HomeMy WebLinkAboutResolutions - R-79-15 - 05/07/1979 - FAU projects •
R-7'9-15
RESOLUTION •
The City of McHenry, Illinois, accepts the estimated cost of
$106,350.00 for the following FAU projects:
FAU 0087 Green Street from Elm Street to Pearl (500'L x 47'W)
base repair, resurfacing and frames and grates
adjustment $11,100.00
FAU 0090 Front Street (650'L x29'W)
base repair, resurfacing and frame and grates
adjustment $7,850.00
FAU 0090 Millstream (600'L x 24'W)
base repair, resurfacing and frame and grates
adjustment $5,900.00
FAU 0082 Lillian Street (1600'L x 24'W)
base repair, resurfacing and frame and grate
adjustment $15,500.00
FAU 0087 Green Street from Waukegan to Kane (1700'L x 30'W)
base repair, resurfacing and frame and grate
adjustment $26,300.00
FAU 0091 Kane Street (1300'L x 33'W and var.)
base repair, resurfacing and frame and grate
adjustment $25,500.00
FAU 0087 Green Street from south of bridge to Clover
base repair, resurfacing and frame and grate
adjustment $14,200.00
The City of McHenry, Illinois agrees to pay 25% plus engin-
eering of the above project with the 75% balance to be paid by
FAU funds.
Motion by Alderman Schooley , seconded by Alderman
Meurer , to pass the above resolution.
PASSED this 7th day of May, 1979.
(e.,6,5et:4
ATTEST: Mayor
City Clerk
•
•
I, James R. Rakow, McHenry County Superintendent of Highways,
concur with the above described ' ct as pr nted.
•
ame R. Rakow
McHenry County Superintendent
of Highways
Dated: May 8, 1979