AGENDA
Parks & Recreation Committee �
Wednesday, October 18, 2oob
McHenry Municipal Center
7:0o prn
Alderman's Conference Room
� i. Review of Playground Renovation Proposal—3D Design
2. Parks and Recreation Master Plan Discussion
. - Bonestroo, Devery&Assaciates
3. New Business �
Next Meeting: Wednesday, November 8, 2006 �
AGENDA ITEM �
Review of Plav�round Renovation Pronosal — �D Desi�n
A presentation was made at the June i3, 2006 committee meeting regarding the last
phase of the playground renovation program. Staff was instructed to obtain a proposal
from 3D Design Studio for professional design and construction services. The two
remaining playground sites are Creekside Park and Malibu Tot Lot.
3D Design Studio has been involved with the city providing park and playground design
services for the last four years. Our staff met with representatives from 3D Design
Studio to tour these two sites and to review renovations and access issues.
A proposal for design services and construction management is attached. This proposal
is similar to the previous proposals submitted for playground renovation by this firm.
Staff would recommend approval of this proposal for professional design and
construction management services to complete the city playground renovation program.
�
3 D D E S I G N 5 T U D I O
Mr.Pete Merkel
Director of Parks and Recreation
City of McHenry
333 S. Green Street
McHenry, IL 60050
RE: TOT LOTS RENOVATION- PHASE II PROPOSAL
Dear Pete,
I would like to thank you for the opportunity to submit this proposal to provide
site base mapping, concept development, final design and site construction
bidding assistance for the Tot Lots Renovation Project. The following outlines
our proposed approach and Scope of Services:
SGOPE OF SERVICES
I. DESIGN REFINEMENT AND PRODUCT SELECTION
A. We will use the existing conditions plans we received from the City of
McHenry and will develop initial design plans for the Malibu Playground
and Creekside Paxk playground. We will work within the established
budget of $90,000 to renovate these two tot lot playgrounds. We will plan
to meet with you on each site location to review specifics regarding the
each playground development.
B. We will also plan to photograph each area for our reference. We will
document items discussed and decisions reached and provide minutes via
email.
C. We will coordinate with playground manufacturers to request the three
playground equipment proposals with options the City can use to review
for selection purposes.
II. FINAL DESIGN AND SUDGET PREPARATION
A. After the playground equipment selection is made, we will make any
revisions necessary and incorporate these into a Final Design plan for each
tot lot for the purpose of requesting competitive bids.
529 BARRON BOULEVARD GRAYSLAKE, ILLINOIS 60030
(847) 223-1891 VoiCE (847) 223-1892 Fax
WEBSITE: WWW.3DDESIGNSTUDIO.COM EMAIL: INFOQ3DDESIGNSTUDIO.COM
City of McHenry
Tot Lots Renovation—Phase II Proposal Page 2
B. We will forward the final design of each tot lot with a detailed set of
drawings illustrating our recommendations via email for your review and
approval prior to preparing construction bidding documents. We will also
send a new estimate of probable cost for your review. If required, we will
make any final adjustments in the scope of the bidding documents to meet
the budget requirements.
III. CONSTRUCTION DOCUMENT PREPARATION
A. Upon your approval, we will proceed with the preparation of construction
bidding documents.
B. We will provide a proposed bidding schedule via email.
C. 3D Design Studio will provide a bid advertisement for your use in
submitting to the local paper and we will fax copies to contractors and
provide bid sets to the City of McHenry. We will also administer the
distribution of the bidding documents to the respective contractors for the
project. � During the bidding process, we will be available to answer
contractor questions.
D. We will attend a Pre-Bid Meeting to discuss the plans and answer
questions. We will also prepare any Addenda that may be required.
E. We will attend the bid opening and take copies of the bids to prepare a
recommendation. We will take the necessary steps to confirm the
apparent lowest responsive contractor is in fact qualified to perform the
tasks required.
F. Based upon the review of the bids and our investigations, we will prepare
a written recommendation to enter into an Agreement with the Contractor
best able to meet the requirements of the bid
IV. CONSTRUCTION OBSERVATION
A. 3D Design Studio will attend a Pre-Construction meeting with the
Contractor to discuss activities of the site development, site inspection
and reviews, submittals, processing of Pay Requests, and determine a
schedule for the construction and contractor coordination of the various
improvements within the site.
