Loading...
HomeMy WebLinkAboutMinutes - 2/26/1996 - Finance and Personnel Committee � FINANCE COMMITTEE MINUTES February 26, 1996 Members Present : Chairman Lawson, Bill Baird Greg Bates Others Present : City Clerk Althoff, Senior Clerk Susan Christenson, Alderman Locke, Director of Public Works Batt, Mayor Cuda arrived at 7 :25 PM Alderman Lawson called the meeting to order at 7 : 06 P.M. Lawson stated that the purpose of the meeting is to review the various department requests and recommendations for the 1996-97 budget year. Public Works Administration Director of Public Works Batt noted the addition of a fulltime receptionist to be shared between his department and Building and Zoning. It was staff' s recommendation to place one fulltime receptionist from General Administration here and move the budgeted parttime receptionist position from Public Works and Building and Zoning to General Administration. Monies budgeted for City Mapping were moved from the contractual account, 510 to Capital Outlay account 700 . Further discussion - regarding city mapping will be conducted under Building and � Zoning Department requests as the cost of this project will be divided between Public Works and Building and Zoning. Street and Park Division Staff was instructed to reflect a 5o COLA raise for all nonunion department employees . A fulltime Parks Ranger position was added to this year' ss budget . Director Batt noted this would be a union position. The tool allowance was moved from account 401 to 492 . Some discussion took place regarding contractual account 510 and the budgeted funds for Lakeland Park Stormwater engineering and drainage work. The committee noted this work was not started and monies should be carried over to the 96-97 fiscal year to insure its completion. A discussion followed noting the impact the Willow Street Station improvements will have on stormwater basement flooding in the Millcreek subdivision area. Director of Public Works Batt stated the need to conduct a drainage study to determine the required culvert size and how to proceed. He stated the $100, 000 budgeted will cover the cost of a drainage study by city engineers, Baxter and Woodman. The need for a long term as well as short term solutions to satisfy affected residents was acknowledged. Mayor Cuda requested a checklist be created for each main culvert . � Finance Committee Minutes February 26, 1996 � Page Two Street and Park Division (cont) Discussion followed regarding the water problems at Ann Street and the Jewel Food Store Pond at Route 120 . Alderman Bates also noted the Maple Avenue creek near the graveyard needed to be cleaned. Director of Public Works, Batt, stated staff needed to determine if a "root" problem existed. Some further discussion followed regarding the feasibility of budgeting monies for the laying of sewer lines down Maple Ave in the 1997-98 fiscal year. The Materials and Supplies account, 527, had no amount budgeted. Director of Public Works Batt asked that a figure of $23 , 000 be placed on this line item. The Committee concurred. Some discussion then took place regarding monies for the West McHenry ByPass . Director of Public Works Batt noted that the IDOT monies budgeted for Route 120 improvements from the Union Pacific railroad tracks to Charles Road in Woodstock were reallocated and improvements were now planned for the year 1999 . Batt also noted the $50, 000 budgeted for miscellaneous sewer repairs in Capital Outlay account 700 were tied to the Maple Creek problem discussed earlier. L The Committee noted that further discussion should take place regarding these capital outlay items : Sewer Jet Replacement Automatic sprinklers . .Veteran' s Park Automatic sprinilers . . Knox Park soccer fields Staff noted some of these capital outlay projects may be reallocated to different account numbers . Building & Grounds The budgeted monies for 1996-97 salaries include 3 part timers . Batt explained that two are new positions and would be used to begin maintanence projects inside and outside the Municipal Building. Under the Capital Outlay account, 700, Batt noted the Municipal Building' s parking lot needed to be resurfaced and the northeast corner of the parking lot needed to be removed and straightened because of drainage problems . The Committee directed City Clerk Althoff to investigate further the cost of video equipment for the council chambers as $10 , 000 was budgeted in this account for this purpose . It was noted that monies collected for the use of the Municipal Building' s classroom were earmarked for furniture and equipment replacement