Loading...
HomeMy WebLinkAboutPacket - 09/08/2010 - Parks and Recreation Committee AGENDA Parks & Recreation Committee Meeting Wednesday, September 8, 2010 McHenry Municipal Center 7:00 pm Alderman's Conference Room 1. Public Input—5 Minute Total 2. McHenry Zone Skate Park/Wooden Ramp Renovation 3. Review of Fort McHenry Proposed Improvements 4. Petersen Park Ball Field Fencing Renovation/Specifications 5. Reports To Committee A. McCullom Lake Milfoil Treatment Costs 6. New Business Next Meeting: Wednesday, November 10, 2010 AGENDA ITEM 2 McHenry Zone Skate Park/Wooden Ramp Renovation Proposals were solicited to several manufacturers of modular skate park ramps and apparatus for the renovation of the wooden ramp section of the Skate Park. Proposals were to be separated by three different budgets of$50,000, $75,000 and $100,000. Companies were instructed to submit proposals that would illustrate a creative design using a modular pre-fabricated system that would feature ramps and a variety of urban street features. Three companies submitted proposals for a variety of materials, designs and a list of installations in the Chicago/Milwaukee area. 1) Ramparts Skate Park Systems—Canada, Rep.Team Reil, Union, IL 2) Spohn Ranch Skate Parks, Inc. —Industry, CA 3) American Ramp Company,Joplin, MO Several designs were presented in the three budget options. Attached is a copy of the original request for proposals and some sample designs. Additional large design drawings will be presented at the committee meeting. The committee can discuss the size, scope, and anticipated budget for this renovation project. A committee recommendation on the project budget can be forwarded to the Finance Committee for the FY 2011-12 Park Developer Donation funding. Once the project budget has been established staff can proceed to work with potential vendors on a final design and costs. All vendors have submitted a list of references and nearby facilities for our review. We would be interested in researching the following: - Durability and quality of product - Maintenance issues experienced by local communities - Installation and customer service experience of the communities who have purchased equipment - Availability and follow up service on replacement parts. Attachments: - McHenry Zone Skate Park Renovation—RFP - Samples of Skate Park Design Proposals G PROPOSAL O. 'McHenry Zone Skate Park Contents Cl A LETTER OF INTRODUCTION 5 PRO UFSIGN:3928 6 PRO DESIGN :%4069 10 PRO DESIGN=t1609 13 PRO SERIES 18 PROJECT REFERENCES 20 bVARRANTY X MAINTENANCE 24 INSURANCE CERTIFICATES 26 REPLICA SERIES 28 ARC SUSTAINAE,IE PRACTICES 30 .I � .: es77 n st enr b60 Groetirr s from American Ramp Company, We are very excited for the opportunity to present a proposal for the renovation of the McHenry IL skatepork.American Ramp Company is the largest skatepark provider in the world,with over 100parks installed throughout 20 different countries. ARC has grown,literally out of a garage,to become the premier skatepark provider and the only skatepork company to Offer every build method.We are a skater awned and operated company whose only focus is building skateparks. Because we offer every skatepark build method we can present several options for your project.Our proposal includes three of our different product lines,Pro Series(all steel),X-Series(steel frame with skotelite surface)and our Solo Series (pre-cast concrete).We have included separate designs and catalogs for each build option.We did not Include on option for our Stealth Series,which is wood framed with a skotelite surface,as we understood the plan was to get away from the maintenance associated with outdoor wood ramps.Having all build options available puts us In a unique unbiased position, since we can present the positives and negatives regarding each build method,we are able to educate rather than sell our customers.This means in the end our customers are informed and feel comfortable they are picking the right skatepark build option for their project. This proposal catalog contains three different designs in the specified budgets,technical Information and project references for our Pro Series ramps.The Pro Series is a municipal favorite because it is virtually maintenance free and is backed by an industry leading 20 year warranty.Because the Pro Series is constructed using 7 gouge galvanized steel and contains no fasteners in the riding surface,and has no separate transition plate,there is really nothing to maintain.As you know bolts or screws in the riding surface create the potential for a lot of maintenance since these fasteners must be tightened from time to time.This smooth riding surface is also favored among skaters since they experience a smooth ride without having to deal with rolling over fasteners throughout the romp.Every skatepark that we build comes backed by our industry leading war- runty and all of our customers become additionally insured under our$1,000,000 in professional liability and$10,000,000 in product liability policies.These coverages have become the standard for professional skatepark developments and it is imperative that your builder extends them to your city. All of the designs we have included were created by skaters/professional skatepark designers,we feel these layouts would j be great for your project but our proposal also includes us altering the design if requested.If the skaters/bikers want to see things changed in any of the designs we are offering to do an onsite design meeting to come up with a layout that is devel- oped by the local users. As a skater owned and operated company we do all of our business factory direct,this approach allows our customers to deal directly with the experts and cuts out the 20-30%commissions that are tacked on by a local playground rep.This fac- tory direct relationship also means that you work directly with a skatepark specialist for all of your needs,before during and after the project is complete.We know how exciting it is to open a new skatepark facility and we want to help make that grand opening as big a success as possible.We want to offer McHenry a free Grand Opening Package,including give- a-ways and prizes like t-shirts,stickers,skateboard decks and so on.American Ramp Company has built many parks in the Chicago/Milwaukee metro area and we hope to add McHenry to that list. Please let me know if you have any questions. Thank You, Nathan Bemo President/Own er/Skatoboe rde r/D esig n e r American Ramp Company \fie ��r- J'� •'Y- 5 PRO Design 1 - NAM V \� e f 4 o, l � 'X k _�tiaiias ` n ' W v� � i < I ' I 6B91# u61sap pac � f I r, i j m n u, Z 0 V) w Y _� Ln 1 �1 �J l� 1. Z i nr � Cl 0 Y Ln r 1 L, z _ w o i I SPOHN RANCH I Proposal for Supply and Installation of Skatepark Equipment Prepared for:City of McHenry,Illinois i Prepared by:Spohn Ranch Skateparks,Inc. In .'