HomeMy WebLinkAboutResolutions - R-87-8 - 06/17/1987 - IDOT MFTSTAn of iwNOIS
RESOLUTION FOR MAINTENANCE OF STREETS AND HIGHWAYS BY
MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE
BE 1T RESOLVED, by tbA Council no the
(Condo ar hied" sad iilard d TnsGss)
City of McHenry IlliMois, that there is hereby
(Cor. Teve st TnMs) Dw)
appropriated the sum of 6 118,000 of Motor Fuel Tam funds for the purpose of maintaining
streets and highways under the applic" provisions of the Illinois Highway Code, from January 1, 19 8 7
tD December 31,19 87 - Section 87-00000-00-GM
BE IT FURTHER RESOLVED, that only those streets, highways, and operations as listed and described
on the approved Municipal Estimate of Maintenance Costs, including supplemental or revised estimates ap-
proved in oonneetion with this resolution, are eligible for -maintenance with Motor Fuel Tax funds during the
period as spwiW above.
BE IT FURTHER RESOLVED, that the Clerk shall, as soon as practicable after the close of the period
as given above, submit to the Department of Transportation, on forms furnished by said Department, a certified
statement showing expenditures from and balances remaining in the account(s) for this period; and
BE IT FURTHER RESOLVED, that the Clerk shall immediately transmit two certified copies of this
resolution to the district office of the Department of Transportation, at Schaumburg Illinois.
19--
Department of Transportation
District Engineer
I, Barbara Gilpin, Clerk
(Cur. TM K v1Ms+)
Clark In and for the City
(Cur. Tna w tlmgr)
of McHenry " County of., McHenry
hereby certify the foregoing to be a true, perfect and complete
copy of a resolution adopted by the _ Council
(Cnsft er trsddeat sM 1/srd of Ttestw)
D
at a meeting o* UNE 11 , 19 87
IN TESTIMONY/WHEREOF, I have hereunto set my hand
and seal thl 1 0 * day
A.D. 19 $ 7 _
MAP
city.
- Clerk
(CRY. Test K Ymsp)
BLR4123(Rev.3-84)
(1987 Maintenance)
MUNICIPALITY McHenry
lair's QEpartmerd Maintenance Englneering to be
of ltansportaWn Performed by a Consulting 6nglnoer
(to be attached to Municioal Estimate
of Maintenance Costs, SLR 7302 (Rev. 3-84)
The services to be performed by the engineer, pertaining to the various Items of work included In the es-
timated cost of maintenance operations, on form BLR 7302, shall consist of the items checked below:
PRELIMINARY ENGINEERING shall include:
Investigation of the condition of the streets; determination (in consultation with the
municipal officials) of the maintenance operations to be included in the maintenance
program; preparation of the maintenance resolution, estimate and proposal attending
such meetings of the governing body as may reasonably be required; attending the pub-
lic letting and preparing the contract or acceptance of proposal forms; and the prepara-
tion of the maintenance expenditure statement.
ENGINEERING SUPERVISION shall include:
Furnishing the engineering field supervision (including preparation of payment esti-
mates or checking material invoices) of those special maintenance operations requiring
professional supervision, as opposed to those ordinary operations such as street sweep-
ing, snow removal, tree trimming, crack filling, cleaning ditches and culverts, etc., which
require no professional supervision.
For furnishing these services the engineer will be paid in accordance with the following schedule of fees.
The fee for Preliminary Engineering shall be applied to the total estimated cost of all maintenance opera-
tions included in the maintenance estimate except Maintenance Engineering. The fee for Engineering
Supervision shall be applied to the final total cost of those maintenance operations to be supervised by
the engineer. Ten percent of the total fee will be withheld until such time as the expenditure statement is
submitted and the final cost of supervised items is known.
The engineer is hereby authorized and directed to sign the Municipal Esti-
mate of Maintenance Cost, form BLR-591-1 or BLR 7302 on behalf of the
Municipalitv.
SCHEDULE OF FEES
Preliminary
Engineering
Operation to be supervised
Show numbers (BLR 7302)
Maintenance Cost
Engineering
9 g
Supervision
and their total estimated
cost
First$5,000
$375.00 L.S.
$450.00 L.S.
4ext $10,000
5.0%
5 0%
Vext $15,000
4.0%
3.5%
above $30,000
3. 5 g
3.5 %
�a�G%�G�r-��-C�c.. � SIGNATURES:
Y Baxter & Woodman, Inc.
Municipal Offic' I C.onns�sultin Engineer
City Clerk By. G�.r��,,/Vice Pres .
Title (seal)
/
T ` V ,it7 June 10, 1987
Date Date
BLR 4310
(2-84)