for the classroom. `�.. Finance Committee Minutes February 26, 1996 �• Page Three Vehicle License Fund It was noted that some Material and Supply costs for the Public Works Department were expensed from this account . Staff noted this was a limited use fund for such projects as street lighting, signal re�air, street construction and resurfacing, etc . Road and BridQe Fund Staff noted this fund was also a limited use fund for street maintenance, street lighting, street resurfacing, etc . Monies for one-half of the city' s sidewalk program are budgeted here . Director Batt noted Bull Valley Road is in need of repair, particularly on the south side, west of Route 31 . Some discussion followed regarding a ministreets program for downtown revitalization efforts . Further discussion ensued regarding the reorganization of Parks and Public Works . The Committee stated their intent to discuss the reorganization further with Director of Parks and Recreation Merkel on Wednesday, February 28th. The committee, noting monies budgeted for a traffic study in this fund, discussed the feasibility of hiring a consultant to complete the study next year. � Motor Fuel Tax These monies are also used for street and sidewalk like projects . The committee also noted that both Willow and Prairie Streets, after the reconstruction project, have retained the wavelike design. Mayor Cuda requested the Green Street Phase III project be ready for submission to the Council of Mayors by March 29th. Budgeted funds for this project reflect only the City' s portion based on receipt of the Council of Mayor grant . Some discussion followed regarding budgeting monies for a traffic signal at the Route 31 and Shamrock Lane intersection. Chairman Lawson placed this item on the Discussion List . The committee reviewed the remaining projects including the left- turn lane at Gary Lang Chevrolet, the feasibility study for the addition of a cross section along McCullom Lake Road from Route 31 to the railroad tracks and the reconstruction of Main Street, west of Route 31 including curb and gutter for Borden Street . Alderman Bates reminded the committee that a letter must be sent to Inland notifying them of the City' s intent to invoke the annexation agreement clause regarding receipt of right of way for \.,. the widening of McCullom Lake Road. Alderman Locke left the meeting at 9 : 15 PM. Finance C�mmittee Minutes February 26, 1996 Page Four � Motor Fuel Tax Fund (cont) Some discussion followed regarding the accumulation of water on the roadway in front of the Mobil Gas Station on Route 31 . Director of Public Works Batt also noted Front Royal and Main Street between Green and Route 31 were in dire need of repair. Water DeAartment Some discussion ensued regarding the proposed promotion of Bill Cunningham which was reflected in Director Batt' s budget recommendations . Some additions to the Water Department' s budget included more dollars for training becausse of OSEA right-to-know requirements . Batt noted this cost was spread throughout the appropriate departments . Under the Contractual account, miscellaneous, monies were budgeted to pull the well pumps on a rotating cycle for maintance and cleaning as they clog with rust, iron, etc . Batt also note Water Plant #9 needed attention. His budget recommendations included monies to explore either replacement or repair options . Sewer Department The committee discussed funding for the extension of sanitary sewer to � the recently annexed properties east of the river. Chairman Lawson noted that this project should be discussed at length at a later point in time during the budget process . Staff noted that item #7, engineering for SWWTP under account 700, Apaital Outlay was reallocated to the Capital Development Fund. Recreation Fund/Account 61.41.526 This particular account is the Petersen Park Barn project . The committee' s discussion revolved around simple cosmetic improvements or the hiring of a contractor to handle major renovation projects . The committee also needed to determine whether to keep this project under account #526 or move it to Capital Outlay, Account #700 . Downtown Revitalization Batt noted that $150, 000 had been allocated for the city' s downtown revitalization commitments . The committee noted the need to budget monies for a park to be located on the northeast corner of Route 120 and Green Street . These monies would be utilized for building demolition, planning and landscaping. Motion by Bates, seconded by Lawson to adjourn the meeting at 10 : 00 PM. � Respectfully submitted, \ �� n � ��.�_.<z�-..�' � � ��� b" G