Loading...
HomeMy WebLinkAboutResolutions - R-90-21 - 12/12/1990 - IDOT MFTR-90-21 MUNICIPALITY McHenry 1991 Maintenance Illinois Department Maintenance Engineering to be of Transportation Performed by a Consulting Engineer (to be attached to Municipal Estimate of Maintenance Costs, BLR 7302 (Rev. 5/86) The services to be performed by the engineer, pertaining to the various items of work included in the es- timated cost of maintenance operations, on form BLR 7302, shall consist of the items checked below: PRELIMINARY ENGINEERING shall include: Investigation of the condition of the streets; determination (in consultation with the municipal officials) of the maintenance operations to be included in the maintenance program; preparation of the maintenance resolution, estimate and proposal attending such meetings of the governing body as may reasonably be required; attending the public letting and preparing the contract or acceptance of proposal forms; and the preparation of the maintenance expenditure statement. ENGINEERING SUPERVISION shall include: Furnishing the engineering field supervision (including preparation of payment esti- mates or checking material invoices) of those special maintenance operations requiring professional supervision, as opposed to those ordinary operations such as street sweep- ing, snow removal, tree trimming, crack filling, cleaning ditches and culverts, etc., which require no professional supervision. For furnishing these services the engineer will be paid in accordance with the following schedule of fees. The fee for Preliminary Engineering shall be applied to the total estimated cost of all maintenance operations included in the maintenance estimate except Maintenance Engineering. The fee for Engi- neering Supervision shall be applied to the final total cost of those maintenance operations to be super- vised by the engineer. Ten percent of the total fee will be withheld until such time as the expenditure statement is submitted and the final cost of supervised items is known. CERTIFICATION OF ENGINEER "The ENGINEER certifies that he/she and his/her principals have not been barred from signing this AGREEMENT as a result of a violation of Sections 33E-3 and 33E-4 of the Criminal Code of 1961 (Chap- ter 38 of the Illinois Revised Statutes)." SCHEDULE OF FEES Maintenance Cost Preliminary Engineering Engineering Supervision Operation to be supervised Show numbers (BLR 7302) and theirtotal estimated cost First$5,000 $375.00 L.S. $450.00 L.S. Next $10,000 5.0% 5.0% Next $15,000 4.0% 3.5% Above $30,000 3.5% 1 3.5% SIGNATURES: By BAXTER & WOODMAN, INC. Municipal Offic' I Consulting Engineer City Clerk By ���� <jrsG' Vice Pres. Title (seal) May 3, 1990 Date Date BLR 4310 (Rev. 3/89) IL 494-0325