Loading...
HomeMy WebLinkAboutResolutions - R-87-7 - 06/03/1987 - Local Improvement Project 31FIRST RESOLUTION OF THE BOARD OF LOCAL IMPROVEMENTS OF THE CITY OF MCHENRY, ILLINOIS ORIGINATING A LOCAL IMPROVEMENT PROJECT TO BE KNOWN AS CITY OF MCHENRY LOCAL IMPROVEMENTS PROJECT NO. 31 Be it resolved by the Board of Local Improvements of the City of McHenry, McHenry County, Illinois as follows: SECTION 1. That there be considered the construction of a local improvement project consisting of a sanitary sewer system for the primary purpose of providing service to the following platted subdivisions within the corporate limits of the City of McHenry: McHenry Shores Unit 1, McHenry Shores Unit 2, McHenry Shores Unit 3, McHenry Shores Unit 4, McHenry Shores Unit 5, and Idyl Dell. SECTION 2. That the aforesaid local improvement project shall consist of approximately 27,777 lineal feet of 8-inch and 1,824 lineal feet of 10-inch ABS or PVC composite or ductile iron sewer, 1,428 lineal feet of 15-inch ABS or PVC composite or 16-inch ductile iron sewer, 183 lineal feet of 8-inch ductile iron sewer, 2,786 lineal feet of 18-inch reinforced concrete or ductile iron sewer, 130 manholes, a pumping station with two 350-gallon per minute pumps and approximately 602 lineal feet of 6-inch ductile iron force main, and a main pumping station with two 700-gallon per minute pumps and approximately 2,798 lineal feet of 12-inch ductile iron force main. Also included are 6-inch ABS or PVC house service connections to within five feet of the lot line of the approximately 640 lots served by the system, and restoration of street, driveway and lawn surfaces disturbed during construction. The plans for the project, consisting of drawings showing the locations, depths and details of construction of all sewers and force mains and construction details of the pumping stations, and a book of specifications describing the material, workmanship, performance and testing requirements of the project prepared by Baxter & Woodman, Inc., Environmental Engineers, which are on file in the Office of the City Clerk of the City of McHenry are hereby incorporated by reference. The construction of the proposed improvement also requires the taking of permanent easements on the following described property: A permanent 10 foot wide sanitary sewer easement, together with a 25 foot wide temporary construction easement, centered on a straight line which commences at a point on the Westerly line of Lot 20 in Block 24 in McHenry Shores Unit No. 3, a distance of 19 feet South of the rear lot line of said Lot 20 and which ends at a point on the Westerly line of Lot 18, a distance of 25 feet South of the rear lot line of said Lot 18. AND ALSO A permanent 20 foot wide sanitary sewer easement, together with a 30 foot wide temporary construction easement, along and abutting the Northerly lot lines of Lots 1 through 8 inclusive in Block 37 in McHenry Shores Unit No. 5. AND ALSO A permanent 20 foot wide sanitary sewer easement, together with a 30 foot wide temporary construction easement, along and abutting upon the Northerly lot lines of Lots V , 101 11, 141 151 18, 19, 22, 23 and 26 in Idyl Dell Subdivision. AND ALSO A permanent utility easement located within the right-of-way of Prairie Street as platted in Idyl Dell Subdivision. Said project is also described and indicated on the Estimate of Cost as compiled and ascertained by Baxter & Woodman, Inc., hereby appointed Engineer for the Board of Local Improvements for the purpose of this special assessment, and said Estimate of Cost is hereby approved; that a copy of said Estimate of Cost is attached hereto and made a part hereof as though set forth herein in full. SECTION 3. The cost of the aforesaid local improvement project shall be paid for by special assessments against the property benefited. SECTION 4. That the time and place for public consideration of the aforesaid proposed local improvement project be