R E V I S I O N
REGULAR CITY COUNCIL MEETING AGENDA
Monday, June 2, 2003, 7:30 P.M.
1. Call to Order
2. Roll Call
3. Pledge of Allegiance
4. Presentation Honoring McHenry Police and McHenry Township Fire Protection District
5. Public Input Session – 10 Minute Limitation
6. Consent Agenda:
Special Use/Picnic Permit Requests;
Block Party Requests;
Request to Advertise for Requests for Qualifications (RFQ) - Fireworks Display Contract for
Services;
Final Payment - D.L. Franzen, Excavation/Aggregate Work, Petersen Park Waterfront
Improvements $19,918.66;
Final Payment - Custom Landscaping, Sod Installation, Petersen Park Waterfront Improvements
$7,752;
Parks & Recreation Department - request to purchase Risograph RN 2030 Digital Duplicator from
Integra Business Systems not to exceed $5,995
7. Request for Fence Variance from James & Valeria Sieman, 2101 Hazelwood Drive
8. Request for Fence Variance from Mario Fiorita, 4716 Joyce Lane
9. Request for Fence Variance from Mario & Maliea Penuela, 4720 Joyce Lane
10. Request for Annexation, Rezoning, and Use Variance – Concetta Arcuri, 2905 W. Route 120
11. Request for Preliminary and Final Plat Approval, Expansion of existing Conditional Use Permit,
and Variances - Jeff Kleinhans, 2911 and 2913 West Route 120
12. Request to Connect to Municipal Sanitary Sewer System – Patricia Bour, 1902 Orchard Beach
Road
13. Recommendation to enter into an Engineering Services Agreement with Baxter & Woodman,
Inc. for the Overflow Storm Sewer in Olde Mill Ponds Subdivision not to exceed $9,700
14. Request for Expansion of an existing Conditional Use Permit from McHenry Lube Express, 5200
W. Elm Street
15. Request for a Conditional Use Permit from Boncosky Oil Co., 4712 Bull Valley Road
16. Recommendation approve the Engineering Services Agreement with Smith Engineering
Consultants, Inc. for Freund Field Phase III Improvements not to exceed $11,996.40
17. Recommendation to approve the Engineering Services Agreement with Baxter & Woodman for
the Waukegan Road/Water Main Improvements in an amount not to exceed $18,400
18. Ordinance granting a Use Variance from Paul DeCarlo, 5016 West Elm Street
19. Request for Addendum No. 3 from Smith Engineering Consultants, Inc. for additional services
performed relating to the McCullom Lake Road/Route 31 Intersection Improvements Project not
to exceed $68,299
20. Mayor – Statement and Reports
21. Committee Reports
22. Department Head Reports
23. New Business
24. Executive Session: Personnel
25. Adjournment
Posted and Mailed: May 30, 2003
C O N S E N T A G E N D A
The Consent Agenda for the June 2, 2003 City Council meeting consists of the
following items:
Special Use/Picnic Permit Requests;
Block Party Requests;
Request to Advertise for Requests for Qualifications (RFQ) - Fireworks Display Contract for Services;
Final Payment - D.L. Franzen, Excavation/Aggregate Work, Petersen Park Waterfront Improvements
$19,918.66;
Final Payment - Custom Landscaping, Sod Installation, Petersen Park Waterfront Improvements
$7,752;
Parks & Recreation Department - request to purchase Risograph RN 2030 Digital Duplicator from
Integra Business Systems not to exceed $5,995
Attachments
PRESENTATION
TO: Mayor and City Council
FROM: Douglas K. Maxeiner, City Administrator
FOR: June 2, 2003 Regular City Council Meeting
Representatives from the McHenry Police Department and McHenry Township Fire
Protection District will be in attendance to present Letters of Commendation to
McHenry Police Officers, Sgt. John Jones, Officer Dan Kreassig, and Officer Larry
Popp and McHenry Firefighters and Rescue Personnel for conduct above and beyond
the call of duty while rescuing the Pakula Family during their house fire that occurred on
May 14, 2003 at 5508 Chasefield Circle.
In addition to the Police Officers and Fire/Rescue personnel, Mr. & Mrs. Pakula will be in
attendance along with their neighbors, Sean Hough and Bryan Buellesbach who also
assisted in the safe removal of the Pakula’s children.