� �;' �, �"•�;� ' Friday,August 20,2010 August 20,2010 City of McHenry,Illinois City Clerks Office 333 S.Green Street McHenry,IL 60050 I 1 RE: REQUEST FOR PROPOSALS—SKATEPARK RENOVATION Spohn Ranch would like to thank you for the opportunity to present this proposal for the renovation of the wooden ramp section of the McHenry Zone Skatepark. We were the first to create standards for skateparks when we designed and built the competition courses for the X-Games and other high-profile events. Since helping catapult skateboarding and action sports into the mainstream with the X-Games,we have continued to innovate and re-define the boundaries of skatepark construction and design. After becoming the nation's first licensed and bonded municipal skatepark builder in 1992,the Spohn Ranch family has helped create over 1,000 successful skateparks across the globe. These parks include the full range of facilities,from neighborhood skate spots to nationally-recognized destination skateparks and award-winning art installations. In our 18+years of business,we have consistently stood behind our products and developed the broadest range of experience and methodology in the industry. With expertise in specialty concrete skatepark construction and three distinct ramp systems,Spohn Ranch possesses a diverse set of tools that enable us to consistently find the best solution for every community we work with.Our commitment to the Midwest action sports scene is evident in our superior reputation and portfolio of 50+parks in Illinois and its neighboring states. With a professional work-ethic and a relentless dedication to quality,we are confident that we can help in making McHenrys skatepark a source of pride for decades to come. Our advanced construction techniques and well-staffed field crews guarantee that your project will be completed on schedule and within the stated budget. Our unparalleled level of experience and a flawless execution will ensure your park is finished with the highest of quality and the most stringent of construction standards. Thank you for taking the time to consider our firm for the renovation of your skatepark. i Sincerely yours, Kirsten Bradford,CE Spohn Ranch,Inc. IG 15131 Clark Ave. Industry,CA 91745 626-330-5803 x203 Kirsten@soohnranch.com 1 r PON" ow" PREM mm" W� i VdwLgLsfiffie. option 1 1j =sran ■er.rr s..r■n■;r-llW3l Clot b■.!ri■•(ry.er 91M-Pr.sze_sar.sns-FOX G2GA36.55ea-VAVWAr•rr.■■er.e._-uu�.rar■■eLLu� Sao 4e�ETE TrueRldu I HaBW MC HENRY, IL SKATEPARK PROPOSAL - 10-2025-IN-ITS wkueRide. 10-2026-IN-ITS 1 Half Pipe(Left) 4.0' 4' 30' 2 Half Pipe(Center) 4.0' 4' 30' 3 Half Pipe(Right) 4.0' 4' 30' 4 Radius Wedge 4.0' 4' 13' 5 Radius Wedge 4.0' 4' 13' 6 Radius Wedge 4.0' 4' 13' 7 Wedge,Flat,Wedge 2.0' 4' 18, 8 Grind Rail,Kinked(Round) 1.5' 2" 12' 9 Spine 3' 4' 13' 10 Spine 3' 4' 13' 11 Jump Box 2.0' 4' 1T 12 Quarter Pipe 4' 4' 11' 13 Quarter Pipe 4' 4' 11' 14 Quarter Pipe 4' 4' 11' 15 Grind Box,Flat 1.0' 4' 8' 16 Grind Rail,Curved(Round) 1.0' 2" 14' 17 Skate Bench 1.5' 1' 8' 18 Grind Box,Raked 8"-22" 4' 8' 19 Jersey Skate Barrier 2.5' 4' 4' 20 Jersey Skate Barrier 2.5' 4' 4' 21 Grind Rail,Kinked(Square) V-1.5' 2" 16' C 22 Grind Rail(Launch) 0-1.5' 2" 6' _ TOTAL SKATE ELEMENTS $44,369.63 I INSTALLATION,NOT INCLUDING PREVAILING WAGE $4,436.96 L SHIPPING $1,050.00 GRAND TOTAL $49,856.60 phone 87.7489-3539—fax M6-330.5803—w spohnranchxom—info@apohnrench,eom 15131 B Clark Ave.City of Industry,CA 91745 ]IF Ira X SuTEEL option 2 __ _ ANC 2ooe Stetewerk SOottr6C T�I tCTrueRide I HIBM MC HENRY, IL SKATEPARK PROPOSAL - 10-2025-IN-2TS rueRide, 10-2025-IN-2TS 1 Half Pipe(Left) 4' 4' 30' 2 Half Pipe(Center) 4' 4' 30' 3 Half Pipe(Center) 4' 4' 30' 4 Half Pipe(Right) 4' 4' 30' 5 Grind Rail,(Square) 1' 2" 12' 6 Bank Ramp(Left) 4.0' 4' 13, 7 Bank Ramp(Center) 4.0' 4' 13. 8 Bank Ramp(Center) 4.0' 4' 13' 9 Bank Ramp(Right) 4.0' 4' 13' 10 Grind Box,Flat 8" 4' 6' 11 Raked Maual Pad 9"-20" 4' 16' 12 Flat,Transition 2.0' 4' 11' 13 Grind Rail(Round) 1.0' 2" 6' 14 Wedge,Flat,Wedge 2.0' 4' 18' 15 Planter,Double Kink(2'wide) 3.0' 2' 17' 16 Wedge,Flat,Stairs 2.0' 4' 15, 17 Grind Rail(Round) 14" 2" 10, 18 Wedge,Flat,Wedge 2.0' 4' 18' 19 Pyramid Section(Wedge) 2.0' 6' 18, 20 Quarter Pipe(Left) 4.0' 4' 11' 21 Quarter Pipe(Center 4.0' 4' 11' 22 Quarter Pipe(Center 4.0' 4' 11' 23 Quarter Pipe(Right) 4.0' 4' 11' 24 Curved Grind Ledge 15" 2' 14' TOTAL SKATE ELEMENTS $59,709.02 INSTALLATION,NOT INCLUDING PREVAILING WAGE $5,970.90 SHIPPING $1,050.00 GRAND TOTAL $75,574.44 phone 877489-3539—fax 626-330.5803—www.epohnranch.com—infoospohnranch.com 15131E Clark Ave.City of Industry,CA 91745 �L rSTEEL option 3 l 3 ry,iene Skatopark ssiste Parse b ameba asneft-uui wars asa_aiasaw.ew aims-ra.its ass bse7-Fat[62@.3a*..5ooa-wwNs�n�nrawe�.e�w-bH�gaaaraneh.caw �TrueRide.I H B MC HENRY, IL SKATEPARK PROPOSAL - 10-2025-IN-3TS WTrueR�de. 10-2025-IN-3TS 1. HIPPED WEDGE COMBO 6'Tall x 24'Wide-B'Deep Docks) 1 SPD-00094 Left Deck(57 x 8'W x 8'D) $2,857.17 1 SPD-00735 Right 900 Hip Deck(57 x 8'W x 8'D) $2,052.73 1 SPT-00033 Stand Alone Street Transition(57 x 8'W) $2,759.97 1 SPW-00198 Left Wedge Unit(57 x 8'W) $2,324.14 1 SPW-00199 Right Wedge Unit 57 x 8 $2 324.14 5 SKATE ELEMENTS 2. SPINE HUMP COMBINATION 2'-4'Tall x 16'Wide 1 SPH-00003 Stand-Alone Hump Unit $4,649.69 1 SPH-00033 Stand-Alone Spine Unit(47 x 8'W) 45,043.50 1 SPD-00819 Sine Support $288.71 1 SKATE ELEMENT 3. VERT WALL 12'Tall x 16'Wide 1 CUSTOM Left Wall Section(47 x 8'W) $2,063.55 1 CUSTOM Right Wall Section(47 x 8'W) $2,063.55 1 SPT-00022 Left Transition Unit(87 x 8'" $2,897.41 1 SPT-00023 Right Transition Unit 87 x 8' $2 897.41 4 SKATE ELEMENTS 4. RAKED QUARTER PIPE 6'To 4'Tall x 24'Wide Left to Right with Raked Section 1 SPD-00118 Right Deck(67 x 8'W x 8'D) $2,940.93 1 SPD-00718 Left Hip Deck(47 x 8'W x 8'D) $1,980.23 1 SPT-00021 Stand Alone Transition Unit(47 x 8'W) $2,320.01 1 SPT-00046 Right Transition Unit(67 x 8'W) $2,509.95 1 SPT-00023 LeftTransition Unit(47 x 8'" $1,997.44 1 SPT-00199 Raked Transition Unit 6'-4'T x 8'W x 4'D $4,457.48 6 SKATE ELEMENTS 5. FUN BOX(2'-3'Tall x 42'Wide Fun Box with Cow Catcher,Rail,Planters) phone 877489-3539—fax 828-330-5803—www.spohnrench.com—InfbCapohnranch.00m 