and the same is hereby fixed and shall be held on the 8th day of July, 1987 at the hour of 8:00 o'clock p.m. in the McHenry High School, East Campus, Teaching Theater (Auditorium), 1012 North Green Street, in the City of McHenry, Illinois. That notice of the time and place of such public consideration shall be prepared and mailed in the manner provided by law. SECTION 5. That the aforesaid local improvement project may hereafter be identified and referred to as City of McHenry Local Improvement Project No. 31. K SECTION 6. That this Resolution shall be at once transcribed into the records of this Board of Local Improvements. PASSED AND ADOPTED BY THE BOARD OF LOCAL IMPROVEMENTS OF THE CITY OF MCHENRY, ILLINOIS THIS 3rd DAY OF JUNE, 1987. AYES:Bolger, Lieder, McClatchey, Nolan, Patterson, Serritella, Smith, Teta NAYS: None ABSTAINED: Non ABSENT: None NOT VOTING: None ATTEST: City Clerk President, 4-o hoar r Local -improvemen City of McHenry, Illinois 3 ESTIMATE OF COST TO: Mayor and City Council of the City of McHenry, Illinois, and to the Board of Local Improvements of the City of McHenry, Illinois I hereby submit this estimate of cost, (including labor and material, cost of engineering services and inspection, interest reserve, cost of making, levying and collecting the assessment and all lawful expenses attending the same as provided by law) of a local improvement consisting of a sanitary sewer system for the primary purpose of providing service to the following platted subdivisions within the corporate limits of the City of McHenry, Illinois, to wit: McHenry Shores Unit 1, McHenry Shores Unit 2, McHenry Shores Unit 3, McHenry Shores Unit 4, McHenry Shores Unit 5 and Idyl Dell. The proposed sanitary sewer system project consists of approximately 27,777 lineal feet of 8-inch and 1,824 lineal feet of 10-inch ABS or PVC composite or ductile iron sewer, 1,428 lineal feet of 15-inch ABS or PVC composite or 16-inch ductile iron sewer, 183 lineal feet of 8-inch ductile iron sewer, 2,786 lineal feet of 18-inch reinforced concrete or ductile iron sewer, 130 manholes, a pumping station with two 350-gallon per minute pumps and approximately 602 lineal feet of 6-inch ductile iron force main, and a main pumping station with two 700-gallon per minute pumps and approximately 2,798 lineal feet of 12-inch ductile iron force main. Also included are 6-inch ABS or PVC house service connections to within five feet of the lot line of the approximately 640 lots served by the system, and restoration of street, driveway and lawn surfaces disturbed during construction. All materials of every kind and character to be used in the construction of this improvement shall be of first-class quality, suitable for the purpose for which they are to be used, and subject to the inspection and approval of the Board of Local Improvements of the City of McHenry, Illinois. All work shall be constructed in a workmanlike manner under the superintendence of the Board of Local Improvements of the City of McHenry, Illinois. It is estimated that the total cost of making the aforesaid proposed local improvement, including the construction costs, the engineering and inspection fees, the cost of making, levying, and spreading the assessment and the additional cost to make up any probable deficiency of interest in bonds or vouchers will be as follows: A. Construction costs (See attached Estimate of Costs for details) B. Interest Reserve (not to exceed 6% of the amount of the assessment) C. Engineering Services (design, general construction, administration and resident inspection) D. Cost of making, levying and collecting the assessment and all lawful expenses attending the same as provided by law (not to exceed 6% of the amount of the assessment) E. Total estimated costs $2,399,394.50 143,463.75 297,500.00 143,963.75 $2,9841822.00 I do certify that in my opinion the aforesaid estimate of costs does not exceed the probable cost of the improvements