HomeMy WebLinkAboutMinutes - 10/09/2017 - Public Works CommitteePUBLIC WORKS COMMITTEE
MEETING REPORT
Monday, October 9, 2017
Municipal Center Council Chambers, 6:30 PM
Committee Members in Attendance at Roll Call: Chairperson Alderman Santi, Alderman
Glab and Alderman Mihevc.
Also in Attendance: Director of Public Works Schmitt, Project Engineer Strange, Utty
Division Superintendent Steve Wirch, Street Division Superintendent Schweda, Wastewater
Superintendent Russell Ruzicka , Water Superintendent Mike Palmer, and City Clerk Nevitt,
1. Call to Order: The meeting was called to order at 6:30 pm.
2. Public Comment:
Joan Sorenson who resides at 209 Windrid�e in the Foxridge subdivision addressed the
Committee regarding her concerns about speeding cars and school busses on Dartmoor
Drive from Crystal Lake Road to Curran Road. Ms. Sorenson requested a flashing speed
limit sign be installed in her subdivision.
City resident Terry Locke announced he was in attendance to support Alderman Glab's
recommendation to install radar speed signs in town.
3. Discussion regarding Pedestrian Crosswalks on Green Street.
Chairperson Santi asked Director Schmitt to present Agenda Item #3 to the Committee.
Director Schmitt reported Chairperson Santi had requested this item be placed on a
Committee agenda. Chairperson Santi was specifically interested in the area of Green
Street between Waukegan Road and Boone Lagoon. There is currently a pedestrian
crossing at the intersection of Waukegan Road and Green Street and just south of Boone
Lagoon that connects the Riverwalk and 1111 N. Green Street (former site of City Hall).
McHenry Police confirmed that in the past four years, one pedestrian related accident was
reported at the intersection of Green Street and Waukegan Road, which is a controlled
intersection with a four-way stop. Public Works personnel reviewed the area for ways to
enhance the existing crosswalks. All crosswalks on Green Street from Waukegan Road
to Elm Street are block -style and for some reason when the Riverwalk crosswalk was
installed, just two solid lines were painted. Public Works recommends repainting these
lines in block -style to make it more noticeable. Staff also noted pedestrian crossing
signage on Green Street is limited.
Chairperson Santi asked for comments from the Committee.
Alderman Glab said he would not change any locations until comprehensive discussions
have taken place about the downtown area parking etc. He also stated his opinion that
crosswalks give people a false sense of hope.
Public Works Committee Meeting
Page 2
October 9, 2017
Alderman Glab further stated that a big problem with the downtown area is that Green
Street is a thru street. Traffic going north and south on Barreville and Green to Route
120 have to go through the downtown area.
Alderman Mihevc said he was in favor of anything that would make the crosswalks more
prominent. He stated he is in the area quite often and much of the pedestrian traffic he
sees is students who cross whenever and wherever they want. Increasing the prominence
of the crosswalks may help the students' awareness of the crosswalk. Alderman Mihevc
added he was surprised that only one pedestrian accident had been reported in that
location as this is the one location in town that concerns him the most.
Chairperson Santi asked how difficult would it be to transform the crosswalks to block -
style. Director Schmitt said it would not be difficult to do. Chairperson Santi also
requested enhanced signage to make drivers more aware of the crosswalks especially at
the Green Street Bridge and Waukegan Road and Green Street,
Alderman Glab asked Director Schmitt if there was an ordinance regulating the 20 mph
speed limit posted on Green Street. Director Schmitt answered yes, the Traffic and Motor
Vehicle Code states the speed limit of 20 mph is established on Green Street between
Pearl Street and Waukegan Road. The ordinance has most likely been in effect for a long
time because there is no date listed in the code.
Alderman Glab noted that kids are all around town on streets with a 25 mph speed limit
yet downtown the limit is 20 mph and asked Director Schmitt how many 20 mph signs
are posted. Director Schmitt said he believes only one and perhaps more should be
posted. Alderman Glab said the street should be well signed and suggested a solar
flashing light be installed on Green Street to bring attention to the speed limit signs.
Alderman Mihevc noted this is a difficult problem as there is so much going on in this
area and drivers have so much to be aware of while pedestrians are not crossing at just
the crosswalks
Chairperson Santi asked Director Schmitt to determine the cost for a flashing pedestrian
light in this area for future discussion by the Committee. He also suggested asking the
Police Department for their opinion on the best location to install such a device.
