Topics of discussion:
1 . HolZ _Apostles_Buildin�_Pro�ect
Smitli noted that the purpose of this meeting was to consider
and make a recommendation to the Council on� a request from
Father Robert Sherry, Pastor of The Church of Holy Apostles
to 1 ) waive buildi'ng permit fees, 2) allowing them to design
and erect a sign, and 3) consider allowing the church to delay
paving their parking lot for a year or two .
Donahue stated that she felt the building permit fees should
be waived. The sign was not a problem, but the Council should
be allowed to review the design before it is erected, and if
a variance is needed it should be permitted within reason.
She also noted variances were granted to Goodyear and Little
Caesars . Concerning the request to delay paving the parking
lot , Donahue agrees with Father Sherry' s reasoning that it
would allow the ground to be better packed before asphalt was
laid and feels the City should grant approval .
Smith agrees with Donahue, however, he feels the main entrance
or approach to the church parking lot should be paved or at
least a base coat should be put down. Donahue agreed and
stated that a binder course would be sufficient .
Lobaito suggested that a letter from Father Sherry be
submitted to the Building and Zoning Department detailing a
completion date for the paving . He then pointed out a
memorandum containing a list of permit requests from various
churches throughout the City that have been waived .
Committee Recommendation: 1) waive building permit fees with
the ezception of capital improvement fees, 2) approve
installation of a sign contingent upon Gouncil approval of the
design, and 3) allow the church to delay paving their parking
lot for a year or two, vith the eaception of the driveway or
the approach vhich should have at least a base coat.