15131B Clark Ave.City of Industry,CA 91745 tCTrueRide.11-OBUffy 1 SPW-00367 Filled Corner(37) $2,928.70 4 SPW-00096 Center Wedge Unit(37 x 8'W) $7,687.72 1 SPW-00094 Left Wedge Unit(37 x 8'W) $2,010.87 1 SPW-00095 Right Wedge Unit(37 x 8'W) $2,010.87 1 CUSTOM Center Wedge Unit(3'Wide) $742.06 2 SPD-01023 Center Deck Unit(37 x FIN 61D) $4,221.42 1 SPD-01022 Right Deck Unit(37 x 8'W x 6'D) $2,373.20 1 CUSTOM Straight Planter(4'6"Tall x 3'Wide x 16'L) $5,166.67 1 SPL-00783 Double-Raked Planter(5.57 x 1.5'W x 261) $7,705.25 1 CUSTOM Single Kink Grind Rail $708.75 14 SKATE ELEMENTS 6. RADIUSED WEDGE 4'Tall x 16'Wide 1 SPD-00058 Left Deck Unit(47 x 8'W x 4'D) $1,770.89 1 SPD-00059 Right Deck Unit(8'Wide,4'Deep,4'Tall) $1,770.89 1 SPW-00186 Left Wedge Unit(47 x 8'W) $1,921.99 1 SPW-00187 Right Wedge Unit 47 x 8 $1 921.99 4 SKATE ELEMENTS 30 TOTAL SKATE ELEMENTS $91,369.25 INSTALLATION,NOT INCLUDING PREVAILING WAGE $9,136.93 SHIPPING $1,050.00 GRAND TOTAL $100,506.18 PROPOSAL IS VALID FOR 10 DAYS FROM 8.20.2010 PROPOSAL DOES NOT INCLUDE TAXES,PREVAILING WAGE,OR BONDING PROPOSAL IS SUBJECT TO ATTACHED TERMS&CONDITIONS OPTIONS For Prevailing Wage,Add: $4,104.53 For Bonding,Add: $5,230.54 phone 877-489-3539—fax 626330-5803—w .spohnranchxom—info@spohnranch.com 15131 B Clark Ave.City of Industry,CA 91745 DHEAVY O TY Option 4 3 ' -J�.-.� . ..yam• `max eon - - .. �!- .• may- � � n •...fir.. kalemark €sss��reffka rs swoon ssos6-1s1i1 clw%As4L6 ws".oA st746-rr 82s.is6.6867-sou 6is.830.6663-wWwApmmmmcxcon-lat•asw•rnnmobAso slsae reese c�eta� I �TrueRidu I H13BM MC HENRY, IL SKATEPARK PROPOSAL - 10-2025-IN-4HD 1=13"E3'UW' 10-2025-IN-4HD 1. MINI RAMP 4'Tall x 16'Wide $31,743.49 2 SPD-00058 Left Deck Unit(4'Tall) 2 SPD-00059 Right Deck Unit(4'Tall) 2 SPM-00022 Left Transition Unit(4'Tall) 2 SPM-00023 Right Transition Unit(4'Tall) 1 SPM-00082 Left Flat Bottom 1 SPM-00083 Right Flat Bottom 10 SKATE ELEMENTS 2. QUARTER PIPE 4'Tall x 8'Wide $7 082.73 1 SPD-00057 Stand-Alone Deck Unit(8'Wide,4'Tall) 1 SPT-00021 Stand-Alone Transition Unit 4'Tall 2 SKATE ELEMENTS 3. FUN BOX 2'Tall x 8'Wide with Rail $10,424.55 1 SPD-00936 Stand-Alone Deck Unit 1 SPG-00151 Kinked Grind Rail 2 SPW-00033 Stand-Alone Wedge Unit 8'Wide 4 SKATE ELEMENTS 4. RADIUSED WEDGE 4'Tall x 8'Wide $8 871.02 1 SPD-00057 Stand-Alone Deck Unit(S'Wide,4'Tall) 1 SPW-00185 Stand-Alone Wedge Unit 4'Tall 2 SKATE ELEMENTS S. SPOHNCRETE LOW CURVED GRIND LEDGE $2 870.00 1 SCG-41211 12"Tall x 2'Wide x 14.5'Long Curved Concrete Grind Ledge 1 SKATE ELEMENT 6. SPOHNCRETE PARK BENCH $3,015.00 phone 877-489-3539-fax 626-3305503-Nww.spohnranch.com-Info@spohnranch.com Pape 1 of 5 15131 B Clark Ave.City of Industry,CA 91745 M goo e I et$Fibs flask TrueRide I HEIEW 1 SCB-11601 16"Tall x 20"Wide x 8'Lond Concrete Park Bench 1 SKATE ELEMENT 7. SPOHNCRETE RAKED GRIND BOX $4,470.00 ' 1 SCG-12001 . 12"-20"Tall x 5'Wide x 8'Long Raked Concrete Grind Box 1 SKATE ELEMENT 11, SPOHNCRETE LOW GRIND BOX $3 890.00 1 SCG-11201 12"T x FIN x 8'L Concrete Grind Box 1 SKATE ELEMENT 9. FREE-STANDING GRIND RAIL $845.00 1 CUSTOM 14'Long Curved Grind Rail 1 SKATE ELEMENT 10. STEEL DOUBLE KINK GRINDRAIL-SQUARE $995.00 1 SSR-22402 10"-14"Tall x 16'Long Double Kink Square Grndrail 1 SKATE ELEMENT 11. STEEL HIGH FLAT GRINDRAIL-SQUARE $895.00 1 SSR-11802 16"Tall x 12'Long Square Grindrail 1 SKATE ELEMENT 12. SPOHNCRETE CONCAVE BENCH $3 440.00 1 SCB-12101 21"Tall x 22"Wide x T Long Concave Concrete Bench 1 SKATE ELEMENT 13. SPOHNCRETE CURVED COUCH $5 570.00 1 SCB-12601 12"-26"Tall x 5.5'Wide x 10.5'Long Curved Concrete Couch 1 SKATE ELEMENT 14. SPOHNCRETE LOW 3-STEP GRIND BOX $4,980.00 6"-12"-18"Tall x 4.5'Wide x 8'Long 3-Step Concrete Grind 1 SCG-31801 Box 1 SKATE ELEMENT 28 TOTAL SKATE ELEMENTS $87,091.79 SHIPPING AND INSTALLATION,NOT INCLUDING PREVAILING WAGE $23,980.00 SUBTOTAL $111,071.79 DISCOUNT -10.00% $(11,107.18) phone 877-489-3539-fax 626.330-5503-w .spohnranch.com-info(gapohnranch.com Page 2 of 5 151318 Clark Ave.City of Industry.CA 91745 am City of McHenry, IL - Skate Park art i Dwg.SK8182o GK.TR— KsraTW* www.skateramparb.com 1-800-387-6318 i I ,y City of McHenry, IL - Skate Park mammaart 6KAMPMK fY$T"3 Dwg.SK81822 www.skateramparfs.com {i 1-80 -W-6318 1 I I � F Y � 1✓ � � f I r City of McHenry, IL - Skate Park tea"' art r EKATlMpK iYETlME Dwg.SK81821 www.skateramparts.com r 1-800-387-6318 A A A A A A AGENDA ITEM 3 Renovation of the Fort McHenry Playground was discussed at the June 9, 2010 Parks and Recreation Committee. Staff was directed to contact Leathers & Associates to request additional information on renovation costs and schematic plans for future improvements. Attached are the proposed plans and cost estimates for this renovation project. Work can be scheduled in the spring or fall of 2011. This renovation project would require the use of community volunteers and possible fundraising efforts to be a success. The preliminary cost estimates are: Design, consultation, construction management $27 800 Construction materials cost $50,000 Total: $77,800 The committee can discuss the scope of this renovation project and the next step in this process. LEATHERS ASSOCIATES 3 September 2010 Pete Merkel Director of Parks and Recreation McHenry,IL 60050 Re:McHenry Playground Hi Pete, Here's an overview of the proposed scope of work. This covers general maintenance and some additional items as described below. By replacing the majority of wood in high contact areas with plastic composite you will reduce contact with the wood. The results will be a structure that's more pleasing aesthetically,up to date with safety standards and over all lower maintenance. The work would require a 5 day volunteer build supervised by Leathers &Associates consultants to ensure the work is completed and in accordance with the safety standards. Part of our services is to work with you to prepare for the build including things like materials,tools,PR. Etc. I have included a materials list for the project and a proposal from our firm. I would estimate the materials cost to be around$50,000. By sourcing the materials on the list and shopping for the best price you can determine an exact cost. Key items under the Scope of work include: • Sand,seal with a pigmented sealer • Replace all decking with a composite plastic(Trex) • Replace or cap the majority of handrail with A composite plastic(Trex) • Replace trim cap on balusters • Replace the majority of vertical 2x4's a composite material(Trex) reducing the contact with wood and reducing overall