counseling, treatment and rehabilitation is required and
indicating that a trained referral team is in place.
g, Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act.
Page 4 of 7 13LR 05610 {Rev. 11121113)
Printed on 9/25/2015 10:15:01 AM
10. The ENGINEER or subconsultant shall not discriminate on the basis of race, color, national origin or sex in the performance of this
AGREEMENT. The ENGINEER shall carry out applicable requirements of 49 CFR part 26 in the administration of DOT assisted
contracts. Failure by the ENGINEER to carry out these requirements is a material breach of this AGREEMENT, which may result in
the termination of this AGREEMENT or such other remedy as the LA deems appropriate.
Agreement Summary
Prime Consultant:
TiN Number
AgreementAmount
HR Green, Inc.
1 42-0927178
1 $251590027
Sub -Consultants:
TiN Number
A reement Amount
Applied Ecological Services, Inc.
$4,400
Sub -Consultant Total:
$4,400
Prime Consultant Total:
$25,590427
Total
for all
Work:
$29,99027
Executed by the LA:
ATTEST:
By:
Clerk
(SEAL)
Executed by the ENGINEER:
ATTE"�
By:
Title:
By:
Title:
HR Green, Inc.
(Municipality/rotimship/County)
Page 5 of 7 BLR 05610 (Rev. 11l21/13)
Printed on 9/25/2015 10:19:01 AM
Exhibit A - Phase [ Engineering
Route: Curran Road
Local Agency: City of McHenry
Section: 15 00082-00-SP
Project:
Job No.
Method of Compensation:
Cost Plus Fixed Fee 1
®
14.5%[DL + R(DL) +
OH(DL) +IHDC]
Cost Plus Fixed Fee 2
❑
14.5%[DL + R(DL) +
1.4(DL) + IHDC]
Cost Plus Fixed Fee 3
❑
14.5%((2.3 + R)DL +
IHDC]
Specific Rate
❑
Lump Sum
❑
Cost Estimate of Consultants Services in Dollars
*Fitm's approved rates on file with IDO I s
Bureau of Accounting & Auditing:
Rafe {OH}
y FacYor (R)
Days
Element of Work
Employee
Classification
Man-
Hours
Payroll
Rate
Payroll
Costs (DL)
Overhead*
Services by
Others
In -House
Direct Costs
(IHDC)
Profit
Total
::......
Field Survey
48
$33.25
$1,596.00
$25553,60
$0.00
$13,44
$603,64
$44766.68
Preliminary Design Studies
See
90
$34A7
$3,102430
54,963.68
$164,70
$13.44
$1,171.52
$9,415,64
Location Drainage Stud)(
Exhibit B
16
$32.40
$518A0
$829644
$0,00
S0.00
$195,44
$1,543,28
Environmental Studies
12
S29.96
$359.52
$575.23
$4,400.00
S0.00
$135.54
$5,470.29
Project Development Report
44
$34,97
$1,538.68
$2.461.89
$108,00
$145.00
$601411
$41854.68
Meetings
18
$41.97
$755A6
S1.208.74
$0.00
$60,48
$293*58
$2,318.25
Project Administration
6
S44.31
S265.86
$425.36
$0.00
$0.00
$100.23
S791.47
QA/QC
5
$55.76
S278.80
$446.06
$0.00
$0.00
$105.11
$829,99
Totals
239
$8,415.02
$13 464.03
$4,672,70
$232.36
$3,206.15
529,990.27
Page 6 of 7
Printed on9l25l201510:07 AM BLR 05610 (Rev. 9/06)
Exhibit B
Illinois Department
I Transportation
Prune Consultant
Name HR Green, Inc.
Address 420 N Front St, McHenry
Telephone 815-385-1778
TIN Number 42-0927178
Project Information
Local Agency City of McHenry
Section Number 15-00082-00-SP
Project Number
Job Number
Engineering Payment Report
This form is to verify the amount paid to the Sub -consultant on the above captioned contract. Under penalty of law for
perjury or falsification, the undersigned certifies that work was executed by the Stlb-consultant for the amount listed below.
Sub -Consultant Name
TIN Number
Actual Payment
from Prime
Applied Ecological Services, Inc.
Sub -Consultant Total:
Prime Consultant Total:
Total for all Work
Completed:
Signature and title of Prime Consultant Date
Note: The Department of Transportation is requesting disclosure of information that is necessary to accomplish the statutory
purpose as outlined under state and federal law. Disclosure of this information is REQUIRED and shall be deemed as
concurring with the payment amount specified above.
For Information about IDOTs collection and use of confidential information review the department's Identity Protection Policy.
Page 7 of 7 BLR 05610 (Rev. 11/21/13)
Printed on fl/25/201510:19:01 AM
Exhibit 13 -Phase 1 Engineering
section
Consultant HR Green Inc.
�131IDe�
Average Hourly Project Rates
Date 09l12/15
Sheet 1 OF 2
Payroll
Classification
Avg
Hourly
Rates
Total Project Rates
Fio1d Survey
Preliminary Design Studios
Location Drainage Study
Environmontal Studies
Project Development Report
Hours
%
ParL
Wgtd
Avg
Hours
%
ParL
Wgtd
Avg
Hours
%
Part
Wgtd
Avg
Hours
%
Part.
Wgtd
Avg
Hours
%
Par.
Wgtd
Avg
Hours
%
Part.
Wgtd
Avg
Senior Project Manager
$65,40
17
7A 1 %
4.65
2
4,17%
2.72
0
2
12.50%
817
0
2
4,55%
2.97
Project Engineer II
$41,$1
69
28.87%
11.93
0
40
44.44%
18.36
0
2
16467%
6.89
18
40.91 %
16,90
Staff Engineer 1
$27.69
89
37.24%
10.31
0
41
45.56%
12,61
14
87.50%
24.23
1 10
83.33%
23.08
24
54.55%
15.10
Senior Design Tech
$35.00
9
3.77%
1.32
m 0
9
10,00%
3,50
0
0
0
Land Surveyor 1
$34A 5
8
3.35%
1.14
8
16.67%
5.69
0
0
Q
0
Staff Land Surveyor 11
$31.38
38
15.90%
4.99
38
79A7%
24.84
0
0
0
0
Admin Assistant 11
$23.23
9
3,77%
0.87
0
0
0
0
0
TOTALS
239
100%
$35.21
48
100%
$33.25
90
1000/0
$34.47
16
100%
$32A0
12
100%
S29.96
44
100%
$34,97
Route
Exhibit 6 •Phase 1 Engineering
Consultant HR Crreen, Inc.
Average Hourly Project Rates
Date 09/12l15
Sheek
OF 2
Payroll
Classification
Avg
Hourly
Rates
Mootings
Projoct Administration
QAIQC
Hours
%
Part
Wgtd
Avg
Hours
%
Part.
Wgtd
Avg
Hours
%
Part
Wgtd
Avg
Hours
%
Part
Wgtd
Avc7
Hours
%
Part
Wgtd
Avg
Hours
%
Part.