AGENDA SUPPLEMENT
TO: Mayor and City Council
FROM: Daniel J. Marcinko, Director of Public Works
FOR: June 2, 2003 Regular City Council Meeting
RE: Waukegan Road/Water Main Improvements
ATTACHMENT: Engineering Services Agreement
RECOMMENDATION: Approve the attached Engineering Services Agreement with
Baxter & Woodman, Inc. for Waukegan Road/Water Main Improvements relating to the
Riverwalk Place Townhome Development in an amount not to exceed $18,400.
Background:
At its January 20, 2003 meeting, the City Council approved conceptual plans for the Riverwalk Place
Townhome Development. As part of the Developer Agreement, the city will make various
infrastructure improvements within the Waukegan Road right-of-way in anticipation of the
development. As a point of information, it was anticipated that these improvements would have to
be made in the next several years. Attached is a copy of an Engineering Services Agreement for the
design of the following improvements on Waukegan Road:
1. Reconstruction and widening of Waukegan Road to 27-feet and the installation of curb and
gutter along the north and south sides of Waukegan Road;
2. Installation of storm sewer main and service laterals to the proposed Riverwalk Place
Townhomes development;
3. Restoration of right-of-way disturbed by construction and the relocation or replacement of
existing trees; and
4. Replacement of approximately 1,630-lineal feet of water main along Waukegan Road from
Green Street to the Central Wastewater Treatment Plant.
Recommendation:
It is recommended that the City Council approve the execution of the attached Engineering Services
Agreement with Baxter & Woodman for the Waukegan Road/Water Main Improvements in an
amount not to exceed $18,400.
AGENDA SUPPLEMENT
To: Mayor and City Council
From: Pete Merkel, Director of Parks & Recreation
For: June 2, 2003 City Council Meeting
Committee Recommendation: To approve the Engineering Services Agreement
with Smith Engineering Consultants, Inc. for contract plans and specifications for
Phase III Improvements at Freund Field. The total for engineering services as
proposed is $11,996.40.
Background
Smith Engineering Consultants, Inc. has submitted an Engineering Services Agreement
to prepare plans and specifications for the Phase III Improvements at Freund Field.
It is anticipated that City Council will be asked to approve the advertisement for bids
in the summer; work will begin on the parking lot and ball field renovations in the fall;
and final landscaping to be installed in spring 2004.
This project is included in the FY 2003-04 budget for the amount of $135,000.
Committee Recommendation
A recommendation was made at the May 15, 2003 Parks and Recreation Committee to
forward the engineering services agreement to the City Council for action.
/PM/klq
/Pete/Agenda Supplement/FF Phase III Plans
AGENDA SUPPLEMENT
TO: Mayor and City Council
FROM: Daniel J. Marcinko, Director of Public Works
FOR: June 2, 2003 Regular City Council Meeting
RE: McCullom Lake Road and Illinois Route 31 Road Widening
RECOMMENDATION: To authorize the Mayor to execute Addendum #3 in the amount of
$68,299 to Smith Engineering’s contract for this project bringing the total engineering design
contract to $315,303.29.
ATTACHMENTS: Contract outlining the additional scope of work, direct costs and fees.
Background: Smith Engineering is in the final stages of roadway design for the Route
31/McCullom Lake Roadway improvement. Since the inception of this project, the project
limits, complexity and scope have expanded. Originally, the total project cost was estimated at
$2.2 million with constructions costs totaling $1.8 million. Smith’s original fees for engineering
were $130,705 or 7.3% of construction costs. The scope of the project has increased
considerably with changes in construction standards and right-of-way acquisition. Currently, the
project is expected to total $3.3 million with construction costs amounting to $2.8 million.
Fortunately, funding contributions from outside sources have increased as well. The original grant
from the Council of Mayors totaled $520,000. Since then, the Council of Mayors has increased the
federal contribution to $1.0 million, a CMAQ (Congestion Mitigation Air Quality) grant is adding
$312,400, an Illinois First Grant has been obtained totaling $750,000, and IDOT has provided a
probable commitment of $660,000. In total, grants for this project are expected to total $2.723
million.