maintenance. (Optional pipe baluster can be use used in some areas helping to increase visibility if desired). • Top off the safety surfacing by adding an additional 8" • Repair shaky stairs • Keep swing beam and structure but replace all swing seats and hardware 18 Eastlake Road Ithaca, N1 14850 Toll Free 877-564-6464 Fax 607-277-1433 �N%N Ni.leathersassociates.com • Replace slides with plastic slide:Spiral, Bumpy,Tunnel/tube, wide tot. Left turn tube slide is okay • Add additional sand • Rebuild overhead equipment(Horizontal ladder, zigzag ladder, rings* and low ring*s and ladder. (*Use existing ring handles) • Replace steering wheels • Re-build a few sections around some of the slides and where needed • Isolate and label the tot area specifically for ages 2-5. Sincerely, Marc Leathers Page 2 of 2 18 Eastlake Road Ithaca, NN 14850 "I'oll Free 877-564-6464 Fax 607-277-1433 ii iN�N.leathersassociates.com LEATHERS ASSOCIATES ESTIMATED ROPOSAL DATE: 9/3/10 Pete Merkel Director of Parks and Recreation City of McHenery, IL Project Manager: To be determined Construction Week: To be determined (Estimated for a 5 day build) READ THIS ENTIRE PROPOSAL CAREFULLY. IT CONTAINS IMPORTANT INFORMATION FOR YOUR PROJECT. This proposal constitutes an estimate of the work our office will provide for your project and the associated fees. The fees described in this proposal assume that we are providing standard services based on the schematic provided after Design Day, as summarized in both Section H of our "Playground Planning Guide" and this document. The fees outlined here will vary only if additional work is requested or required. Examples of work that may generate additional fees include details above and beyond those necessary for us to build the project, perspective drawings, a major change in the projects scope or site. The construction phase will not change except by mutual agreement between Leathers & Associates and the community. Certain conditions may be encountered during construction that significantly affects consultants' total number of hours. Variables such as weather and low volunteer turnout are impossible to identify until the time of construction and may affect the total hour's necessary for construction consultation. However, additional fees will be charged only if construction continues beyond the final scheduled day. The following pages contain an outline of the services we are to provide. If you have any questions about this proposal, please contact us by 10/3/10. 18 Eastlake Road Ithaca. N1 148511 Toll Free 877-564-6464 Fax 607-277-1433 �%ii%N.leathersassociates.com McHenery, IL renovation The following is an outline of fees for Leathers & Associates' professional services: CONSTRUCTION PHASE $ 950 (The Construction Phase fee confirms your construction date and is due upon acceptance of your proposal.) DESIGN DEVELOPMENT & CONSTRUCTION DOCUMENTS PHASE Design Development Detailed Drawings, Materials list, & Project management $ 9,750 services ORGANIZATION PHASE Organization Phase Fee $ 2,800 (Includes travel time, accommodations and transportation) TOTAL FOR PRE-CONSTRUCTION SERVICES $ 13,500 All pre-construction bills are due three weeks from date of invoice, and are subject to a 1 .5% per month surcharge on any outstanding balance after due date (annual percentage rate of 18%). CONSTRUCTION PHASE (estimated for a 5 day build) Construction Consultants $ 14,300 (Includes travel time and airfare, but not housing accommodations.) *housing accommodations are typically donated (For Payment of Consultants: Please make check payable to Leathers &Associates and present to the lead consultant on the final day of construction.) All fees are subject to change; see attached for further explanation of fees. Page 2 of 4 18 Eastlake Road Ithaca, NN 14850 Toll Free 877-564-6464 Fas 607-277-1433 «1�1�-lea(hersassociates.com McHenery, IL renovation BASIC SERVICES The Basic Services consist of the three phases described below. DESIGN DEVELOPMENT/CONSTRUCTION DOCUMENTS PHASE Desian Development Leathers & Associates shall review and consult with the committee on the schematic design and shall incorporate the design feedback requested by the committee. Leathers & Associates shall refine and change the schematic design to conform with the current safety and accessibility guidelines (ASTM F1487, CPSC Pub. No. 325, and ADA Accessibility Guidelines for Play Areas) and to fit site and utility requirements. Individual details, traffic flow and budget constraints shall be considered. Construction Documents Leathers & Associates shall prepare from the developed design, for approval by the committee, the working drawings and specifications setting forth the requirements for the construction of the entire project. These documents typically consist of plan view drawings, site drawing with stakeout and post information, materials list and specifications. Leathers & Associates shall assist the committee in filing the required documents for the approval of governmental authorities having jurisdiction over the project. It is, however, the committee's responsibility to identify any such requirements and authorities and to follow through with any required filings. The community will be assigned a project manager, who will serve as the community's main contact from shortly after Design Day through the construction of the project. The project manager is available from 8 a.m. to 5 p.m. Eastern Time and can be reached by telephone, email or fax. All project management is included in the design development and construction documents phase fee. Final Materials Takeoff Phase Along with working drawings and specifications setting forth the requirements for the construction of the entire project, Leathers & Associates shall provide the community with a Final Materials List, enabling the community to purchase or obtain donations for all materials necessary for the completion of the project. A suppliers list and specifications for materials are part of this list. ORGANIZATION PHASE Leathers & Associates shall provide organizing and coordinating assistance and support by phone to the committee. A representative of Leathers & Associates shall also conduct Organization Day meetings with the committee. CONSTRUCTION PHASE Leathers & Associates shall provide construction consultants who will be present at the site during construction. The consultants shall work with the committee during construction to provide observation of construction and interpretation of drawings. Page 3 of 4 18 