Wgtd
Avg
Senior Project
Manager
$65.40
5
27.78%
18.17
3
50.00%
32.70
3
60.00%
3924
Project En ineer II
$41.31
7
38.89%0
16,07
1 0
2
40.00%
16.52
Staff Engineer I
$27.69
0
0
0
Senior Design Tech
$35.00
0
0
0
Land Surve or 1
$34A5
0
0
0
Staff Land Surve or it
$3t$e
0
0
0
Admin Assistant 11
$23.23
6
33.33%
7.74
3
50.00%a
11.61
0
TOTALS
18
100%
$41.97
6
100%
$44.31
5
100%
$55.76
0
0%
$0.00
0
0%
$0.00
0
0%
$0.00
PHASE I ENGINEERING
QIRECT COSTS AND SERVICES BY OTHERS
CURRAN ROAD
Field Survey
In -House Direct Costs
Mileage
2 trips x 12 miles x $0.560 per day = $13.44
Sub -Total $1144
Preliminary Design Studies
In -House Direct Costs
Field Checks
2 trips x 12 miles x $0,560 per day = $13,44
Sub -Total $1144
Services by Others
Design Exhibits
Exhibits to City - Bond Copies 22" x 34"
4 sheets x 2 copy(ies) x $2470 per sheet = $21 a60
Cross Sections 11"x17"
5 sheets x 2 copy(ies) x $1.35 per sheet = $1150
Miscellanous Exhibits 22" x 34"
16 sheets x 1 copy(ies) x $2470 per sheet = $43420
Plans to Utilites
4 sheets x 8 copy(ies) x $2470 per sheet = $86.40
Sub -Total $164.70
Environmental Studies
Services by Others
AES - Wetland Delinations and Report
Sub -Total
Project Development Report
]n-House Direct Costs
PDR Report - Draft to City (2)
40 sheets x 2 copy(ies) x $0.15 per sheet =
PDR Report - Prefinal to IDOT (2) and City (2)
80 sheets x 4 copy(ies) x $0615 per sheet =
PDR Report - Final to IDOT (2) and City (2)
75 sheets x 4 copy(ies) x $0.15 per sheet =
Postage - UPS
4 Package(s) x $10.00 per package
Sub-Totat
Services by Others
PDR Exhibits - Draft to Cify (2)
4 sheets x 2 copy(ies) x
PDR Exhibits - Prefinal to [DOT (2), City (2)
4 sheets x 4 copy(ies) x
PDR Exhibits - Final to ]DOT (2), City (2) 22"x34"
4 sheets x 4 copy(ies) x
22" x 34"
$2.70 per sheet =
$2.70 per sheet =
$4,400.00
$4,400.00
$12.00
$48.00
$45A0
$40.00
$145.00
$43.20
$2.70 per sheet = $43,20
Sub -Total $108.00
PHASE I ENGINEERING
QIRECT COSTS AND SERVICES BY OTHERS
CURRAN ROAD
Meetings:
In -House Direct Costs
Meeting with City
i trips x $ miles x
Meeting with IDOT
2 trips x 50 miles x
Total In -House Direct Costs
Total Services by Others
�0.560 per day =
$0.560 per day
Sub -Total
ota
$4.4$
$56.00
$60.48
$232,36
4.67210
scOPE Or 0E1V V
CITY OF MCHENRY
DRAPER RAOD (CURRAN ROAD) - HSIP PROJECT
PHASE I
Tlae City= of AlcHexuS= (C1T�� intends to undertake a Phase I Study to impro�=e Draper Road
(Curran Road) froth the curve south of Illinois Route 120 to Ojibwa Lane. The City has obtained
fcdcral funding to snake safety related improvements to the roadway. The scope of work is
anticipated to include resurfacing to improve the cross slope of the roadway, installation of safety
shoulders, unproved signing and minor drainage improvements.
Since the City will be utilizing federal funding, the l}rojeet will be processed through IDOT
I3ureau of Local Roads and requires a Phase I Project Development Report (PDR) to be
prepared. The Phase I engineering will be funded with Fcdcral and City funds.
HR Green, Inc. (COA�PAN�� will prepare a Phase I Study and Design Report for the proposed
improvements of Curran Road. T'he Phase I Study and Report will be prepared to Federal
Standards. It has been assumed that this project will be processed as a Categorical Exclusion
Group I with report.
A. Early Coordination
1. Coordinate and schedule akick-off meeting with City=,and IDO'I` Local Roads.
2. Subnut an Environmental Survey Request per IDOT's latest requirements
(Project limits and geometry must be shown on an aerial).
B. Data Collection and Review
L Prepare aerial mosaics of the project limits to be used for exhibits and presentations.
'I'he latest ItIcHenry=County aerials will be utilized.
2. Coordinate with utility companies to obtain maps of utilities within the project
limits and place this information on a CARD base map.
3. Request existing roadway and utility plans from the City (where available).
4. Accident data from the last five complete years will be requested from the City for
the improvement limits.
5. Analysis will determine if it is a high Accident Locations (I IAL) or wet cluster site.
Collision diagrams will be provided. A summary of the accident analysis will be
provided including corrective measures and recommendations to address safety
related conditions.
city of McHenry
HSIP Project
Phasc I Engineering
September 15, 2015
Page 2
C. Sure=cy Seri=iccs
1. Topographic Su�7=c1= -Locate existing visible topogtapluc information for site
including information marked by J.U.I,.I.E. utility identification (as requested by
owner/client), parking facilities, roadways, and landscaping features. Underground
.municipal utilities (i.e., storm sewer, sanitary sewer, and water main) will be located
showing size, depth, and flow direction from observed cvidence at manholes, catch
basins, inlets, and valve vaults. A topographic map will be generated with a 1'
contour internal. Approximately 4,000' of topographic surrey along Curran Road
will be included. Limits of topographic survey will include a swath 10' beyond the
edge of pavement on both sides of the roadway. Trees larger than 6" will be located.
2. Horizontal and Vertical Control -Horizontal coordinates will be based on Illinois
State Plane Coordinates 1983 Datum (1997 Adjustment) and vertical elevations will
be established from NGS control rnonutnents. Two (2) benchmarks will be located
on the site and referenced on the survey.
3. Might of Wa5, Survey - CONIPANY willrecover existing right of xvay evidence for
approximately 4,000' of topographic survey along Curran Road, COADA Y will
calculate the existing right of way as shown on adjacent subdivision plats and
provided plat of dedication/right of way maps to include on the base map.
4. 'Topographic Survey Drawing - Final drafting product to be created using
MicroStation V& shoring existing features and 1' contours.
D. Preliminarg Design Studies
1. The existing alignment o£ Curran Road will be maintained.
2. A reiriew of the existing superelvation will be performed to determine if revisions
to the cross slopes are required.
3. The need for safety shoulders along the alignment will be evaluated. If necessar-ly,
small shoulders will be introduced all the curves.
4. The preliminary horizontal geometries will be developed and transposed an a 1"
50' aerial reap to deternne the impacts the improvement will hatye on the
surrounding properties.
5. The existing cross section includes one lane in each direction and an open
drainage system. 'The existing ditching will be revielved and proposed open ditch
system reestablished along the corridor.
6. Develop templated cross -sections for ROW and ditch analysis, every 100' and at
critical areas throughout the project corridor. Cross -sections to include
information regarding cross slopes, existing and proposed centerline elevations,
and existing rlglit-of-%vay.
7. Prepare the preferred plan and profile sheets for Curran Road (1" = 50' base
maps).
City of McHenry
HSIP Project
Phase I Engineering
September 15, 2015
Page 3
8. Prcliminarobable Costs will be developed for theimprovements.
I?, Tnvironmcntal Shldics
1. Prepare and submit an rnvironmcntal Sut�=cy Rcqucst (T SR) to 1DOT, This
subnuttal. will be for biological, cultural, historical presetvation and hazardous waste
screening.
2. 'i'here are wetlands along Curran Road. `1"he wcdand delineation and report will be
prepared in accordance with IDOTstandards. This work will be performed by our
environmental subconsultant, AIDS.
3. Special �1�astc —Initial screening for special waste will be completed in ordct• to
obtain design approval form IDOT, Actual testingwill perforted as part of Phase
Il engineering after the intersection design is complete and project lit -nits established.
F. Public Involvement
this project no public involvement/meetings 1vill be necessary.