and the lawful expenses attending the same. DATED: June 3, 1987 Respectfully submitted, BAXTER & WOODMAN, INC. By: (1Z H. S. SUNDIN, Engineer of the Board of Local Improvements, City of McHenry, McHenry County, Illinois RECEIVED CITY OF MCHENRY, ILLINOIS MCHENRY SHORES AREA SANITARY SEWER SPECIAL ASSESSMENT NO. 31 ESTIMATE OF COST MAY 2 91987 SYSTEM CITY OF WHENRY Item Approximate Unit No. Description Quantity Price Amount 1. Sanitary sewer, complete in place includ- ing excavation, trench dewatering, bedding, backfilling and testing, but not including granular or compacted excavated material trench backfilling; for sewer sizes and depths: 18-inch RCP or ductile iron 0- 6 feet deep 43 lin.ft. 27.00 1,161 6- 8 feet deep 11442 lin.ft. 30.00 43,260 8-10 feet deep 870 lin.ft. S 35.00 30,450 10-12 feet deep 431 lin.ft. S 40.00 17,240 15-inch ABS, PVC or 16-inch ductile iron 0- 6 feet deep 171 lin.ft. 21.00 3,591 6- 8 feet deep 847 lin.ft. 24.00 20,328 8-10 feet deep 410 lin.ft. 27.00 11,070 10-inch ABS, PVC or ductile iron 0- 6 feet deep 451 lin.ft. 17.00 7,667 6- 8 feet deep 509 lin.ft. 20.00 10,180 8-10 feet deep 448 lin.ft. 23.00 10,304 10-12 feet deep 127 lin.ft. 26.00 3,302 12-14 feet deep 183 lin.ft. 30.00 5,490 14-16 feet deep 106 lin.ft. 35.00 3,710 8-inch ABS, PVC or ductile iron 0- 6 feet deep 5,505 lin.ft. 15.00 82,575 6- 8 feet deep 15,312 lin.ft. S 18.00 275,616 8-10 feet deep 5,471 lin.ft. S 21.00 114,891 10-12 feet deep 812 lin.ft. s 24.00 19,488 12-14 feet deep 292 lin.ft. S 30.00 8,760 14-16 feet deep 153 lin.ft. 35.00 5,355 16-18 feet deep 108 lin.ft. 40.00 4,320 18-20 feet deep 124 lin.ft. 45.00 5,580 2. 8-inch ductile iron sanitary sewer between MH 1-76 and 1-1, complete in place, including excavation, trench dewatering, bedding, backfilling with CA-6 aggregate and testing: Lump Sum 20,000 McHenry Shores Area Sanitary Sewer System Estimate of Cost 2. Item Approximate Unit No. Description Quantity Price Amount 3. Ductile iron force main including excavation, trench dewatering, bed- ding and testing for pipe sizes: 6-inch 12-inch 602 lin.ft. 16.00 $ 9,632 2,698 lin.ft. 24.00 64,752 4. Manholes, completed in place, including steps, connections, frames and covers, and special granular trench backfill, for depths: 4 feet in diameter 4- 6 feet deep 34 each 1,000.00 34,000 6- 8 feet deep 54 each 1,200.00 64,800 8-10 feet deep 28 each 1,500.00 42,000 10-12 feet deep 8 each 1,800.00 12,700.00 14,400 12-14 feet deep 2 each 2,100.00 4,200 14-16 feet deep 1 each 2,400.00 2,400 16-18 feet deep 1 each 2,700 2 feet in diameter 2 each $ 800.00 $ 1,600 5. Outside drop connection pipe at manholes, complete in place: 8-inch 15-inch 43 lin.ft. 80.00 3,440 4 lin.ft. 1 200.00 800 6. 6-inch service connections and plugs, complete in place for sewer sizes: 18-inch 41 each 250.00 10,250 15-inch 11 each 200.00 2,200 10-inch 34 each 125.00 1 4,250 8-inch 551 each 100.00 55,100 7. 6-inch riser pipe, including bends, complete in place: 800 vert.ft. $ 25.00 $ 20,000 8. 6-inch service pipe, complete in place, including excavation, trench dewatering, bedding, special granular backfill and testing: 6,600 lin.ft. $ 20.00 $ 132,000 McHenry Shores Area Sanitary Sewer System Estimate of Cost 3. Item Approximate Unit No. Description Quantity Price Amount 9. 6-inch service pipe, complete in place, including excavation, backfilling, trench dewatering, bedding and testing: 14,000 lin.ft. $ 16.00 $ 224,000 10. Special trench compacted granular back - fill, complete in place, including dis- posal of excavated materials, measured on the basis of trench length and pipe sizes, at depths indicated: 8, 10 and 12-inch 0- 6 feet deep 6- 8 feet deep 8-10 feet deep 10-12 feet deep 15 and 18-inch 0- 6 feet deep 6- 8 feet deep 8-10 feet deep 10-12 feet deep 1,530 lin.ft. 8.00 12,240 5,150 lin.ft. 10.00 51,500 1,345 lin.ft. 12.00 16,140 185 lin.ft. 14.00 2,590 125 lin.ft. 10.00 1,250 640 lin.ft. 12.00 7,680 395 lin.ft. 15.00 