Eastlake Road Ithaca. Al 14850 Toll Free 877-564-6464 Fax 607-277-1433 �i%N i0cathersassociates.com McHenery, IL renovation The construction consultants shall familiarize themselves generally with the progress and quality of the work and determine in general if the work is proceeding in accordance with the construction drawings. The construction consultants shall be the interpreters of the requirements of the construction documents and the impartial judges of the performance thereunder by the volunteers. The construction consultants shall have the authority to reject work that does not conform to the construction documents. Whenever, in their reasonable opinion, they consider it necessary or advisable to ensure the proper implementation of the intent of the construction documents, they shall have authority to require replacement of any work at any stage of construction. The construction consultants' decisions shall be final if consistent with the intent of the construction documents. The construction consultants shall conduct a final inspection upon substantial completion of the work and shall prepare a punch list for the committee's use to accomplish full completion of the project. Leathers & Associates shall receive and review the punch list and shall issue a certificate of substantial completion. TRAVEL FEES Travel charges for Organization Day are not included in this proposal and will be billed separately. Both airfare and travel by car will be billed as a combination of expenses and travel time. Airfare or mileage fees for construction are not included in this proposal and will be billed separately. Travel time is included. PAYMENT OF FEES All bills preceding construction are due three weeks from the invoice date. Construction consultation fees are due on the final day of construction. Payment schedule Phase Approximate Due dates Design development/construction Three weeks after receiving documents phase documents Organization phase Before Organization Da Construction phase Last da of construction All invoices are subject to a 1 .5% per month surcharge on any unpaid balance after the due date (annual percentage rate of 18%). Page 4 of 4 18 Eastlake Road Ithaca, Al 14850 Toll Free 877-564-6464 Fax 607-277-1433 %%vm.leathersassociates.com i lJ Q r r �' �� �...+ >+AYL•`_� .�c i CCcK�Li:Lf,Gj � "—._"r nr U , O' S till 44 fF e FWow ►. j _ HEMAT1C P t • SC LAN r RENOVATION W, HENRY COMMUNITY PLAYGROUND tic HENRY, ILLINOIS t wl�OCtKTtS,erti�t ti wDv 1p1p�Auum 19.W 10.Ow AGENDA ITEM 4 Petersen Park Ball Field Renovation Specifications The sideline fencing and backstops at Fields 3 & 4 at Petersen Park are in need of renovation. These two fields have not had any repairs or replacement of fencing in several years. Field 3 was originally designed in 1978 for Men's and Women's slow pitch softball. The McHenry Pigtail League uses the field for an extensive girls fast pitch league and tournaments. In the past few years we have been talking with the pigtail league on a new design to provide additional fencing for player and spectator safety. The height of the sideline and dugout fencing needs to be raised and the backstop fencing needs to be replaced. Field 4 needs to have the same fencing improvements. This field was originally designed for younger age groups but is now being scheduled for a higher level of play with the addition of the outfield fence and lighting. The McHenry Pigtail League has contributed towards field improvements numerous times for both city and school district (Duker School) facilities. The league has expressed an interest in contributing toward this renovation project. Attached is a set of bid specifications to complete these proposed renovations this fall. Funding for this project would be from Park Developer Donations. Staff would like to review this project with the committee and recommend a motion to send the project to the City Council for approval to go out to bid for the work. City of McHenry Department of Parks & Recreation Petersen Park Ball Field Fence Replacement (Field 3 & 4) Fall 2010 Scope of the Work New fencing will be installed at Petersen Park on two softball fields. New sideline and dugout fencing will be installed and fencing will be replaced on existing (2) backstops. Contractor will be responsible for removing all existing fencing and providing all labor, equipment and materials to install new fencing as specified. Construction Schedule Work will begin upon approval of bids by the McHenry City Council. It is anticipated that work will be completed this fall in order to have the facility open for the 2011 spring season. Bid Deadline Bids due to: McHenry City Clerk's Office, Tuesday, October 5, 2010 at 11:30 am. Bid approval: McHenry City Council, Monday, October 11, 2010 at 7:30 pm. Project Completion Date Friday, December 3, 2010. PETERSEN PARK- FIELD 3 Removals Remove all existing sideline and dugout fencing, poles and concrete. All fence fabric will be removed from the existing backstop. Contractor will be responsible for disposal of all materials. Installation Sideline Fence - Install 180' of 8' high 9-gauge galvanized chain link system with 1 5/8" SS20 bottom, middle and top rail. - All line posts will be 3" SS40 posts with all fittings. - Installation of all posts set in 36" concrete —6" diameter hole. Backstop - Lower 6' section of backstop covered with 6 gauge galvanized fence fabric. - Upper 6' section of backstop covered with 9 gauge galvanized fence fabric. - Note: 3' extension of backstop on 20' section in front of scorers booth/storage building — 9 gauge galvanized fence. Include all fasteners and ties. Dugouts - Install 72' of 6' high 9 gauge galvanized chain link system with 1 5/8" SS20 top, middle and bottom rail. - All line posts will be 3" SS40 posts with all fittings. - Installation of all posts set in 36" concrete — 6" diameter hole. PETERSEN PARK- FIELD 4 Removals Remove all existing sideline and dugout fencing, poles and concrete. All fence fabric will be removed from the existing backstop. Contractor will be responsible for disposal of all materials. Installation Sideline Fence - Install 160' of 8' high 9 gauge galvanized chain link system with 1 5/8" SS20 bottom, middle and top rail. - All line posts will be 3" SS40 posts with all fittings. - Installation of all posts set in 36" concrete— 6" diameter hole. Backstop - Lower 6' section of backstop covered with 6 gauge galvanized fence fabric. - Upper 6' section of backstop covered with 9 gauge galvanized fence fabric. Dugouts - Install 72' of 6' high 9 gauge galvanized chain link system with 1 5/8" SS20 top, middle and bottom rail. - All line posts will be 3" SS40 posts with all fittings. - Installation of all posts set in 36" concrete — 6" diameter holes PETERSEN PARK BALL FIELD FENCE REPLACEMENT FIELDS 3 & 4 BID FORM Item 1 - Field 3 Removal of existing fence and backstop fabric. Installation of new sideline and backstop fencing. New fence fabric on backstop. All installation as specified. $ Item 2 - Field 4 Removal of existing fence and backstop fabric. Installation of new sideline and backstop fencing. New fence fabric on backstop. All installation as specified. $ Total for Items 1 & 2 $ Completion date: Friday, December 3, 2010 Bid Bond required in the amount of 10% of submitted bid. Company Name: Address: City: State: Zip Code: Telephone: Fax: Email: Company Representative: (Please print) Signature: City of McHenry Department of Parks & Recreation 333 S. Green Street/ McHenry, IL 60050 Phone: (815) 363-2160 Fax: (815) 363-3186 Email: pmerkel@ci.mchenry.il.us Petersen Park Field 4 Fence Renovation Sideline Fence 8' high O 3V Dugout Fence U high 1 e+e�.bpo.�a Scale 1"-20' 20 �. i B"c-p Petersen Park Field 3 Fence Renovation Sideline Fence 8' higt o ' / Dugout Fence 6' higr o a +P s a / Scale 1"-20' 1is« ,M Ott' McWI= Lake Proposal for: 2011 Aquatic Treatment Program Submitted by: Clarke Aquatic Services, a Clarke Company c«rme A Global Environmental Products and Services Company 110 E.Irving Park Rd.,4M Floor Roselle,IL 60172 630-894-2000 P 800-323-5727 630-894-1774 F www.clarke.com A BACKGROUND INFORMATION: MCCullom Lake is a 244 acre glacial lake located in Northeast McHenry County,Illinois.The lake has an average depth of 4.4 feet, maximum depth of 9.5 feet,storage capacity of 1,079 acre-feet,and average retention time of 254 days. Clarke Aquatic Services is providing this proposal for the services outlined in this document. The proposed treatment targeting Eurasian Watermilfoil for control will begin in the spring of 2011 (April). i RECOMMENDED LAKE MANAGEMENT PROGRAM: • Lakewide Eurasian Watermilfoil control program. o 2011 • Option 1:Fluridone treatment program targeting entire lake for Eurasian Watermilfoil at a rate of 8 parts per billion. ■ Option 2:Survey and spot treat Eurasian Watermifoil with systemic herbicide(2,4-D)through Clarke's LittLine® treatment deployment system. LittLine®is a patent pending Littoral Zone Treatment Technology that was developed to more effectively make aquatic pesticide applications for the control of Aquatic Nuisance Species(ANS). The system consists of two dual-application lines that are let out or reeled in,based on the speed of the application boat,to maintain desired treatment depth. This system provides optimal product placement for targeted species control. 0 2012-2013 • Survey and Monitoring program with spot treatments as required for Eurasian Watermilfoil control with systemic herbicide through Clarke's LittLinA treatment deployment system as described above. i ctameAGlobal Environmental Products and Services Company 2 of 5 i , w TREATMENT OF EURASIAN WATERMILFOIL(Myriophylium spicatum): • APRIL-MAY o Survey of McCullom Lake to identify plants,location,and stage of growth to determine proper timing for initial treatment. o Treatment targeting Eurasian Watermilfoil(Option 1 or Option 2) ■ Water usage restrictions posted at requested locations • Detailed,electronic,service report including chemical usage, observations,actions taken and any water usage restrictions. • MAY•SEPTEMBER o Follow-up ■ Option 1-properly timed FasTests to determine level of chemical and need for'bump'treatments to sustain proper exposure time to target Eurasian Watermilfoil for control. • Spot treatment of any remaining Eurasian Watermilfoil as needed. Spot treatment of algae by request ■ Detailed reporting to follow each inspection ADVANTAGES OF LITTLINE'S PRECISE LIQUID APPLICATION: • The LittLine®system allows liquid herbicides and algaecides to be placed In the bottom of the water column,where the chemicals are immediately available to be absorbed to control nuisance aquatic species. This precision rate controlled system insures a meticulous application and reduces off target Impacts. • This system also eliminates the need for costly granular products,which were developed as a carrying agent to get the active ingredients in herbicides and algaecides to the bottom where aquatic nuisance species first emerge. Liquid applications do not have the same challenges with release rates that have been documented with granular formulations. • LittLine'sO unique application system provides the ability to apply two different pesticide formulations through separate hoses at the same time. These can be applied at depths of up to 8 feet while traveling 5 mph in a 30 foot swath,enabling a treatment rate of 18 acres/hour(See LittLine®Speed Trials,diagram,below). Lwh..•sp•whj, otarme i o A Global Environmental Products and Services Company 3 of 5 w SERVICES TO BE PROVIDED BY CLARKE AQUATIC SERVICES: All manpower, materials,insurance,equipment and technical advice required to perform aquatic herbicide applications as outlined in the above proposal. REFERENCES: The following is a list of references Including contact name, addresses,and phone numbers for customers that Clarke and Clean Lakes,Inc.(CLI)is currently under contract with,or has been under contact with,for programs that include aquatic vegetation control through herbicide treatments as well as mapping of aquatic vegetation and similar types of aquatic vegetation management program development including NPDES Permit Compliance: Customer(Clarke) Gages Lake Conservation Committee Contact: Rob Flood Address: 33818 N Prospect Drive,Gages Lake,IL 60030 Phone No.: 847-623-6060 Project Dates: 2004-2009 Type of Service: Eurasian Watermilfoil Control,Aquatic Herbicide Application, Liquid 2,4-D. Spot treatments for Algae control with Captain. Customer(Clarke) Deep Lake Improvement Association Contact: Mary Anderson or Tom Cachur i Address: 38810 N Villa Court or 11 Shoshoni Trail,Lake Villa,IL 60046 Phone No.: 847-356-8412 or 847-265-1840 Project Dates: 2009 Type of Service: Eurasian Watermitfoil Control,Aquatic Herbicide Application, Navigate,Granular 2,4-D,Spot treatments for other nuisance plant growth with Reward,and Algae treatments with Captain. Customer(CLI): Bonner County Public Works Department Contact: Brad Bluemer or Leslie Marshall Address: 4100 McGhee Road,Suite C,Sandpoint,Idaho 83864 Phone No.: 1-208-263-3175 Project Dates: 2007-2008 Type of Service: Eurasian Watermilfoil Control,Pend Oreille Lake 8r River System, GPS-GIS Aquatic Herbicide Treatment Mapping,Public Education, Water Quality Monitoring,Permit Posting&Compliance otaIle A Global Environmental Products and Services Company 4 of 5 A Customer(CLI) U5 101 Engineer Research an me d Development Center Address. 