U. Project Development Report
i. Prepare draft Project Development Report (I3LR 22I10) and report exhibits.
2. Preliminary Opinions of Probable Costs will be developed for the improvements.
3. Provide two (2) draft reports for City review.
4. Meet with City to review draft report.
54 Address preliminary report comments froin City and prepare final draft Project
Development Report for transmittal to IDOT.
6. Provide MOT four (4) draft reports for review and comment.
7. Address IDOT's preliminary report and prepare final Project Development
Report.
8. Pro/vide six (6) final Project Development Reports, four (4) to IDOT and two (2)
to City
II. Meetings
1. Tlus project will require meetings with Cit)�, IDOT', and FIIIVA to obtain
support and approval of the Phase I engineering. `i'he included meeting are:
a. Phase IKick-off at IDOT (1 meeting)
b. Progress Review with Citl=Staff (1 meeting};
c. FHWA Coordination (lmeeting);
d. Nleeting Specifications:
City of McHenry
HSIP Project
Phase I Engineering
September i 5, 2015
Page 4
COIvIP11N iT will hax e two {2) representatives at all meetings;
A maxi►num of four (4) hours per meeting have been allotted,
including travel time; and,
Meeting minutes, if required, -Mll be provided.
O,t46140773�Dr-:i�`,Conl�actU iS IP 4opx- tando.:
Illinois Department
of Transportation
Resolution for Improvement by
Municipality Under the Illinois
Highway Code
BE IT RESOLVED, by the CITY COUNCIL of the
Council or Rrasad-e t and Rnord of Trt lstpps
CITY of MCHENRY Illinois
City,- �
that the following described street(s) be improved under the Illinois Highway Code:
Name of Thorou hf
IRoute
IFrom
To
Draper Road (Curran Rd)
FAU 0084
Curve South of IL 120
Ojibwa Lane
BE IT FURTHER RESOLVED,
1. That the proposed improvement shall consist of Phase I Engineering for Draper Road for
safety related improvements that include cross slope improvements, safety shoulders, improved signage and
minor drainage improvements.
and be designated as Section
and shall be constructed variable
15-00082-00-SP
2. That there is hereby appropriated the (additional ®Yes ❑ No) sum of Two Thousand, Nine Hundred
ine Dollars and 03/1
wide
Dollars ( $2,999.03 )for the
improvement of said section from the municipality's allotment of Motor Fuel Tax funds.
3. That work shall be done by
Contract
and,
Specify Contract er-Bay-6abe�
BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to the
district office of the Department of Transportation.
Approved
Date
Department of Transportation
Regional Engineer
Clerk in and for the
City of McHenry
city, Fswr�er "'—:age
County of McHenry , hereby certify the
foregoing to be a true, perfect and complete copy of a resolution adopted
y the City Council
at a meeting on
Date
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this
day of
(SEAL)
BLR 09111 (Rev. 11/06)
HRGreen
Man -Hour Estimate
Curran Road HSIP —Phase I
Job Number: 86140379
Date: October 2015
Exhibit B
TASK
Personnel
MAN-
HOURS
LABOR COST
PHASE
Project Coordination, Meetings & QA/QC
Project Manager
11
$2,141669
Project Engineer
9
$1,106082
Admin.
9
$630071
Direct Costs
$60.48
Subtotal:
29
$3,939*70
Project Design Studies
Project Manager
2
$389.48
Project Engineer
107
$10,523679
Design Technician
9
$937480
Direct Costs (includes
Wetland Specialists)
$4,578014
Subtotal:
118
$16,429.21
Project Development Report
Project Manager
2
$389.48
Project Engineer
42
$4,212020
Direct Costs
$253000
Subtotal.
44
$4,854.68
Field Survey
Project Manager
2
$389648
Land Surveyor
46
$4,363076
Direct Costs
$13.44
Subtotal:
48
$4,766.68
Phase I TOTAL:
$29,99017
Based upon our understanding of the project detailed in this Contract, the above is a summary of man-
hoursand costs associated with the project.
Hrgmhnas\\O:\86140379\Design\Contract\ex-092515-Exhibit_A-Man-hour estimate-Phasel.docx
H
Derik Morefield, City Administrator
McHenry Municipal Center
333 Green Street
McHenry, Illinois 60050
Phone: (815) 363-2100
Fax: (815) 363-2119
dmorefield@ci.mchenry.il.us
CITY COUNCIL MEETING
AGENDA SUPPLEMENT
DATE: November 2, 2015
TO: Mayor and City Council
FROM: Derik Morefield, City Administrator
RE: Consideration of an Amendment to the FY15/16 Budget in the amount of
$29,000 for the establishment of a Director of Building and Neighborhood
Services
ATT: Job Description — Director of Building and Neighborhood Services
October 19, 2015 Finance & Personnel Committee Meeting Minutes
Prior to December 2014 Doug Martin, serving as Deputy City Administrator at the time,
provided oversight for the activities of the Department of Community and Economic
Development. In this role, Doug was charged with providing direction for all building inspection
and code compliance activities, planning and zoning processes, and business retention and
attraction (economic development) efforts.
With a strong desire to boost economic development efforts through the establishment of a
full-time staff person, in December 2014 Doug was given the title of Director of Economic
Development with a charge to focus 100% of his time on assisting existing businesses to remain
in McHenry and to bring new businesses to the community. Even in the relatively short
timeframe of the last 10 months since Doug's transition to this role, the effort has achieved
significant retention and attraction results. Examples include but are no means limited to: Big
R, Designer Shoe Warehouse (DSW), CVS Pharmacy, Black Diamond Plumbing and Mechanical,
Superior Felt (expansion), Dunkin Donuts, Door Service Inc. (DSI), and his unrelenting efforts at
working to maintain Fabrik in the community. In addition, Doug continues to expand economic
development awareness through the implementation of the McHenry Market Pulse blog, by
hosting regular networking events and open houses with real estate agents/brokers, and by
representing the City of McHenry throughout the region. Suffice it to say that this brief
The City of McHenry is dedicated to providing the citizens, businesses and visitors of McHenry with the highest
quality of programs and services In acustomer-oriented, efficient and fiscally responsible manner.
summary does not even begin to describe the efforts that Doug undertakes on a daily basis to
promote McHenry as business —friendly community.
When Doug's transition was made, the day-to-day oversight and direction for the building
inspection and code compliance functions of the Department of Community and Economic
Development were assumed by the City Administrator with an understanding that this would
be for an interim period of time. During the 10 month period that this situation has existed the
department has successfully completed the installation of the BS&A building inspection, code
compliance and project tracking software, and has dealt with an overwhelming number of
inspections due to the Spring 2015 hail storm event that resulted in hundreds of roof and siding
permits. However, due to the dayAo-day demands of the position of City Administrator in
handling multi -departmental and community -wide issues, what is needed moving forward is an
individual that can develop and implement strategies that solidify and expand the city's building
inspection and code compliance efforts. This need was verbalized by Mayor Low and affirmed
by consensus of the Finance & Personnel Committee at its July 20, 2015.
Based on this direction, the City Administration has reviewed job descriptions from a number of
communities and has developed a new draft job description for a Director of Building and
Neighborhood Services. A copy of this job description is attached. As envisioned, and
identified in the job description, this position would be responsible for directing daily building
inspection and code compliance efforts and, more importantly, working with staff, the City
Administrator and City Council, to develop specific goals and objectives in these areas and to be
able to regularly monitor building inspection and code compliance issues in a seamless manner.
Based on the City's wage and compensation matrix the pay range, based on qualifications, of
this position is between S82,284 and $120,131. It is highly likely that the hiring range be in the
lower 25% of this range ($82,284 - $91,746). It is estimated that benefits (IMRF and medical
insurance) would cost an additional approximate $35,000, for a total cost of between $117,000
and $127,000. Since funding for this position is not included in the FY15/16 Budget, a budget
amendment would be required to facilitate the recruitment and hiring of this position.