5,925 135 lin.ft. 18.00 2,430 11. Compacted excavated material, complete in place, including 12 inches,granular Pipe bedding and covering material, measured on the basis of trench length and pipe sizes, at the depths indicated: 8, 10 and 12-inch 0- 6 feet deep 5,325 lin.ft. 6.00 31,950 6- 8 feet deep 17,540 lin.ft. 8.00 140,320 8-10 feet deep 1,463 lin.ft. 10.00 14,630 10-12 feet deep 855 lin.ft. 13.00 11,115 12-14 feet deep 347 lin.ft. 16.00 5,552 14-16 feet deep 325 lin.ft. 20.00 6,500 16-18 feet deep 135 lin.ft. 25.00 3,375 18-20 feet deep 155 lin.ft. 30.00 4,650 15 and 18-inch 0- 6 feet deep 230 lin.ft. 8.00 1,840 6- 8 feet deep 2,165 lin.ft. 10.00 21,650 8-10 feet deep 1,340 lin.ft. 12.00 16,080 10-12 feet deep 460 lin.ft. 15.00 6,900 McHenry Shores Area Sanitary Sewer System Estimate of Cost 4. Item Approximate Unit No. Description Quantity Price Amount 12. Restoration of streets, driveways and lawns, complete including removal and disposal of existing pavement materials, measured on the basis of trench length and pipe sizes, at the depths indicated: 8-inch compacted Type B aggregate base and 2-inch Class I bituminous concrete surface driveway pavement 8-inch 6-8 feet deep 170 lin.ft. $ 12.00 $ 2,040.00 8-inch compacted Type B gravel surface course for gravel driveways: 8-inch 0-6 feet deep 6-8 feet deep 40 lin.ft. 5.00 $ 200.00 30 lin.ft. 6.00 180.00 Lawns and parkways, 4 inches of topsoil, fertilizer and seeding: 8-inch 0- 6 feet deep 440 lin.ft. 2.75 1,210.00 6- 8 feet deep 2,430 lin.ft. 3.00 7,290.00 8-10 feet deep 1,505 lin.ft. 3.50 5,267.50 13. 12-inch compacted Type B aggregate base to be maintained as temporary street surface measured on the basis of trench length and pipe sizes, at the depths indicated: 8, 10 and 12-inch 0- 6 feet deep 6,240 lin.ft. 2.75 17,160.00 6- 8 feet deep 20,630 lin.ft. 3.00 61,890.00 8-10 feet deep 5,343 lin.ft. 3.50 18,700.50 10-12 feet deep 990 lin.ft. 4.00 3,960.00 12-14 feet deep 572 lin.ft. 5.00 2,860.00 1 14-16 feet deep 325 lin.ft. 6.00 1,950.00 16-18 feet deep 135 lin.ft. 7.50 1,012.50 18-20 feet deep 155 lin.ft. 9.00 1,395.00 McHenry Shores Area Sanitary Sewer System Estimate of Cost Item Approximate Unit No. Description Quantity Price Amount 13. Continued 15 and 18-inch 5. 0- 6 feet deep 270 lin.ft. 3.00 810.00 6- 8 feet deep 2,550 lin.ft. 3.50 S 8,925.00 8-10 feet deep 1,575 lin.ft. 4.00 6,300.00 10-12 feet deep 540 lin.ft. 4.50 S 2,430.00 14. Pavement surfacing, complete including base preparation, aggregate addition, priming and double seal coat: 54,220 sq.yds. $ 3.50 $ 189,770.00 15. Pavement surfacing, complete including base preparation aggregate addition, priming and 2 inches bituminous surface course: 21,830 sq.yds. $ 5.50 $ 120,065.00 16. Water main relocations: 8 each $ 600.00 $ 4,800.00 17. Pumping Station No. 1, complete in place, including a duplex submersible pumping station, a valve vault, 18-inch incoming sewer with gate valve, pump discharge piping and valves, 6-inch emergency pump- ing connection and valve, electrical control panel, gravel driveway, and other miscellaneous items of work ready for operation as shown on Sheet of the Plans: Lump Sum $ 80,000.00 18. Pumping Station No. 2, complete in place, including a duplex submersible pumping station, a valve vault, 10-inch incoming sewer with gate valve, 6-inch pump discharge piping and valves, 4-inch emergency pump- ing connection and valve, electrical control panel, gravel driveway, and other miscellaneous items of work ready for operation as shown on Sheet of the Plans: Lump Sum $ 60,000.00 McHenry Shores Area Sanitary Sewer System Estimate of Cost 6. Item Approximate Unit No. Description Quantity Price Amount 19. Portable gasoline engine -driven trash pumps: Lump Sum $ 40,000.00 TOTAL ESTIMATED CONSTRUCTION COST Bond Interest Reserve (6%) Cost of Levying and Collection (6%) Engineering ESTIMATED TOTAL PROJECT COST $2,399,394.50 143,963.75 143,963.75 297,500.00 $2,984,822.00