3909 Halls Ferry Road,Vicksburg,MS 39180-6119 Contact: Dr.Kurt Getsinger,Research Biologist E-mail: koetsinoerowes army,mil Project Dates: 2007 Type of Service: Eurasian Watermilfoil Control Research Trials in the Pend Oreille River,Washington State(2007),Clark Fork River Montana(2009), RWT dye and aquatic herbicide applications,trials support. Customer(CLI)• Santa Clara Valley Water District Address: Santa Clara Valley Water District,5750 Almaden Expressway,San Jose,CA 95118 Contact: Mr.Mark Wander,Unit Manager,SCVWD Vegetation Management Unit Phone: 408-265-2607,ext.3851 Project Dates: 2001-present Type of Service:Invasive Species and Aquatic Vegetation Control Programs on District Facilities,Includes GPS-GIS Program Mapping and Reporting of Invasive Species infestations on District Property Customer(CLI): Lake Wildwood Association Contact: Mr.Terry Thies Address: 11255 Cottontail Way,Penn Valley,CA 95946 Phone: 530 432-7878 Project Dates: 2006-2009 Type of Service: CLI was contracted to develop and implement an AIS(Eurasian Watenmilfoil)Aquatic Vegetation Management Program as well as obtain NPDES Permit compliance documents that included the Aquatic Pesticide Application Plan,and filing of the Notice of Intent (NOI)and Aquatic Pesticide Application Plan(APAP)with the Regional Board. In addition,the project included the required NPDES monitoring and sampling,generation and submittal of annual report Additional references can be provided upon request. ctarmlD A Global Environmental Products and Services Company 5 of 5 e otarme Page 1 of4 PROFESSIONAL SERVICES OUTLINE MCCULLOM LAKE A.PROGRAM OVERVIEW(APRIL-SEPTEMBER) McCullom Lake's customized water management plan includes an inspection, assessment, recommendation, implementation,and customized reports. Clarke Aquatic Services(CAS)will determine the proper treatment program at the time of inspection based on the weather and environmental conditions of the water. • Program will begin with early spring(April-May)monitoring of McCuilom Lake to identify plants,stage of growth and proper tithing for initial treatment. • Initial treatment will be scheduled based on findings during early spring survey. • Timely notice will be provided to McCullom Lake prior to initial treatmenL • Water restrictions will be posted in obvious points and or as requested by label instructions or request of McCullom lake. • Every inspection and treatment will be accompanied by a detailed electronic service report. • All CAS products used are EPA registered and labeled for aquatic use. Product label will determine application rates and will be applied by licensed applicators. • Program does not include removal of plant material treatment of flouridone-resistant hydrilla or copper- resistant algae,cattail,duckweed,watermeal or rip rap control. ❑*•IMPORTANT••Please check box if these waters are used for irrigation. B.OPTION 1 LAKEWIDE EURASIAN WATERMILFOIL CONTROL Inspection and treatment program targeting Eurasian Watermilfoil with Avast at 8 arts per billion Lake in McHenry,IL.See next page for single and multi-year agreement options.P P (ppb)on McCullom Initial Avast Treatment at 8 ppb..........................$15,462.75 Bump Treatment..............................................$2,024.75Fppb FasTests*........................................................$2,160.00 "Four(4)FasTeat samples taken at properly tined increments port initial treatment for a total of shrteen(16)tests FASTEST SCI1 D r F • Approximately 2-3 days post initial treatment to determine initial concentration • Approximately 14 days post initial treatment,apply additional fluridone to achieve 8ppb concentration if needed • Approximately 30 days post initial treatment,apply additional fluridone to the lake to achieve 3-4ppb if needed • Approximately 45 days post initial treatment,apply additional fluridone to the lake to achieve 3-4ppb if needed • Approximately 60 days post initial treatment,apply additional fluridone to the lake to achieve 3-4ppb if needed 2011 Suv-ested Budget[Option 11 Minimum.............................................$17,622.75 Approximate Maximum..........................$26,531.65 Minimum bared on no need for bump treatment. Maximum based on a loss in 60•10 concentration rate at 14 and 30 days post initial treatment. Qo ctarme Page 2 of 4 C OPTinN'f ci)n•r --- — + atcGA1MENTS Fnn L•rm RASIAPl wATERNIMFOIL WITH LITTLINE® Inspection and treatment program targeting EurasiaM Watermilfoil with DMA 4 deployment system on McQtllom Lake in McHenry,W See next page for single and multiiyear agreement options. IVM(liquid 2,4-D)through LittLine® Spot treatment of Eurasian watermufoil........L.......nex. ••••••••$275.00/surface acre D ADDITIONAL SERVICES Please check all that apply and your control consultant will contact you with more information. Weed&AI_ ea_ a��ces ElBiological T Options Aeration Services reatment ��— ❑ Cattail treatment ❑ New Fountain Design, ❑ Ripall Rap W ❑ New Bottom DiffuSystem esitgn,Sales&Install P weed Control ❑ Duckweed&Watermeal Control ❑ Service Call ❑ Spot treatment for Algae Control......sl60.00/surface acre MoSto Control Services: ❑ Season Long Control Programs ❑ One Time/Single Event Applications I e ctarme Page 3 0174 CLIENT AUTHORIzATION MCCULLOM LAKE 1 Term and Tn"`:natl parties have executed this The terry of the Aquatic Weed and Algae Service Agreement shall with a provision of this /&cement and shall continue for a period ending on Deoembe'31,2011°ommence on the date when both default to the defaultingAgreement,thm the°the'party Shall have the right to terminate this A If.Party hereto fails to comply Party and the defaulting Part fails to cure the default within six daysgre rent if it Sauey written notice of the 2• Price Increa_ sixtyreceipt of said notice. n or after the Defter October 1,21,2p)�B C any °CaleendAquatar �ic �and Algae son Januervicesary hereunder may be increased by Clarke Aquatic Services Y "led 1,2012 and Aeration Service ( price Increase Date")by a percentage which shall not exceed Agreement commencing on or consumer price index during the calendar year which immediately Increase