This matter was taken before the Finance and Personnel Committee for consideration .and
recommendation on October 191 2015 (minutes attached). During this meeting it was identified
that the timing for recruitment and hiring of this position should proceed prior to the beginning
of the FY16/17 Fiscal Year (May 1st) in order to bring someone on board in time to participate in
the 2016 building and code enforcement activity "season." Therefore, it is anticipated that
recruitment for this position can begin in mid -November with interviews in mid -to -late
December or early January and a start date of early February.
Therefore, if Council concurs with the recommendation of the Finance and Personnel
Committee, a motion should be made to amend the FY15/16 Budget in the amount of
$29,000 to allow for the recruitment and hiring of a Director of Building and Neighborhood
Services. This amount assumes a starting salary and benefits in the range of what has been
identified in this report and an estimated starting date of February 1, 2016. As such, the
budget amendment covers that period from February 1st through April 30t". The salary and
benefits beyond that time would be included in the proposed FY16/17 Budget.
Position Title:
Pay Grade:
Reports To:
City of McHenry
Position Description
Director of Building and
Neighborhood Services
City Administrator
Department/Division:
FLSA:
Building and Neighborhood
Services
Exempt
Purpose of Position
This position plans, coordinates, directs, and evaluates the daily operations of the Department of Building and
Neighborhood Services.
Duties include the review, development and implementation of proper building codes and code compliance ordinances
and the daily direction and supervision of commercial and residential building inspection and code enforcement activities.
The position also undertakes comprehensive studies and analyses of a wide range of municipal policies, programs,
organizational structures, procedures and services, assuming lead responsibility when assigned. Work is performed under
the administrative direction of the City Administrator,
Essential Duties and Responsibilities
The following duties are normal for this position. These are not to be construed as exclusive or all-inclusive.
Other duties may be required and assigned.
Ensures that various codes and ordinances relative to building inspection and code enforcement are regularly updated and
maintained for relevance.
Coordinates with the City Council, City Administrator, Department Directors, and Departmental Staff to develop and
implement a strategic plan for community -wide code enforcement activities.
Directs, supervises and prioritizes day-to-day activities of building inspection and code enforcement staff and contract
employees.
Provides oversight to the City's Administrative Adjudication Program.
Prepares and submits the annual Building and Neighborhood Services budget recommendations to the City
Administrator.
Receives and acts on resident complaints and information requests regarding building inspection and code enforcement
items and ensures that the City Administrator and City Council is continuously updated on these items.
Participates in staff meetings; discusses and reviews overall City problems and priorities, or directs projects having a
general citywide impact.
Serves as support and staff liaison to the Community Development Committee.
Maintains/fosters communication with residents, customers, other municipal departments and other organizations (such as
the McHenry Township Fire Protection District) to apply codes and ordinances relative to building inspection and code
in activities.
Coordinates closely with the Director of Economic Development to ensure that development review and approval
processes relating to commercial and industrial development are handled in the most streamlined and expeditious manner
possible.
Provides effective and efficient customer services and promotes and maintains responsive community relations.
Researches and identifies training opportunes for Bung and Neighborhood Services staff.
Manages efforts to identify and address distressed properties, collaborates with the City Attorneys office to develop an
action plan and follow through to resolution.
Performs special projects and assumes other duties as assigned by the City Administrator.
Minimum Education, Training and Experience Required to Perform Essential Job Functions
Bachelor's Degree in Construction Management, Business or Public Administration or related field; five years
progressively responsible related experience; or any combination of education and experience that provides equivalent
knowledge, skills and abilities
Thorough knowledge of government operations, general management, basic laws, principles, and regulations underlying
the municipal functions of city government.
Physical and Mental Abilities Required to Perform Essential Job Functions
Language Ability and Interpersonal Communication
Ability to decide the time, place and sequence of operations within an organizational framework, and to oversee their
execution. Ability to analyze and categorize data and information using established criteria, to determine consequences
and identify and select alternatives.
Ability to manage and direct a group of workers, including the ability to provide counseling and mediation. Ability to
persuade, convince and train others. Ability to advise and interpret regarding the application of policies, procedures and
standards to specific situations. Ability to provide formal instruction in a classroom or other structured setting.
Ability to utilize a variety of advisory and design data and information such as real estate listings, meeting agenda
materials, meeting minutes, architectural drawings, statistics, a variety of reports, marketing materials, press releases,
high-tech manuals, computer languages, accounting methods.
Ability to communicate orally and in writing with business representatives, developers, Boards, attorneys, city
department directors, development professionals, real estate agents and the general public.
Mathematical Ability
Ability to calculate percentages, fractions, decimals and ratios. Ability to interpret descriptive statistical data and reports.
Judgment and Situational Reasoning Ability
Ability to apply functional reasoning in synthesizing information and functions, and ability to influence others in
activities such as leading, controlling, managing, supervising and teaching.
Ability to exercise the judgment, decisiveness and creativity required in situations involving the direction, control and
planning of an entire program or multiple programs.
Ability to analyze complex public policy issues.
Ability to use automated data processing systems with a strong knowledge of computer software.
Physical Requirements
Ability to operate a variety of office equipment such as computer terminal, typewriter, telephone, fax machine,
calculator/adding machine and photocopier.
Ability to coordinate eyes, hands, feet and limbs in performing movements requiring moderate skill, such as typing.
Ability to exert light physical effort in sedentary to light work.
Environmental Adaptability
Ability to work under safe and comfortable conditions where exposure to adverse environmental factors is minimal and poses a
very limited risk of injury.
The City of McHenry is an Equal Opportunity Employer. In compliance with the Americans with Disabilities Act, the City will provide
reasonable accommodations to qualified individuals with disabilities and encourages both prospective and current employees to discuss
potential accommodations with the employer.
Building Neighborhood Services Director Date Human Resources Manager
City Administrator
Date
FINANCE AND PERSONNEL COMMITTEE
Monday, October 19, 2015
Council Chambers, 5:30 PM
In Attendance: Committee Members: Chairman Richard Wimmer, Alderman Condon,
Alderman Curry. Absent: None. Also in Attendance: Deputy City Administrator Hobson,
Finance Director Lynch; Executive Assistant/Deputy Clerk Geraghty. Public in Attendance:
Emily Coleman representing the Northwest Herald newspaper.
Chairman Alderman Wimmer called the meeting to order at 5:30 PM.
PUBLIC INPUT
None.
TRANSMITTAL OF CALENDAR FOR PREPARATION OF THE FYl6/17-FY20/21
CAPITAL IMPROVEMENT PROGRAM (CIP) AND FY16/17 BUDGET
City Administrator Morefield identified the schedule for preparation of the FY 16/17-FY 20/21
CIP program and provided the committee with an overview and purpose of developing a CIP.
Alderman Curry requested the Draft FY 16/17 CIP be transmitted to the Committee prior to
December 30t1i After a brief discussion, the committee agreed to revise the timetable and
schedule the review by the Committee on January 11th instead of January 4thproviding more time
for the Committee to review the information.
Alderman V. Santi joined the meeting at 5:50 PM.
City Administrator Morefield informed the Committee development of the annual operating
budget commences at the beginning of each calendar year. The FY 16/17 Budget will include
several new elements and recommendations including but not limited to the implementation of a
new budget for the Recreation Center; development of a separate budget for Human Resources;
staffing needs in the areas of public works/engineering, administrative support, and police; and
an expansion of capital expenditures in the areas of local streets and public facilities to
accommodate dispatch consolidation efforts.