Alderman Glab said there should be a special pedestrian sign installed in the downtown
area.
4. Discussion regarding the Installation of "Radar Speed Signs.
Chairperson Santi asked Director Schmitt to present the item to the Committee.
Director Schmitt reported that Alderman Glab requested a Public Works Committee
discussion regarding the installation of radar speed signs. Staff received a quote from
Traffic Control & Protection for a Wanco pole mounted radar speed sign for $4,813.
Superintendent Schweda said he was researching alternatives that could be installed on
city poles.
Public Works Committee Meeting
Page 3
October 9, 2017
Director Schmitt informed the Committee the Police Department provided information on
the top three locations in the city with the most speeding complaints reported and they
are: Route 31 (Richmond Road) north of Pearl Street however permission from IDOT to
install signage along the roadway would have to be granted; Dartmoor Drive between
Curran and Crystal Lake Roads; and Anne Street between Front Street and Green Street.
As reported by IDOT, the average daily traffic on Dartmoor (a major collector street)
between Crystal Lake Road and Curran Road is approximately 2,500 vehicles. There
was no information for Anne Street however, Kane Avenue, a minor collector located
near Anne Street has an average daily traffic count of 850 vehicles.
Chairperson Santi noted that now that we have a development on the corner of Pearl
Street and Route 31, there would be more activity and residents in the area.
Alderman Glab reported that some of the residents in the Foxridge subdivision have
formed a Neighborhood Watch. Alderman Glab along with other residents met at Mr.
Locke's house and the subject of traffic on Dartmoor Drive was discussed. Alderman
Glab came up with the idea of flashing speed signs in McHenry as he had seen in other
communities. He asked staff to provide a price for the sign.
Mayor Jett stated the signs would be a great addition to the community. The signs are
expensive and before the city buys the signs we should make sure they are effective. The
residents on Dartmoor have noticed a significant reduction in speeding vehicles when a
speed trailer is placed in the area, but one sign controls only one direction. The speed
trailer is usually placed near the park but there are stop signs in the area. The flashing
speed sign reminds the average driver that they are over the limit and in most cases, they
will slow down.
The Committee began a discussion on where would be the most effective location to
install a flashing speed sign in the Foxridge neighborhood was discussed.
Alderman Glab is of the opinion that the sign should be placed shortly a$er vehicles enter
Dartmoor Drive off Crystal Lake Road.
Alderman Mihevc stated he agreed with most of what Alderman Glab said. He is of the
opinion that Dartmoor Drive is a top priority for this type of sign. He is certain staff has
done the best they could to obtain a fair price for the sign, which is expensive. If the city
is as sure as it can be that this type of signage is effective, we should purchase it.
Alderman Mihevc added a flashing speed sign also be installed on Lillian Street between
Route 31 and Crystal Lake Road and Green Street. The cost is high, but if they are
effective, it is worth the cost.
Chairperson Santi announced the quote received for the sign without mounting is $4,813
and asked the Committee if they were comfortable with installing one sign on Dartmoor
aI this time; which direction, and approximately where would it be installed. Director
Schmitt recommended westbound right off of Crystal Lake Road just prior to going down
the hill. As this sign would be mounted permanently, Director Schmitt would prefer to
speak to the residents who live where the sign would be installed to make sure they are in
agreement with the location. To purchase one sign now and try it first is what staff would
Public Works Committee Meeting
Page 4
October 9, 2017
recommend. This would also provide staff with time to determine what type of
maintenance the sign would require. As the next fiscal year nears and if the sign is
effective, there are funds available in the Street Division operating budget that could be
used to purchase two additional signs.
Chairperson Santi recognized city resident Terry Locke. Mr. Locked suggested reaching
out to the School District for some type of partnership to help pay for the signs.
Chairperson Santi said the Dartmoor sign makes sense. He then asked Director Schmitt
if the "Slow" pedestrian sign on Anne Street facing west is still there and Director
Schmitt answered yes, adding there is one sign heading east on Anne Street just past Dale
Avenue and another heading westbound right off of Green Street. There is also 25 mph
speed limit posted on each of the signs and on the section on Anne Street between Dale
Avenue and Route 31, two speed limit signs are posted.