B. We will make three site visits to each playground site during construction
to review the installation and answer any questions that the Contractor
may have. Each site visit will include a written field report documenting
items discussed and decisions reached or directions given to the
Contractor. This will include one meeting during construction to review
specific construction items and to review his pay request, and a final
City of McHenry
Tot Lots Renovation-Phase II Proposal Page 3
meeting to prepare the project punchlist and to approve the final pay
request.
C. Upon request from the Contractor, we will review the work for Substantial
Completion and prepare a punchlist for corrections to the work. We will
then perform a Final Walk-through at the completion of the project. If
items are satisfactory, we will make recommendation for Acceptance of
the work and recommend approval of the Final Payment.
PROFESSIONAL FEES,ADDITIONAL SERVICES,AND REIMBURSABLES
The professional services outlined above will be performed on an "hourly not to
exceed" basis, not including reimbursable expenses:
I. DESIGN REFINEMENT AND PRODUCT SELECTION $ 1,475.00
II. FINAL DESIGN AND FINAL BUDGET PREPARATION $ 2,250.00
III. CONSTRUCTION DOCUMENT PREPARATION $ 3,200.00
IV. CONSTRUCTION OBSERVATION $ 1,050.00
PROFESSIONAL SERVICES TOTAL- 7 975.00
ADDITIONAL SERVICES
Where additional meetings, presentation of our plans, additional construction
observation services, or additional design services are requested, this work shall be
performed on an hourly basis at the rates listed below, or under a separate
agreement. The hourly rates are as follows:
Principal $125.00 Design Manager $105.00
Landscape Architect II $ 85.00 Landscape Architect I $ 75.00
Support Staff $ 50.00
INVOICING
Invoicing will be presented monthly for work completed during that month.
Payment is to be made within 30 days of the date of the invoice.
REIMBURSABLE EXPENSES
Reimbursable expenses are as follows, and will be included in the regular monthly
invoicing:
'� Drawing reproductions, photography, and/or materials required for
presentations or preparation for use in presentations or meetings.
* Photocopy reproduction (color or black and white).
* Delivery, messenger services, overnight mailing services, and mileage for
attending meetings at the currently accepted mileage rate.
* Photography materials-film, developing and any enlargements.
City of McHenry
Tot Lots Renovation-Phase II Proposal Page 4
* Plotting services from AutoCad drawing files.
'� The Reimbursable Expenses, including plotting the design alternatives,
refined design alternatives, "Kit-of-Parts" presentation boards, site slides
and photographs, preliminary submittal "check plots", final plots of
presentation drawings and copies for the preparation of Final Master Plan
booklets are all considered reimbursable.
SPECIAL CONDITIONS
The Owner agrees to waive all claims and liability against 3D Design Studio in the
event that the Owner executes the work without 3D Design Studio contracted to
observe and document the construction activities. The Owner accepts the
responsibility for the accuracy of the base information provided for the purposes of
developing the initial Site Plan if our surveying services are not incorporated into
the process. Should a problem arise from any inaccuracy of the base information,
3D Design Studio will assist in correcting the situation, but will be compensated
hourly for additional time that may be required. Fees for special submittal
coordination and/or meetings with non-Park District agencies like ComEd, Corps
of Engineers or Departrnent of Natural Resources are not contained within this
proposal.
The Owner acknowledges that there are no Architectural, Structural or Civil
Engineering fees associated with the Services outlined in this proposal. Should
there need to be these services for the evaluation of the site, these services can be
quoted separately, or provided under an amendment to this agreement.
I would like to thank you again for the opportunity to submit this proposal to work
with you and the City of McHenry on the Tot Lot Renovation - Phase II project. I
look forward to hearing from you regarding this proposal, and to getting started on
the initial design plans!
Very Truly Yours,
� �
Daniel D. Dalziel, ASLA
Principal
Accepted Date
AGENDA ITEM 2
Parks and Recreation Master Plan Discussion
Bonestroo, Devery&Associates
Steve Halberg, Project Manager, will be in attendance to discuss the progress of the
Parks and Recreation Master Plan.
Attached is information from Bonestroo, Devery &Associates on the subject matter for
the committee meeting.