The draft FY 16/17 Budget Development and Adoption Schedule was reviewed by the
Committee. Alderman Condon noted she will not be available on March 16th for the proposed
Special Meeting of the Finance & Personnel Committee to review the draft budget. After a brief
discussion, the meeting was moved to March 23ra
DISCUSSION AND DIRECTION REGARDING THE 2015 PROPERTY TAX LEVY
City Administrator reported the financial position of the city has improved dramatically with the
increase in sales and income taxes above what was predicted along with the ability to control
expenses. However, the city has always levied taxes for the required contribution to the Police
Pension Fund, which continues to increase, and means the general fund portion of the tax levy
has been forced to decrease since taxes have not been raised. The 2015 required levy amount for
Police Pension Fund is $1,524,244; an increase of $136,870 over last year. The corporate
portion of the levy was reduced by $91,797 in 2014 to fund the police pension contribution. It is
expected that the required contribution will continue to rise due to increasing retirements,
salaries, and changing actuarial regulations.
Finance and Personnel Conunittee
October 19, 2015
Page 2
City Administrator Morefield informed the Committee that the Tax Levy Resolution will be
before the Council on November 16th at which time the Council will be asked to establish the
annual Public Hearing for December 7th. Staff is seeking direction from the Committee on the
amount of the property tax extension that should be presented to the full City Council on
November 16th
The Committee was in consensus to direct staff to present the tax levy before the full City
Council for consideration on November 16th with a proposed December 7t" date for the annual
Public Hearing.
CONSIDERATION AND RECOMMENDATION OF AN AMENDMENT TO THE FY
15/16 BUDGET FOR THE ESTABLISHMENT OF A DIRECTOR OF BUILDING AND
NEIGHBORHOOD SERVICES
City Administrator Morefield provided background on the history of the Community and
Economic Development Director position, which was most recently held by Doug Martin until
10 months ago when the day-to-day oversight and direction for building inspection and code
compliance functions were assumed by the City Administrator with an understanding that this
would be for an interim period of time. Reinstating the Director position in the Conummity &
Development Department was identified as a topic for future consideration at the July 20th
Finance and Personnel Committee meeting.
City Administrator Morefield referenced the job description included in the meeting packet for
the proposed position of Director of Building and Neighborhood Services prepared by Human
Resources Manager Campanella.
After brief discussion it was the consensus of the Committee to forward the job description and
recommendation to amend the FY15/16 Budget in the amount of $127,000 to the full City
Council for consideration on November 2" d
ADJOURNMENT
Motion by Condon, seconded by Cuny to adjourn the meeting at 6:40 PM.
Ave:
Nay:
Motion carried.
CondonCurryWimmer
Respectfully submitted,
Alderman Richard Wimm�f',
Office of Finance & Accounting
Carolyn Lynch, Director
McHenry Municipal Center
333 Green Street
McHenry, Illinois 60050
Phone: (815) 363-2100
Fax: (815) 363-2119
www.ci.mchenry.il.us
REGULAR AGENDA SUPPLEMENT
DATE: November 2"d, 2015
TO: Mayor and City Council
FROM: Carolyn Lynch, Finance Director
RE: 2014/15 Annual Police Pension Fund Report
ATT: Police Pension Fund report, balance sheet, and actuarial report
BACKGROUND: The Illinois Department of Insurance requires that the City Council approve an annual
report for the Police Pension Fund. This report lists important information that can also be found in the
actuarial report.
ANALYSIS: The annual Police Pension Fund report, balance sheet, and actuarial report for the 2014/15
fiscal year is attached. This report lists the 2014/15 total fund assets and investment income for the fund
as well as estimated receipts for 2015/16 fiscal year. The levy requirement for FY2016/17 is also listed
on this report as $1,524,244. It is important for the City to continue to fund at the required level because
funding has fallen behind in the past, which has left the percent funded low at 52.9%. Staff has notified
the Police Pension Board, per Council direction, that the City will continue to meet the actuarial required
contribution going forward.
RECOMMENDATION: Staff `recommends consideration and approval of the attached Police Pension
Fund annual report for fiscal year 2014/15a
City of McHenry Pension Fund
Annual Report for Fiscal Year Ending April 30, 2015
The following information is provided to the Board of Trustees of the City of McHenry by the City of McHenry
Pension Board in accordance with the requirements set forth in 40 ILCS 5/3443.
Fund Assets
Total Assets for the Fund 21,151,953.00
Current Market Value of the Fund 211151,953000
End of Year Balance Sheet Attached
Yes
No (Explain)
N
Declaration of Receipts
Estimated Receipts for Next Fiscal Year
from Payroll Withholdings
$ 387,000.00
Estimated Receipts from Other Sources $ 2,200,000.00
Description of Other Sources
Investment Income, employer contributions
Investment Income
Fiscal Year Ending
4/30/2015
Fiscal Year Ending
4/30/2014
Net Investment Income
11101,915
Net Investment Income
11779,216
Assumed Investment Return
7.5%
Assumed Investment Return
7.5%
Actual Investment Return
5.46%
Actual Investment Return
9.59%
Comments
Comments
Employee/Annuitant Information
Number of Active Employees Paying into Fund 45
Amount Disbursed as Benefits During Fiscal Year
Refunds
112,515.00
IDisability
243,261.00
Retirement
1,425,485.00
Isurvivors
87,495.00
Total of All Benefits Disbursed During
Fiscal Year 1,868,756.00
Pension Fund Financial Status
Total Unfunded Liability (Actuarial Attached) 181927,134
Funded Ratio
52.90%
Pension Funding Requirement
11524,244400
In accordance with the provisions of
that the statements contained in the
the Pension
the Illinois Pension Act, 40 ILCS 5/3443 the Pension Fund hereby certifies
annual report are a true and accurate description of the fiscal condition of
Fund as of the end of the most recent fiscal year.
Pension 5iA resident (Signature
McHenry, IL
Balance Sheet
Account Summary
As Of 04/30/2015
Account
Name
Balance
Fund: 760 - POLICE PENSION FUND
Assets
760-1000
CASH IN BANK
21472,12
760-1100
INVESTMENTS -CERTIFICATES OF DEPO
0.00
760-1104
INVESTMENTS-AMERICAN FUNDS (LPL)
8,434,536.35
760-1109
FMV-AMERICAN FUNDS
3,586,339.44
760-1123
LASALLE TRUST ACCOUNT
9,271,512.98
760-1125
LASALLE TRUST - FMV
-264,838.67
760-1150
PROPERTY TAXES RECEIVABLE
0.00
760-1260
ACCRUED INTEREST RECEIVABLE
121,930.45
760-1551
DUE FROM GENERAL FUND
0.00
760-1990
CASH IN POOL
0.00
Total Assets:
21,151,952.67
Liability
760-2000
WITH HOLDI NG-FEDERAL TAXES
0.00
760-2100
ACCOUNTS PAYABLE
0.00
760-2230
WITHHOLDING -INSURANCE
0.00
760-2331
WAGES PAYABLE
0.00
760-2350
DUE TO GENERAL FUND
0.00
760-2420
DUE TO EMPLOYEE INSURANCE FUND
0.00
760-2440
DUE TO AUDIT FUND
0.00
760-2500
FUND BALANCE
20,279,175.31
760-2530
DEFERRED REVENUE
0.00
Total Liability:
2%279,175.31
Equity
Total Beginning Equity: 0.00
Total Revenue 2,778,378.79
Total Expense 1,905,601.43
Revenues Over/Under Expenses 872,777.36
Total Equity and Current Surplus (Deficit): 872,777.36
21,151,952.67
Total Liabilities, Equity and Current Surplus (Deficit): 21,151,952.67
10/12/2015 3:17:31 PM Page 1 of 1
Actuary
CITY OF MCHENRY
MCHENRY POLICE PENSION FUND
Actuarial Valuation Report
For the Year
Beginning May 1, 2015
And Ending Apri130, 2016
Timothy W. Sharpe, Actuary, Geneva, IL (630) 262-0600
TABLE OF CONTENTS
Paae
Introduction 3
Summary of Results 4
Actuarial Valuation of Assets 6
Asset Changes During Prior Year 7
Normal Cost 8
Accrued Liability 9
Tax Levy Requirement 10
Summary of Plan Participants 11
Duration 12
Projected Pension Payments 12
Summary of Plan Provisions 13
Actuarial Method 14
Actuarial Assumptions 15
GASB Statements No. 25 & 27 Disclosure 17
GASB Statements No. 67 & 68 Disclosure 20
INTRODUCTION
Police -sworn personnel of the City of McHenry are covered by the Police Pension an that is a
defined -benefit, single -employer pension plan. The purpose of this report is to provide to the
Intended Users of this report, specifically the Intended Users are the City Officials, the Pension
Board and the City and Pension Board auditors, the reporting requirements of the Illinois Pension
Code, the GASB Statements No. 25 & 27 and 67 & 68 financial information and related actuarial
information for the year stated in this report. This report is not intended for distribution or usage
to or by anyone who is not an Intended User and should not be used for any other purpose.