Chairperson Santi asked the Committee for a consensus to move forward with directing
staff to purchase one flashing speed limit sign.
City resident Joan Sorenson suggested the sign be installed just west of Abbington near
the crosswalk on Dartmoor. Chairperson Santi thanked Ms. Sorenson for her input and
said staff would determine the most effective location to install the sign and it would
most likely be installed in that general vicinity.
Mr. Locke and Ms. Sorenson thanked the Committee for their time and existed the
meeting.
5. Discussion regarding Public Works 5-Year Capital Improvement Program
Chairperson Santi asked Director Schmitt to present this item to the Committee.
Director Schmitt presented the proposed 5-Year CIP to the Committee. The report
provides a general outlook on what is need to repair all roadways. At the next meeting in
November, a five-year street program plan and detailed list will be proposed to the
Committee.
Staff highlighted some of the projects recommended for funding in FY 2018/19. The
projects were ranked bypriority AUrgent — B Necessary — C Desirable — D Deferrable.
A parking lot maintenance plan was also provided to the Committee, which Director
Schmitt stated is a new plan and would be included in addition to the street program.
Director Schmitt presented a general overview of the projects noting "A" rankings were
given to projects with available federal funding:
Pearl Street/Lincoln Road Improvements Priority Ranking of A. STP funding of $1.5M
is expected in 2018. The city is required to leverage 20% of the cost to receive the
funding (approx. $800,000 from General Fund). Next week, the Council will be asked to
approve right -of --way acquisition for this project, which is required by IDOT just to begin
the final review.
Public Works Committee Meeting
Page 5
October 9, 2017
Ringwood Road Improvements Priority Ranking A. The city entered into a partnership
with Ringwood, Johnsburg, Spring Grove, and the McHenry Township Road District.
This project is scheduled to begin in 2018. STP funding of $1.5M was obtained and the
city's share is $53,000 from the General Fund.
Curran Road (formerlyper Road) S-Curve Safety Improvements Priority Ranking A.
This project was awarded $450,000 in HSIP funding. Staff is of the opinion that this
project will not begin in 2018 due to negotiations with the Army Corps of Engineers.
Project Engineer Strange reported the four slopes coming off the main line pavement
pushed our grading slightly into wetlands so we need to obtain environmental clearances
to allow the city to build slopes in the wetlands. Director Schmitt added the $35,000 in
the budget for this project is for Phase II Engineering and unlike STP, funding the city's
share would be paid from HSIP, which is $3,500.
Street Progxam Priority Ranking A. Ballpark estimate for the next five years to pave
roads in need is in excess of $45M. Staff proposes to bring a plan to the Committee in
November for discussion with a list of proposed streets ranked by priority need. Roads
will be grouped to save on mobilization costs. The Project Engineer and Director are of
the opinion that the method used this year was extremely cost-effective due to low
mobilization.
Chairperson Santi noted this is a huge cost and the Council will have to do the best it can
to do as much as possible within the limits of city funding.
Alderman Glab asked for the definition of a rumble strip as referred to in the Curran
Road project description. Project Engineer Strange said it refers to the roughly graded
area outside the white line that makes you aware your vehicle is crossing the line.
Pavement Maintenance —Crack Sealing &Reclamite Priority Ranking_A. Director
Schmitt reported the city is up-to-date with crack sealing so only reclamite is
recommended in 2018. As the roads age, crack sealing will be performed again.
Reclamite will be done on newly paved roads.
Alderman Glab asked if it was effective to use reclamite on roads that are 10-years old
and Director Schmitt answered, it is recommended to apply reclamite to roads within
three years of paving or seven years from the first application. It is not recommended
after the second application, which is when crack sealing would be performed.
Superintendent Schweda added reclamite is used to delay the need for crack sealing.
Alderman Glab said he does not think the city does enough crack sealing and asked if the
city is going to have many roads throughout town that look like Front Royal before it was
restored. He is concerned that all the streets that were resurfaced in 1999 or 2000 are
going to start to deteriorate.
Chairperson Santi noted the city should be as aggressive as possible when funding the
street program, within the funds available. Alderman Glab suggested that the Committee
make a statement for the record and asked if this should be discussed with the full
Council. Chairperson Santi noted a letter could be drafted to the full Council or a
Public Works Committee Meeting
Page 6
October 9, 2017
Committee of the Whole meeting could be scheduled for this discussion.