Smith Engineering has previously requested and received City approval for two addenda to the
original contract. The first addendum, totaling $97,358.14, is to perform the necessary right-of-way
acquisition work which consists of determining the additional ROW needed, the required appraisals
of the property to be acquired, negotiations with property owners and the coordination of the
acquisition process. The second addendum, amounting to $18,941.00, is to revise plans to account
for additional work due to extended project limits and signal interconnections requested by IDOT.
The reasons for this third addendum are spelled out in a letter from Smith Engineering dated March
31, 2003 and in Exhibit A to the addendum agreement.
Analysis: The current engineering fee, including the two approved addendums and this third
requested addendum, is 11.3% of the revised construction cost of $2.8 million. In addition to the
increase in the project’s scope, the complexity has also increased. Exhibit B details the history of
engineering and construction costs of this project.
Recommendation: In order for Smith to recoup the additional expenses incurred, staff requests
approval of addenda #3 in the amount of $68,299.
AGENDA SUPPLEMENT
TO: Mayor and City Council
FROM: Daniel J. Marcinko, Director of Public Works
FOR: June 2, 2003 Regular City Council Meeting
RE: North Interceptor Sewer Project
ATTACHMENTS: Baxter & Woodman Change Order and recommendation for approval for
payment.
Background: Bids for the North Interceptor Sewer Project were opened in July of 2001 and the
City Council awarded the contract to George W. Kennedy Construction in the amount of
$2,598,707.20. The contract included three parts: Part A covered the actual interceptor sewer;
Part B called for extending a water main from the City Limits to McCullom Lake Road on
Riverside Drive; and, Part C entailed the reconstruction of Riverside Drive. The project began in
August of 2001 with a scheduled substantial completion date of November 1, 2001 and a target
final completion date of May 2, 2002.
As the City Council is aware, this project had numerous challenges and obstacles for the
contractor and the City, which in turn added financial burden to the project. Some of these
challenges are as follows:
Township improvements: the township provided the material and the City
absorbed the labor cost for the installation of drainage improvements
Unforeseen conditions through Timber Trails subdivision (floating of the sanitary
sewer main) had an estimated cost of $100,000 which the contractor submitted
actual costs of approx. $48,000.00
Underground utilities through the Timber Trails Subdivision $40,000.
Poor soils conditions under Riverside Drive $19,500.
Shared costs in overlaying Court Street from Pine Street to the dead end of Court
Street.
Analysis: George W. Kennedy Inc. has submitted their final invoice for the North Interceptor
Sewer Project. The final construction cost was $290,463.85 higher than the original bid amount,
which reflects an 11.1% increase. The typical contingency allowance for construction costs on a
project of this magnitude is between 9 and 12 percent. Due to the complexities surrounding the
project, the 11.1% increase is well within an acceptable level.
The original contract and the subsequent changes are as follows:
Original contract price $2,598,707.20
Change Order No. 1 (change in the unit prices: no dollar change)
Change Order No. 2 (Riverside Dr.) 19,262.44
Change Order No. 3 (Final unit quantities) 271,201.41
Final Cost of Construction: $2,889,171.05
In an effort to avoid liquidated damages, the contractor has absorbed numerous changes to the
contract and has provided exceptional service to the City of McHenry. Some of the costs that
were absorbed were the service line at Broad Street and Riverside Drive, 50% of the cost of
paving Court Street, removal and replacement of the curb and gutter on Riverside Drive and
numerous residential landscape concerns within the project. The contractor also had an excellent
response time to the unfortunate sanitary sewer backup on Riverside Drive. With the exception
of one outstanding claim, the contractor has addressed all of the residential sewer back-ups on
Riverside Drive.
It is the opinion of Public Works and Baxter and Woodman that George W. Kennedy
Construction Company has performed to the highest level of production that could have been
expected under these project conditions. It is obvious from the above that the contractual
deadline for substantial completion of November 1, 2001 was unrealistic. This would also make
the May 2, 2002 deadline for final completion unattainable. As a result of the situations and
conditions encountered with this project, staff is proposing that the contractual deadlines for the
project are revised to reflect the final substantial completion of the work on Riverside Drive for
September 15, 2002 and the final project completion date of November 1, 2002.
Recommendation: Staff recommends approval of change order #3 and to authorize the final
payment to George W. Kennedy Construction Company, Inc., in an amount, not to exceed
$83,147.85 for the North Interceptor Sewer Project bringing the cumulative payout on this
project to $2,889,171.05.