The valuation results reported herein are based on the employee data, plan provisions and the
financial data provided by the City. The actuary has relied on this information and does not
assume responsibility for the accuracy or completeness of this information. I hereby certify that
to the best of my knowledge this report is complete and accurate and fairly presents the actuarial
position of the Fund in accordance with generally accepted actuarial principles and procedures.
In my opinion, the assumptions used are reasonably related to the experience of the Plan and to
reasonable expectations. A reasonable request for supplementary information not included in
this report should be directed to the undersigned actuary.
The actuary cautions the Intended Users of the possibility of uncertainty or risks in any of the
results in this report.
I, Timothy W. Sharpe, am an Enrolled Actuary and a member of the American Academy of
Actuaries, and I meet the Qualifications Standards of the American Academy of Actuaries to
render the actuarial opinion contained herein.
Respectfully submitted,
Timothy W. Sharpe, EA, MAAA
Enrolled Actuary No. 14-4384
8/20/2015
Date
-3-
SUMMARY OF RESULTS
There was a change with respect to Actuarial Assumptions from the prior year to reflect revised
expectations with respect to mortality rates, disability rates, turnover rates and retirement rates.
The mortality rates, disability rates, turnover rates and retirement rates have been changed to the
new rates most recently published by the Illinois Department of Insurance (September 2012).
There were no changes with respect to Plan Provisions or Actuarial Methods from the prior year.
Based on the plan sponsor's funding policy and future expected plan contributions and funded
status, the plan is to be expected to produce adequate assets to make benefit payments when they
are due.
The benefit payment default risk or the financial health of the plan sponsor was not deemed to be
material.
Future actuarial measurements may differ significantly from the current measurements presented
in this report due to such factors as the following: plan experience differing from that anticipated
by the economic or demographic assumptions; changes in economic or demographic
assumptions; increases or decreases expected as part of the natural operation of the methodology
used for these measurements (such as the end of an amortization period or additional cost or
contribution requirements based on the plan's funded status); and changes in plan provisions or
applicable law.
Due to the limited scope of the actuary's assignment, the actuary did not perform an analysis of
the potential range of such future measurements.
There were no unexpected changes with respect to the participants included in this actuarial
valuation (2 new members, 2 terminations, 1 retirement, 0 incidents of disability, annual payroll
increase .0.1%, average salary increase 3.7%).
There were no unexpected changes with respect to the Fund's investments from the prior year
(annual investment return 5.46%).
The City's Tax Levy Requirement has increased from $1,387,374last year to $1,524,244 this
year (9.9%). The increase in the Tax Levy is due to the increase in average salaries, the
investment return was less than assumed and the changes to the assumptions. The Percent
Funded has increased slightly from 52.5% last year to 52.9% this year.
-4-
SUMMARY OF RESULTS (Continued)
For Year Ending
April 30
2016 2015
Tax Levy Requirement $ 1,5249244 $ 15387,374
as of
May 1
2015 2014
City Normal Cost 5069389 439,525
Anticipated Employee Contributions 375,734 375,967
Accrued Liability 4052269092 38,323,678
Actuarial Value of Assets 21,298,958 20,129,629
Unfunded Accrued Liability/(Surplus) 18,927,134 18,194,049
Amortization of Unfunded 911,512 851,055
Accrued Liability/(Surplus)
Percent Funded 52.9% 52.5%
Annual Payroll $ 3,791,467 $ 3,793,817
TAX LEVY REQUIREMENT
as of April 30
$2,000
a
c
$1,000
0
r
~
$500
$0
-5-
ACTUARIAL VALUATION OF ASSETS
as of
May 1
2015 2014
Money Market, NOW, lI, Fund $ 27472 $ 187,339
Government Securities 9,006,674 8,922,028
Mutual Funds 12,020,876 11,036,166
Interest Receivable 121,930 137,263
Miscellaneous Receivable/(Payable) 0 3( ,621)
Market Value of Assets 21� �4��:�
Actuarial Value of Assets $ 21,298,958 $ 20,129,629
FYE 2012-2015 (Gain)/Loss: $836,782; ($289,987); ($387,833; $410,430
SUMMARY OF ASSETS
As Of May 1, 2075
Money Market, NOW, IL Fund
Government Securities
❑ Mutual Funds
-6-
ASSET CHANGES DURING PRIOR YEAR
Trust Balance as of May 1, 2014 $ 205279,175
Contributions
City 11295,101
Employee 381363
Total 1,6765464
Payments
Benefit Payments 15868,756
Expenses 36,846
Total 11905,601
Investment Income 1,101,915
Trust Balance as of May 1, 2015 $ 21.151.953
Approximate Annual Rate of Return 5.46%
ASSET CHANGES DURING PRIOR YEAR
Trust Balance as of May 1, 2014
Contributions
Payments
❑ Investment Income
Trust Balance as of May 1, 2015
-7-
NORMAL COST
The Normal Cost is the actuarial present value of the portion of the projected benefits that are
expected to accrue during the year based upon the actuarial valuation method and actuarial
assumptions employed in the valuation.
Total Normal Cost
Anticipated Employee Contributions
City Normal Cost
Normal Cost Payroll
City Normal Cost Rate
Total Normal Cost Rate
NORMAL COST
As Of May 1, 2015
s7.4 %
42.6
0
0
-8-
as of
May 1
2015 2014
882,123 $ 8159492
375,734 375.967
3,791,467 $ 3,793,817
13.36% 11.59%
23.27% 21.50%
Anticipated Employee Contributions
City Normal Cost
ACCRUED LIABILITY
The Accrued Liability is the actuarial present value %J the portion of the projected benefits that
has been accrued as of the valuation date based upon the actuarial valuation method and actuarial
assumptions employed in the valuation. The Unfunded Accrued Liability is the excess of the
Accrued Liability over the Actuarial Value of Assets.
as of
May 1
Accrued Liability 2015 2014
Active Employees $ 17,815,791 $ 16,191,557
Children Annuities 0 0
Disability Annuities 37418,099 4,055,920
Retirement Annuities 17,7731489 1756425821
Surviving Spouse Annuities 1,046,083 3219776
Terminated Vested Annuities 1725630 111,604
Total Annuities 221410,301 221132,121
Total Accrued Liability 40,226,092 38,323,678
Actuarial Value of Assets 21,298,958 20.129,629
Unfunded Accrued Liability/(Surplus) $ 18.92�7.134 $ 18.194.049
Percent Funded 52.9% 52.5%
ACCRUED LIABILITY
As Of May 1, 2015
-9-
Total Accrued Liability
Actuarial Value of Assets
Unfunded Accrued Liabilityl(Surplus)
TAX LEVY REQUIREMENT
The Public Act 096-1495 Tax Levy Requirement is determined as the annual contribution
necessary to fund the normal cost, plus the amount to amortize the excess (if any) of ninety
percent (90%) of the accrued liability over the actuarial value of assets as a level percentage of
payroll over a thirty Q0) year period which commenced in 2011, plus an adjustment for interest.