Sidewalk Program Priority Ranking A. Staff recognizes the need for a sidewalk program.
Staff recommends funding this program again at $75,000 for the next five years.
Bull Valley road Bike Path Extension Phase I En ing Bering, Priority Ranking A. The final
link of the bike trail between Moraine Hills and the Prairie Path is the section on Bull
Valley Road between Route 31 and west of the railroad tracks. The County would like to
partner with the city on this project and seek Federal funding. Staff is recommending
funding Phase 1 Engineering.
Green Street Bridge Rehabilitation Priority Ranking A. This project includes sidewalk
replacement, new hangers for the water main, bridge deck replacement, and minor
structural repairs including rehabbing the railings.
Medical Center Street Li _ ting Priority Ranking B. This project is new to the CIP.
Director Schmitt reported there have been issues with the lights on Medical Center
Complex on Lawrence Parkway, Medical Center Drive, and Centegra Drive. Currently
one light fell over because the base rusted -out and it is now out of service. These lights
were installed when the hospital was constructed. Upon inspection, staff discovered other
lights that are also failing. The city accepted all the public improvements in this area.
Alderman Glab said he wanted his opinion in the record that the city was hoodwinked
into accepting these improvements.
Tree Replacement Program Priority Ranking_B. The city has spent $180,000 in the last
two years replacing trees lost to the Emerald Ash Borer through an IGA with McHenry
County. This was a difficult program to manage due to maintenance of the new trees. To
bring the program down to a more manageable project, staff recommends funding
$25,000 for the next five years. Superintendent Schweda noted the trees have a one-year
warranty. Alderman Glab said the only complaint he has received about the new trees is
that they are not watered enough. Director Schmitt stated there are still quite a few right-
of-ways where trees were removed due to the Emerald Ash Borer and locations that still
require tree removal. Alderman Glab asked for locations that were hit the hardest by the
infestation. Director Schmitt stated Olde Mill Ponds Pebble Creek, and City Parks.
Alderman Glab said if we are replacing trees every year, how much staff time are we
taking up with these trees. Superintendent Schweda said tree planting is contracted.
Other Future CIP Items include Dartmoor
31/Veterans Parkway Traffic Signal.
Road Bridge Wearing Surface and Route
Stormwater Drainage FY 18/19 Requested Project, Ranking_A. In 2018, the Central
Avenue Storm Sewer is requested at $270,000 is a localized flooding problem. Also,
Ramble Road Storm Sewer funding for at $50,000 in FY 18/19 for property acquisition
with construction in FY 19/20. Alderman Glab said we had looked at soil conditions in
this area and he has had discussions with a developer who looked at the two lots on the
corner of Ramble and Home who said it was all infill and asked if this will make a
difference. Project Engineer Strange answered it would be all cut and we would just need
the volume to store it so what is filling it in would not necessarily matter that much as far
as our ability to create the necessary volume. Alderman Glab said we need to know how
Public Works Committee Meeting
Page 7
October 9, 2017
many cubic feet those lots will hold versus now many we need them to hold and added in
his opinion the best solution is pumping the water in and out of the intersection to install
a sewer at a higher elevation with a big pitch. Project Strange stated this estimate for
project funding includes upsizing the storm sewer that drains the area out and aligning it
to the Lakeland Park drainage so it is really two fold. Alderman Glab said upsizing it is
not the solution and the city needs to looks at more than just adding detention. Project
Engineer Strange told the Committee that the modeling used in the project would be
reconfirmed in the design process prior to moving forward with the project.
Chairperson Santi said this is a unique area and this project is finally moving forward to
solve problems in this neighborhood.
Alderman Glab stated the city has limited amounts of money to spend and he wants to
make sure that the city's spends the money as responsibly as possible.
Street Division:
Motor Pool/Equipment Priority Ranking A. The need for Street Division vehicles in FY
18/19 is $830,000. Staff is aware the entire amount will not be funded however, it is
what the city needs and would be funded through the General Fund.
Public Works Facility Priority Ranking B. Director Schmitt stated this project is new to
the CIP. Currently, all equipment and vehicles are fueled by Petro Choice located in
town. Petro Choice has had some recent issues with tanks and pumps forcing the
department to use a temporary fueling system setup at the Public Work facility. This
lasted approximately eight weeks. Director Schmitt recommends considering an option
to setup the city's own fueling station. It may be cost-effective to purchase the fuel in
bulk. The cost to complete this project is estimated to be $85,000 from the General Fund.