percents e y precedes the Price increase D te of the Percentage increase of the extraordin 8 ) Clarke Aquatic Services may Petition Customer W an Date or five percent 5 ary and unusual changes in the cost of operations that could not be real me for an additional rate adjustment on the a"Price be covered will be prorated to the onably foreseen b a basis of Program cost at the rates in effect at the times Y prudent operator.New areas to 3. Property Derma Allegations ofproperty damage resulting from scheduled Cl Aquatic a written report,filed directly with respective Control Consultant within five 5 will review the dy Services service must be submitted in report,determine a fair and equitable resolution,and r �)business days. The Clarke A respond within a timelyAquatic Services team 4. ConfldgnH�1th. manner. This contract,including any additional information solely for the use of the individual or entity to whom it is addressed and others authorized to receive it.If provided,contains confidential information.It is intended recipient,you are hereby notified that any disclosure,copying,distribution or taking an information is strictly prohibited. You are not the intended B Y action in reliance on the contents of this 5. Proeram Payment Plan le fP a.a oro�de t�ereautred ter°rmation h t We accept the followingr cess Daum t t (please circle one): VISA MASTERCARD DISCOVER Name of Credit Card holder: AMERICAN EXPRESS Credit Card#: ExpDate: CCVCode: OPTION 1 LAKEWIDE TREATMENT Please select contract lerms: ❑ 2011 Season$17,622.75 ❑ 2011&2012 Seasons ❑ 2011 thm 2013 Seasons OPTION 2 AND ADDITIONAL SERVICES: As specified in the Professional Service Outline,any additional treatments beyond the core program including any fluridone bump treatments or requested spot treatments will be due when the treatment is completed. ❑ 2011 Season$275.00/surface acre targeting Eurasian Watermilfoil with DMA 4 IVM through LittLine® X 5.00 treatment acres ❑ 2011&2012 Seasons ❑ 2011 thin 2013 Seasons SIGNING AND RETURNING this document will authorize Clarke Aquatic Services to Perform the services stipulated within the limits of this cost estimate unless otherwise stated. FOR MCCULLOM LAKE: PRINT NAME: TITLE: SIGNATURE: FOR CLA.RKE AQUATIC SERVICES: DATE: NAME:= TITLE: Control Consultant Amy Kay �-- DATE:Semtemher 1 2010 Mobile:630 675-0012 Email:akay@clarke.com w Cta me Page 3 of 4 CLIENT AUTHORIZATION MCCULLOM LAKE 1. Tarr And Terminapon_The term of the Aquatic Weed and Algae Service Agreement shall commence m the darn when both parties have executed this Agreement and shall continue for a period ending on December 31,2011.If a party hereto fails to comply with a provision of this Agreement,then the other party shall have the right to terminate this Agreement if it gives written notice of the default to the defaulting party and the defaulting party fails to cure the default within sixty days of receipt of said notice. 2. Price Increase: The price for Aquatic Weed and Algae services rendered hereunder may be increased by Clarke Aquatic Services on or after the first day of any Calendar year commencing on January 1,2012 and Aeration Service Agreement commencing on or after October 1,2011(a"Price Increase Date')by a percentage which shall not exceed the greater of the percentage increase of the consumer price index during the calendar year which immediately precedes the Price Increase Date or five percent(5%)(The"Price Increase Percentage,). Clarke Aquatic Services may petition Customer at any time for an additional rate adjustment on the basis of extraordinary and unusual changes in the cost of operations that could not be reasonably foreseen by a prudent operator.New areas to be covered will be pro-rated to the program cost at the rates in effect at the time. 3. Property Damaae: Allegations of property damage resulting from scheduled Clarke Aquatic Services service must be submitted in a written report,Eled directly with respective Control Consultant within five(5)business days. The Clarke Aquatic Services team will review the report,determine a fair and equitable resolution,and respond within a timely manner. 4. Confidentiality:This contract,including any additional information provided,contains confidential information.It is intended solely for the use of the individual or entity to whom it is addressed and others authorized to receive it.If you are not the intended recipient,you are hereb)notified that any disclosure,copying,distribution or taking any action in reliance on the contents of this information is strictly prohibited. 5. Pr9grarn a e t la : (Please provide the required information below to process pavmentl We accept the following(please circle one): VISA MASTERCARD DISCOVER AMERICAN EXPRESS Name of Credit Card holder: Credit Card#: Exp Date: CCV Code: OPTION I LAKEWIDE TREATMENT Please select contract terms: O 2011 Season$17,622.75 ❑ 2011&2012 Seasons ❑ 2011 thru2013 Seasons OPTION 2 AND ADDITIONAL SERVICES: As specified in the Professional Service Outline,any additional treatments beyond the core program including any fluridone bump treatments or requested spot treatments will be due when the treatment is completed. ❑ 2011 Season S275.00/surface acre targeting Eurasian W atermilfoil with DMA 4 IVM through LittLine® X$275.00 = treatment acres ❑ 2011&2012 Seasons ❑ 2011 thru 2013 Seasons SIGNING AND RETURNING this document will authorize Clarke Aquatic Services to perform the services stipulated within the limits of this cost estimate unless otherwise stated. FOR MCCULLOM LAKE: PRINT NAME: TITLE: SIGNATURE: DATE: FOR CLARKE AQUATIC SERVICES: NAME: TITLE: Control Consultant DATE:SgRtember 1.2010 Amy Kay Mobile:63M75-0012 Email:akay@clarke.com w wotarwe CLIENT INFORMATION Page 4 of 4 MCCULLOM LAKE PLEASE ASSIST US IN MAINTAINING OUR RECORDS BY COMPLETING THE FOLLOWING: AUIMADDREIL- Na= Property Management Company(if applicable): Address: City: State: Zip: Office Phones Cell: Fax' Accounts Payable E-Mail: 'TREATMENTADDRFc (if dlff rcot from Above) Contact Name: Address: City: State: Zip: CONTACT PERSON FOR MC ttLLOM LA F• Name: Title: Office Phone: Cell: Fax: E-Mail: ALTERNATE CONTACT PFRC0 FORM ern LOM LA F Name: Title:_ Office Phone: Cell: Fax: E-Mail: INSPECTION REPORTS: Email service reports to thejollowing email addresses: ❑ Email: _Title: ❑ Email: Title: Please sign and return a copy of this completed contract to: Clarke Aquatic Services Attention:Amy Kay 110 E.Irving Park Rd.,4"Floor Roselle,IL 60172 Phone:630-675-0012 Fax:630-894-1774 okay clarke.com