The 100% amortization amount is equal to the amount to amortize the unfunded accrued liability
as a level percentage of payroll over a thirty (30) year period which commenced in 2011.
City Normal Cost as of Beginning of Year
Amortization of Unfunded
Accrued Liability/(Surplus)
Interest for One Year
Tax Levy Requirement as of End of Year
Public Act 096-1495 Tax Levy Requirement
1) Normal Cost (PUC)
2) Accrued Liability (PUC)
3) Amortization Payment
4) Interest for One Year
5) PA 0964495 Tax Levy Requirement
(1+3+4)
For Year Ending
April 30
2016
$ 506,389
911,512
106,343
$ 1.524,244
588,226
38,456,940
6417106
92,200
$ 1,321,532
-10-
2015
4391525
851,055
96,794
1 38. 7.374
551,286
35,621,375
558,026
83,198
1,192,510
SUMMARY OF PLAN PARTICIPANTS
The actuarial valuation of the Plan is based upon the employee data furnished by the City. The
information provided for Active participants included:
Name
Sex
Date of Birth
Date of Hire
Compensation
Employee Contributions
The information provided for Inactive participants included:
Name
Sex
Date of Birth
Date of Pension Commencement
Monthly Pension Benefit
Form of Payment
Membership 2015 2015 2014 2014
Current Employees
Vested 31 32
Nonvested 14 14
Total 41 4L
Inactive Participants Annual Benefits Annual Benefits
Children 0 $ 0 0 $ 0
Disabled Employees 6 245,088 7 2801209
Retired Employees 21 1,425,665 21 1401,884
Surviving Spouses 3 115,606 2 485140
Terminated Vesteds 2 38,973 1 18,533
Total 32 ilZaMU 3 1.748.766
Annual Payroll $ 3,791,467 $ 3,793,817
-11-
SUMMARY OF PLAN PARTICIPANTS (Continued)
Service
Age
20-24
25-29
30-34
35-39
40-44
45-49
50-54
55-59
60+
Total
Salary
Age and Service Distribution
0-4 5-9
1
3
3 6
3
1
7
3
3
4
5
2
1
1
1
1
635050 80,619 863517 929237 94,493 104,855
Average Age: 37.4 Average Service: 11.4
30+ Total Salary
1 55,639
3 61,403
10 77,256
14 86,867
9 92,133
7 91,318
1 94,493
DURATION (years) Active Members: 20.9 Retired Members: 9.8 All Members: 14.7
PROJECTED PENSION PAYMENTS
2016 2017 2018 2019 2020
$1,8479779 $1,858,821 $1,953,167 $2,0231913 $25109,273
PROJECTED PENSION PAYMENTS
2016-2020
$z,soo
$2,000
$1,500
L
$1,000
F-
$500
$0
-12-
2020
SUMMARY OF PLAN PROVISIONS
The Plan Provisions have not been changed from the prior year.
The City of McHenry Police Pension Fund was created and is administered as prescribed by
"Article 3. Police Pension Fund - Municipalities 500,000 and Under" of the Illinois Pension
Code (Illinois Compiled Statutes, 1992, Chapter 40). A brief summary of the plan provisions is
provided below.
Employees attaining the age of (50) or more with (20) or more years of creditable service are
entitled to receive an annual retirement benefit of (2.5%) of final salary for each year of service
up to (30) years, to a maximum of (75%) of such salary.
Employees with at least (8) years but less than (20) years of credited service may retire at or after
age (60) and receive a reduced benefit of (2.5%) of final salary for each year of service.
Surviving spouses receive (100%) of final salary for fatalities resulting from an act of duty, or
otherwise the greater of (50%) of final salary or the employee's retirement benefit.
Employees disabled in the line of duty receive (65%) of final salary.
The monthly pension of a covered employee who retired with (20) or more years of service after
January 1, 1977, shall be increased annually, following the first anniversary date of retirement
and be paid upon reaching the age of at least (55) years, by (3%) of the originally granted
pension. Beginning with increases granted on or after July 1, 1993, the second and subsequent
automatic annual increases shall be calculated as (3%) of the amount of the pension payable at
the time of the increase.
Employees are required to contribute (9.91%) of their base salary to the Police Pension Plan. If
an employee leaves covered employment with less than (20) years of service, accumulated
employee contributions may be refunded without accumulated interest.
For Employees hired after January 1, 2011, the Normal Retirement age is attainment of age 55
and completion of 10 years of service; Early Retirement age is attainment of age 50, completion
of 10 years of service and the Early Retirement Factor is 6% per year; the Employee's Accrued
Benefit is based on the Employee's final 8-year average salary not to exceed $106,800 (as
indexed); Cost -of -living adjustments are simple increases (not compounded) of the lesser of 3%
or 50% of CPI beginning the later of the anniversary date and age 60; Surviving Spouse's
Benefits are 66 2/3% of the Employee's benefit at the time of death.
-13-
ACTUARIAL METHODS
The Actuarial Methods employed for this valuation are as follows:
Projected Unit Credit Cost Method (for years be inning on or after 2011 for PA 096-1495)
Under the Projected Unit Credit Cost Method, the Normal Cost is the present value of the
projected benefit (including projected salary increases) earned during the year.
The Accrued Liability is the present value of the projected benefit (including projected salary
increases) earned as of the actuarial valuation date. The Unfunded Accrued Liability is the
excess of the Accrued Liability over the plan's assets. Experience gains or losses adjust the
Unfunded Accrued Liability.
Entr,�ge Normal Cost Method
Under the Entry Age Normal Cost Method the Normal Cost for each participant is computed as
the level percentage of pay which, if paid from the earliest age the participant is eligible to enter
the plan until retirement or termination, will accumulate with interest to sufficiently fund all
benefits under the plan. The Normal Cost for the plan is determined as the sum of the Normal
Costs for all active participants.
The Accrued Liability is the theoretical amount that would have accumulated had annual
contributions equal to the Normal Cost been paid. The Unfunded Accrued Liability is the excess
A the Accrued Liability over the plan's assets. Experience gains or losses adjust the Unfunded
Accrued Liability.
-14-
ACTUARIAL ASSUMPTIONS
The Actuarial Assumptions used for determining the Tax Levy Requirement and GASB
Statements No. 25 & 27 and 67 & 68 Disclosure Information are the same (except where noted)
and have been changed from the prior year (discussion on page 4). The methods and
assumptions disclosed in this report may reflect statutory requirements and may reflect the
responsibility of the Principal and its advisors. Unless specifically noted otherwise, each
economic and demographic assumption was selected in accordance with Actuarial Standards of
Practice 27 and 35 and may reflect the views and advice of advisors to the Principal. In the event
a method or assumption conflicts with the actuary's professional judgment, the method or
assumption is identified in this report. The Actuarial Assumptions employed for this valuation
are as follows:
Valuation Date May 1, 2015
Asset Valuation Method 5-year Average Market Value (PA 096-1495)
Investment Return 7.50% net of investment expenses.