Water Division:
Water Division —Water Meter Replacement Priority Ranking_A. The department will
request $410,000 from the Water/Sewer Fund for this project. Some of the meters with
drive -by technology are past their life expectancy and new batteries are no longer
available for these models.
Well # 8 Raw Water Line Rehab Priority Ranking A. This has been an ongoing problem.
The well is located on Malibu Court and feeds Water Plant #3 on the corner of Crystal
Lake Road and Malibu Court. Several leaks in the line have occurred as recently as two
weeks ago. All valve joints are failing. Staff recommends a new technology called to
rehab the watermain pipe lining similar to what is done to sanitary sewer lines. Estimated
cost from the Water/Sewer Fund is $220,000.
Well Inspection/Maintenance &Repair Priority Ranking A. This is another project that
we did not fund this year but have in the past. Ongoing well inspection, maintenance,
and repair to keep ahead of the system instead of waiting for a valve to fail. This project
is estimated to cost $30,000 from the Water/Sewer Fund.
Public Works Committee Meeting
Page 8
October 9, 2017
Water Treatment Plant #4 Maintenance Priority Ranking A. The control panel needs to
be upgraded for the cost of $25,000 from the Water/Sewer Fund.
Scada Server Upgrade Priority Ranking A. This system was originally installed in 2003
and need to be updated. $40,000 from the Water/Sewer Fund,
Water Tower Maintenance &Repair Priority Ranking A. Paint failure is occurring at
Water Tower #4 located at Crystal Lake and Bull Valley Roads for the cost of $400,000
from the Water/Sewer Fund. Superintendent Palmer explained the finish coat is
delaminating from the intermediate coat. Chairperson Santi asked if this was a
maintenance program only for Tower #4. Superintendent Palmer answered this is the
largest tower and due to premature failures is should be repainted.
Water Division Motor Pool Replacement Priority Ranking B. Replacement of Water
Division motor pool vehicles is proposed throughout the five-year CIP for a total five-
year cost of $145,000,
UtiliTy Division:
Update Master Utility Plan Priority Ranking B. To bring all the information together in
one updated Master Utility Plan would serve to prioritize future projects and objectives in
current and future timetables. This project would cost $50,000 in FY 2018/190
Pearl Street/Lincoln Road Sewer Stub Extensions Priority Ranking A. This expense was
included in bid plans for the Pearl Street/Lincoln Road Improvements. The total cost is
$425,000 and funded through Water/Sewer revenues, which would be recaptured through
annexation agreements.
Water Main Replacement Program Priority Ranking_B. The five year expected cost for
this project is $1,650,000 with $500,000 in FY 18/19 paid through Water/Sewer
revenues.
Sanitary Sewer Main and Manhole Rehab Pro�am Priority Ranking B. $270,000 was
spent this year for this program. The program is successful and staff recommends
maintaining it over the next five years for a total cost of $800,000 paid through
Water/Sewer revenues.
Utility Division Sewer Camera Addition Priority Ranking B. Staff is requested $55,000
for this project in FY 18/19.
Utility Division Motor Pool Replacement Priority Ranking B. Staff recommends
including $110,000 in the CIP for FY 19/20.
Wastewater Division:
Willow Lift Station Pump Replacement Priority Ranking A. Staff recommends $40,000
in FY 18/19 to replace the raw sewage pumps at the Willow venue Lift Station. Several
of the parts are no longer in stock and would have to be custom made. The cost quoted
us to replace with new pumps.
Public Works Conunittee Meeting
Page 9
October 9, 2017
Millstream Lift Station Rehabilitation & Sewer Main Relocation Priority Ranking A.
Staff recommends $1,900,000 in FY 18/19 to eliminate on lift station and relocate the
sewer main by increasing the size of the Millstream Avenue Lift Station.
CWWTP Demolition Priority. Ranking A. Staff recommends $2,2505000 in FY 18/19 for
the demolition of the Central Wastewater Treatment Plant. IEPA regulations state the
Central Plant cannot be demolished until one year after the South Plant is completed and
operating in compliance. However, there is no required timeline by which the facility
must be demolished and it is hoped that this would coincide with private redevelopment
of the site. On March 3, 2014, the Council approved a PSA with HR Green for
$1,325,188 for this project of which $20,000 has been earmarked for Central Plant
demolition engineering.
