Loading...
HomeMy WebLinkAboutResolutions - R-79-15 - 05/07/1979 - FAU projects • R-7'9-15 RESOLUTION • The City of McHenry, Illinois, accepts the estimated cost of $106,350.00 for the following FAU projects: FAU 0087 Green Street from Elm Street to Pearl (500'L x 47'W) base repair, resurfacing and frames and grates adjustment $11,100.00 FAU 0090 Front Street (650'L x29'W) base repair, resurfacing and frame and grates adjustment $7,850.00 FAU 0090 Millstream (600'L x 24'W) base repair, resurfacing and frame and grates adjustment $5,900.00 FAU 0082 Lillian Street (1600'L x 24'W) base repair, resurfacing and frame and grate adjustment $15,500.00 FAU 0087 Green Street from Waukegan to Kane (1700'L x 30'W) base repair, resurfacing and frame and grate adjustment $26,300.00 FAU 0091 Kane Street (1300'L x 33'W and var.) base repair, resurfacing and frame and grate adjustment $25,500.00 FAU 0087 Green Street from south of bridge to Clover base repair, resurfacing and frame and grate adjustment $14,200.00 The City of McHenry, Illinois agrees to pay 25% plus engin- eering of the above project with the 75% balance to be paid by FAU funds. Motion by Alderman Schooley , seconded by Alderman Meurer , to pass the above resolution. PASSED this 7th day of May, 1979. (e.,6,5et:4 ATTEST: Mayor City Clerk • • I, James R. Rakow, McHenry County Superintendent of Highways, concur with the above described ' ct as pr nted. • ame R. Rakow McHenry County Superintendent of Highways Dated: May 8, 1979