Salary Scale 5.50%
Mortality RP 2000 Mortality Table (CHBCA). There is no margin
for future mortality improvement beyond the valuation
date.
Withdrawal Based on studies of the Fund and the Department of
Insurance, Sample Rates below
Disability Based on studies of the Fund and the Department of
Insurance, Sample Rates below
Retirement Based on studies of the Fund and the Department of
Insurance, Sample Rates below (100% by age 70)
Marital Status 80% Married, Female spouses 3 years younger
-15-
ACTUARIAL ASSUMPTIONS (Continued)
Sample Annual Rates Per 100 Participants
Aze Mortality Withdrawal Disability
20 0.03 10.00 0.05
25 0.04 7.50 0.05
30 0.07 5.00 0.22
35 0.11 3.00 0.26
40 0.14 2000 0.40
45 0.18 2000 0.65
50 0.24 3.50 0.95
55 0.42 3.50 1.30
60 0.83 3.50 1.65
65 1.55 3.50 2.00
70 2.68
-16-
Retirement
20.00
25.00
33.00
50.00
100.00
GASB STATEMENTS NO. 25 & 27 DISCLOSURE INFORMATION
The Governmental Accounting Standards Board (GASB) issued Statements No. 25 & 27 that
established generally accepted accounting principles for the annual financial statements for
defined benefit pension plans. The required information is as follows:
Membership in the plan consisted of the following as of:
Retirees and beneficiaries
receiving benefits
Terminated plan members entitled
to but not yet receiving benefits
Active vested plan members
Active nonvested plan members
Total
Number of participating employers
SCHEDULE OF FUNDING PROGRESS
Actuarial
Valuation
Date
04/30/13
Actuarial
Value of
Assets
18,603,585
04/30/14 20,279,175
04/30/15 21,151,953
Apri130, 2015
Actuarial Accrued
Liability (AAL)
-Entry Age
30
2
31
14
1
Apri130, 2014
Unfunded
AAL Funded
(UAAL) Ratio
�� �)
3596439262 17,039,677
38,323,678 18,044,503
401226,092 19,074,139
-17-
30
1
32
14
ZZ
1
UAAL as a
Percentage
Covered of Covered
Payroll Payroll
(c) b-a /c
52.2% 31
618,130
52.9% 3,793,817
52.6% 3,791,467
471.0%
475.6%
503.1%
GASB STATEMENTS N0.25 & 27 DISCLOSURE INFORMATION (Continued)
ANNUAL PENSION COST AND NET PENSION OBLIGATION
Annual required contribution
Interest on net pension obligation
Adjustment to annual required contribution
Annual pension cost
Contributions made
Increase (decrease) in net pension obligation
Net pension obligation beginning of year
Net pension obligation end of year
THREE-YEAR TREND INFORMATION
Apri1304 2015
1,295,577
101,156
6( 4,286)
1,3325447
1,2954101
37,346
1,348,750
13860096
ATri130I 2014
1,193,543
98,790
6( 1,0621
1,231,271
1,199,718
31,553
1,317,197
1.348,750
Fiscal Annual Percentage Net
Year Pension of APC Pension
Endiniz Cost (APC) Contributed Obligation
04/30/13 11210,837 99.1% 11317,197
04/30/14 1,2315271 97.4% 1,3489750
04/30/15 133327447 97.2% 113867096
-18-
GASB STATEMENTS N0.25 & 27 DISCLOSURE INFORMATION (Continued)
FUNDING POLICY AND ANNUAL PENSION COST
Contribution rates:
City 34.16% 31.62%
Plan members 9.91% Same
Annual pension cost 1,332,447 1,231,271
Contributions made 1,295,101 1,199,718
Actuarial valuation date 04/30/2015 04/30/2014
Actuarial cost method Entry age Same
Amortization period Level percentage of pay, closed Same
Remaining amortization period 26 years 27 years
Asset valuation method Market Same
Actuarial assumptions:
Investment rate of return* 7.50% Same
Projected salary increases* 5.50% Same
*Includes inflation at 3.00% Same
Cost -of -living adjustments Tier 1: 3.00% per year, compounded Same
Tier 2: 2.00% per year, simple
-19-
GASB STATEMENTS NO. 67 MOO DISCLOSURE INFORMATION
Plan Membership
Inactive plan members or beneficiaries
currently receiving benefits
Inactive plan members entitled to but not
yet receiving benefits
Active plan members
Total
Net Pension Liability of the City
Total pension liability
Plan fiduciary net position
City's net pension liability
Plan fiduciary net position as a percentage
of the total pension liability
Actuarial Assumptions
Inflation
Salary increases
Investment rate of return
Apri130, 2015
30
�a
40,226,092
21,151,953
19,074,139
52.58%
3.00%
5.50%
7.50% net of expenses
The projection of cash flows used to determine the discount rate assumed that plan member
contributions will be made at the current contribution rate and that City contributions will be
made at rates equal to the difference between actuarially determined contribution rates and the
member rate. Based on those assumptions, the pension plan's fiduciary net position was
projected to be available to make all projected future benefit payments of current members.
Therefore, the long-term expected rate of return on pension plan investments was applied to all
periods of projected benefit payments to determine the total pension liability.
Based on those assumptions, the discount rate was determined in accordance with paragraphs
40-45. Therefore, the discount rate was applied to all periods of projected benefit payments to
determine the total pension liability.
Sensitivity of the Net Pension Liability to Changes in the Discount Rate
1%Decrease Current Discount Rate
Net Pension Liability
6.50%
24,583,251
-20-
7.50%
19,074,139
1%Increase
8.50%
14,538,892
GASB STATEMENTS NO. 67 & 68 DISCLOSURE INFORMATION (continued)
Schedule of Changes in the City's Net Pension Liability and Related Ratios
Total Pension Liability April 30, 2015
Service cost 876,654
Interest 2,804,198
0
Chanes of benefit terms g
Differences between expected and actual experience (300,710)
Changes of assumptions 391,028
Benefit payments, including refunds of member 1,8681756
contributions
Net change in total pension liability 15902,414
Total pension liability - beginning 385323,678
Total pension liability - ending 40,2261092
Plan Fiduciary Net Position
Contributions -employer 1,295,101
Contributions - member 381,363
Net investment income 1,101,915
Benefit payments, including refunds of member 15868,756
contributions
Administrative expense 36,846
Other 0
Net change in plan fiduciary net position 872,777
Plan fiduciary net position - beginning 20,2795175
Plan fiduciary net position - ending 217151,953
City's net pension liability 19,074,139
Plan fiduciary net position 52.58°Io
as a percentage of the total pension liability
Covered -employee payroll 3,791,467
City's net pension liability 503.08°Io
as a percentage of covered -employee payroll
-21-
GASB STATEMENTS NO. 67 & 68 DISCLOSURE INFORMATION (continued)
Schedule of City Contributions
Apri130, 2015
Actuarially determined contribution 17295,577
Contributions in relation to the actuarially 1,295,101
determined contribution
Contribution deficiency (Excess) 476
Covered -employee payroll 3,791,467
Contributions as a percentage of 34.16%
covered -employee payroll
Notes to schedule
Valuation date Apri130, 2015
Methods and assumptions used to
determine contribution rates:
Actuarial cost method Entry Age Normal
Amortization method Level Percentage of Pay
Remaining amortization period 26 years
Asset valuation method Market Value
Inflation 3.00%
Salary increases 5.50%
Investment rate of return 7.50%
Retirement age 50-70
Mortality RP 2000 CHBCA
Other
Mortality rates were based on the RP-2000 CHBCA Mortality Table. The actuarial assumptions
used in the Apri130, 2015 valuation were based on the results of an actuarial experience study
conducted by the Illinois Department of Insurance dated September 26, 2012.
-22-