Sewer Division Motor Pool Replacement Priority Ranking B. Staff recommends $65,000
in FY 18/19 to replace pickup truck #626, a 2002 Chevy Silverado with a plow, trailer
hitch and other equipment/accessories.
Director Schmitt concluded his presentation of FY 18/19 CIP recommended projects.
Chairperson Santi stated much information was presented this evening and urged the
Committee to ask their questions or provide their comments to staff tonight or as soon as
possible. Chairperson Santi informed the Committee that he previously discussed some
projects with Director Schmitt prior to the meeting regarding the Pearl/Lincoln Road
project, which is expected to be funded although it is not confirmed at this time.
Chairperson Santi stated he agrees with Alderman Glab that Lakeland Park drainage is a
major issue and he is pleased that the city is moving forward with this project.
Chairperson Santi acknowledged Mayor Jett understands the need for this project.
Chairperson Santi asked the committee for comments:
Alderman Mihevc thanked Director Schmitt for the comprehensive plan and stated he
will have questions for Director Schmitt after he has had a chance to review the
information. Alderman Mihevc asked for a summary and timing for the approval process
for these items. Director Schmitt stated the CIP is due to City Administration by
November 17. The citywide CIP is then developed and presented to the Finance and
Personnel Committee to determine availability of funding prior to presentation to the full
City Council with a Committee recommendation. Projects will be prioritized based on
attached federal funding and need, i.e. the Road Resurfacing Program and Lakeland Park
Drainage projects.
Chairperson Santi added the CIP is anever-ending document and is reviewed annually.
Alderman Glab stated there are many more issues that should be looked at including
Boone Creek and Boone Lagoon. Alderman Glab asked Director Schmitt to find out,
which is higher in elevation, Boone Lagoon or Lakeland Park drainage -way. Alderman
'lab stated in his opinion the dam that was constructed in 1978 in the creek along
Oakwood Drive for collecting silt no longer functions because it was never dredged or
Public Works Committee Meeting
Page 10
October 9, 2017
maintained regularly. The small lake along Oakwood has filled in over the years and is
now very shallow, adding increased communication is allowing the city to realize what
problems need to be solved.
Chairperson Sant i asked Alderman Glab if he had ever asked former Director Batt about
the dam. Alderman Glab answered yes, and he had discussions with the sitting Mayor
when the dam was constructed. Another issue is that the Army Corps of Engineers was
never notified of the dam. There are drainage issues that remain unresolved throughout
the city and it seems like the city is only focusing on Lakeland Park and not the rest of
the city.
6. Committee Comments:
Chairperson Santi asked for comments from the Committee.
Alderman Glab stated in his opinion, within the next 10 years, something needs to be
done with the Boone Creek and Boone Lagoon drainage -ways and, should be looked at
with the Lakeland Park drainage as it is all tied together and is one system. Whenever
downtown revitalization or the Riverwalk is discussed, dredging Boone Lagoon is always
brought up yet the city has done nothing. Alderman Glab further stated he could not
support dredging Boone Lagoon without looking at the problems that have caused the
need to dredge Boone Lagoon and what the city could do so this does not reoccur. In
approximately 1975, the city purchased a dredger and dredged a channel in McCullom
Lake 20 feet deep from old Lakeland Park Beach to Spojnia however it only lasted a
couple of years before it filled in that is why we need to find out why things happen so
we can correct them.
Chairperson Santi noted this would be a long and involved process but should be done at
some point. As an Alderman, he feels the city is moving in the right direction with some
key projects that are finally moving forward.
Alderman Glab said the Finance and Personnel Committee needs to be aware of these
projects so they can find the funding to support them.
7. Motion to Adiourn.
There being no further comments from the Committee, Chairperson Santi called for a
motion to adjourn the meeting.
Alderman Glab made a motion, seconded by Alderman Mihevc to adjourn the meeting.
Chairperson Santi asked the Clerk to call the roll:
Aye: Glab, Mihevc, Santi
Motion carried.
The meeting adjourned at 8:30 PM.
Public Works Committee Meeting
Page 11
October 9, 2017
Respectfully submitted,
Marci Geraghty, Executive Assist/Deputy Clerk
Reviewed and approved this OVrl
H day of
Alderman