HomeMy WebLinkAboutMinutes - 6/23/1994 - Finance and Personnel Committee �
� �� �
M B M 0 x A ft D U M
T0: Finance Committee
FROM: Gerald R. Peterson, City Administrator �� -��2�
DATE: June 23, 1994
RE: Water & Sewer Rate Discussion Follow-Up
It is my understanding that the Finance Committee wishes to review
additional information about specific line items in the Water Fund
and the Sewer Fund budgets prior to having further discussion about
adjustments to water and sewer rates.
� Water Fimd
Total revenues in the Water Fund for the 1994-95 budget year are
estimated to be $674,600. Water sales account for $610,000 of this
total with $18,000 estimated from a $.10 per thousand gallon
increase, to become effective November 1, 1994 (to appear �n first
bill in January, 1995). Annualized revenue from this proposed
increase are estiraated to be $53,000.
Account 4�510, Contractual Services. The current budger. of :�46,300
is an increase from the $24,300 budgeted last year. The 3ncrease is
attributed to:
(a) a $7,000 increase in water testing service cost� dtze to
changed requirements and funding by the Illinois
Environmental Protection Agency, and,
(b) the inclusion of $15,000 to perform an engineering study to
evaluate needed repairs to water plant ��1 in con3unction
with addressing and resolving potential problems with the
underground gasoline storage tanks ad3acent to the plant.
�
Water & Sewer Rates
Page 2
Account ��527, Materials and Supplies. The current budget of $68,500
�-- is ar� increase from the $13,000 budgeted last year. The increase is
a result of:
(a) eliminated account ��536 (Repair & Maintenance of Buildings)
and transfer $1,500 expenditure to this account.
(b) eliminated account ��546 (Repair & Maintenance of Equipment)
and transfer $2,000 expenditure to this account.
(c) eliminated account ��554 (Repair & Maintenance of System) and
transfer $27,000 expenditure to this account.
(d) Add new $25,000 expenditure for compliance with federal
mandate to treat water for lead levels whcih exceed federal
standards through the addition of chemicals polyortho
phosphate.
Account ��620, Transfer Utility Bond and Interest. The �current
budget of $55,160 is compared to $42,364 budgeted last year, and
reflects the issuance of a new lower interest bond which defeased
two outstanding revenue bond issues and changed the payment
schedule. The current budget should be revised to reflect a $47,854
expenditure ($7,306 expenditure reduction).
Sewer Fund
Total revenues in the Sewer Fund for the 1994-95 budget year are
� estimated to be $1,254,400. Sewer sales account for $890,000 of
this total, with $28,000 estimated from a $.15 per thousand gallon
increase to become effective November 1, 1994 (to appear on first
bill in January, 1995). Annualized revenue from this increase are
estimated to be $85,000.
Account 4�537, Repair & Maintenance of Vehicles. The current budget
of $12,000 compares to last years budget of $5,000. The increase is
attributable to:
(a) the inclusion of $7,000 for ma3or semi-trailer/tanker
repairs.
Account 4�546, Repair & Maintenance of Equipment. The current budget
of $25,000 compares to a budget of the same amount last year. The
DirEctor of Public Works recommended eliminating this account and
combining expenditures with other accounts. This was not appro�=ed.
Accont ��620, Transfer Utility Bond & Interest. The current hudget
of $379,883 compares to $342,672 last year, and reflects the
issuance of a new lower interest bond which defeased two outstanding
revenue bond issues and a changed payment schedule.
Capital cast for South Wastewater Treatment Plant dechlorination is
budgeted at $115,000. Committee sought cost for building treatment
for existing plant (500,000 gallons per day) and incremental cost
� for adding treatment for 1,000,000 gallons. Estimate from Baxter &
Woodman to construct dechlorination for 500,000 g is �75,000-85,000;
construction costs for next for 1,'000,000 g is $30,000-40,000. A
compliance schedule for constructing dechlorination equipment
approved as part of the City's operating permit is attached.
. � •r '�E�`ry��j� ��
�e�k'� a� i�
Page 5 ���e �
NPDES Permit No. IL0066257
Saecial Conditions
� SPECIAL CONDITI N F. Fecal Coliform limits for this discharge point are effective May thru
October. Sampling of fecal Coliform concentrations are only required during this time period.
Any use of chiorine to achieve tlie fecal coliform limitation or to control slime growths or odors
etc. shall not exceed tlie limit o( .05 mg/1 (daily maximum) total residual cf�lorine in tfie
effluent. Tfiis limitation and associated sampling sliall become effective 24 months from tl�e
eFfective date of tliis permit. Sampling is required on a daily grab basis during tlie chlorination
process. Reporting shall be submitted witfi the (OMR's) on a monthly basis.
If the permittee is chlorinating for any purpose during the montlis of November tliru April , a
monthly average limit of .75 mg/1 total residual cl�lorine si�all be in effect until the .05 mg/1
daily maximum becomes effective. Sampling shall be daily grab and reported on tl�e (OMR's) on a
monthly basis.
In order for the permittee to achieve the above limit, it will be necessary to construct eitl,er
alternate means of disinfection or installation of de—clilorination equipment in accordance witli
the following schedule: � �
i1qp
1. Plans and specifications G months from effective date of this permit � ����V��
submitted to IEPA 1���
reb'��
2. Arrange financing 9 months from effective date of tfiis permit� a �ci9�
a�' '
3. Commence construction 10 montf�s from effective date of this permit �� � a i�q`�
4. Interim report 16 monttis from effective date of this permit 'SeP � f�q�j
�
5. Complete construction 22 months from effective date of this permit � M"`�� �jS
6. Obtain operational level 24 monlhs from effective date of tliis permit� I�a��a
1�
Compliance dates set out in this Permit may be superseded or supplemented by compliance dates in
judicial orders, Pollution Control Board orders. This pe rn�it may be modified, with Public Notice,
� to include such revised compliance dates.
The permittee shall operate the de—chiorination facilities in a manner to ensure continuous
compliance with the total residual chlorine limit, and not to the extent .that will result in
violations of other permitted effluent characteristics, or water quality standards.
REP RO TING
The permittee shall submit a report no later than fourteen (14) days following the completion
dates indicated for each numbered item in the compliance schedule, indicating, a) tl�e date tlie
item was completed, or b) that the item was not completed, the reasons for non completion and tlie
anticipated completion date.
SPECIAL CONDITION 7. The permittee shall record monitoring results on Discharge Monitoring Report
forms using one such form for each discharge each month.
The completed Discharge Monitocing Report forms shall be submitted to IEPA no later than tlie
15th day of the following monlh, unless otlierwise specified by the permitting autiiority.
Discharge Moritoring Reports shall be mailed to the IEPA at the following address:
Illinois Environmental Protection Agency
Division of Water Pollution Control
2200 Churchill Road
P.O. Box 19276
Springfield, Illinois 62794-9276
Attention: Compliance Assurance Section
�
• FINANCE CONII�IITTEE MEETING
June 6, 1994
Members Present: Chairman Locke, Greg Bates, David Lawson
Others Present: Mayor Cuda
�- Staff Present: City Administrator Peterson and City Clerk Althoff
Chairman Locke called the meeting to order at 7:01 P.M. The meeting
was called, as per council's direction, to discuss the committees
original recommendation to increase water and sewer rates which were
included as part of the approved budget for the fiscal year
1994-95. City Administrator Peterson gave a summary review of the
sequence of events and actions leading up to this meeting.
Several options were discussed addressing budget corrections.
- Passing the ordinances raising the rates
- Bsing capital outlay
- Raising the rates slowly over a 3 year period
- Using the $100 increase in water and sewer connection fees
assigned to Building and Zoning
- Cutting expenses
Chairman Locke indicated he would not support a rate increase under
any circumstance at this time and recommended the $100,000 needed
for the dechlorination tank be funded through capital expenditures.
� Further discussion followed.
Chairman Locke asked City Administrator Peterson to redo the Budget
without the rate increase included and to delineate any
extraordinary expenses we might postpone and any projects that might
span a two year period.
Chairman Locke called for a five minute recess at 8:30P.M. City
Administrator Peterson and City Clerk Althoff were excused at this
time.
The meeting resumed at 8:37p.m. Further discussion followed as to
balancing the budget without a water and sewer increase.
Meeting adjourned at 9:OOpm
Respectfully submitted,
�--
�._ --:� �� C��
��� �� �
P ela Altho f
C ty Clerk
\