HomeMy WebLinkAboutPacket - 10/09/2017 - Public Works Committee (2) ti MCHenr Public Works Committee Municipal Center 333 S Green Street, McHenry, IL 60050 October 9, 2017 — 6:30 PM Meeting Agenda I. Call to Order 2. Public Comment: People wishing to address the Committee will be asked to identify themselves for the record and will be asked but are not required to provide their address. Public comment may be restricted to three-minutes for each individual speaker. Order and decorum shall be maintained at all public meetings. 3. Discussion regarding Pedestrian Crosswalks on Green Street. 4. Discussion regarding the Installation of Radar Speed Signs. 5. Discussion regarding Public Works 5-Year Capital Improvement Program 6. Committee Comments. 7. Motion to Adjourn. The City of Mellemy is dedicated to providing its citizens,businesses,and visitors with the highest quality grprograms and services in a custom er-orien ted,erficient,and fiscalli'responsible manner. Department of Public Works Jon M.Schmitt, Director 1415 Industrial Drive McHenry, Illinois 60050 Phone: (815) 363-2186 Fax: (815) 363-2214 McHenr www.ci.mchenry.il.us COMMITTEE AGENDA SUPPLEMENT DATE: October 9, 2017 TO: Public Works Committee FROM: Jon M. Schmitt, Director of Public Works RE: Discussion regarding pedestrian crosswalks on Green Street Public Works Committee Chairman Santi requested Committee discussion regarding pedestrian crosswalks on Green Street from Waukegan Road north to the Boone Lagoon Bridge. Currently there are pedestrian crosswalks at the intersection of Waukegan Road and Green Street. There is also a pedestrian crosswalk between the Riverwalk sidewalk and 1111 North Green Street crossing Green Street. Accident data provided by the McHenry Police Department reveals one pedestrian related accident at the intersection of Green Street and Waukegan Road within the last four years. Possible pedestrian crosswalk enhancements at this location might include repainting of the crosswalk between the Riverwalk sidewalk and 1111 North Green Street to the "block style" similar to the other crosswalks in the vicinity and installing additional pedestrian crossing signage. The City of McHenry is dedicated to providing the citizens,businesses and visitors of McHenry with the highest quality of programs and services in a customer-oriented,efficient and fiscally responsible manner. Department of Public Works Jon M.Schmitt, Director 1415 Industrial Drive McHenry, Illinois 60050 Phone: (815) 363-2186 McHenr wFax: (815) 363-2214 ww.ci.mchenry.il.us COMMITTEE AGENDA SUPPLEMENT DATE: October 9, 2017 TO: Public Works Committee FROM: Jon M. Schmitt, Director of Public Works RE: Discussion regarding radar speed sign ATT: Traffic Control & Protection Inc. quote Alderman Glab requested Public Works Committee discussion regarding installation of radar speed signs. Staff received the attached quote from Traffic Control & Protection Inc. for a Wanco pole mounted radar speed sign in the amount of $4,813.00 (mounting pole not included). The display on the radar speed sign is 13 inch LED characters with a battery-powered automatic solar- based charging system. The following locations were provided by the McHenry Police Department as having received the most speeding traffic complaints: • Richmond Road (Route 31) north of Pearl Street (requires Illinois Department of Transportation approval for sign placement) • Dartmoor Drive between Curran Road and Crystal Lake Road • Anne Street between Front Street (Route 31) and Green Street Staff is proposing to purchase one sign at the present time as a trial to be installed at one of the locations listed above as directed by the Public Works Committee. The City of McHenry is dedicated to providing the citizens,businesses and visitors of McHenry with the highest quality of programs and services in a customer-oriented,efficient and fiscally responsible manner. GpSiSR0t 6 p'POf��' Traffic Control & Protection Inc. Quote T x 225 Miles Parkway °o � i Bartlett, IL 60103-2502 Date Quote# b 4 Phone:630-293-0026 Fax:630-497-0526 7 3 O4<<lNING v+ Bill To: Ship To: City Of McHenry City of McHenry 333 S Green Street Attn: Ron McHenry, IL 60050 1415 Industrial Dr McHenry, IL 60050 Terms Rep FOB Shipping Method Estimated Ship Date Net SFG Bartlett Best Way 5-6 Weeks Item Description Quantity Cost Subtotal Speed Radar Wanco Pole Mount Speed Radar(WSD2430P) 1 4,563.00 4,563.00 Text Box Includes: 0 0.00 0.00 13"LED Characters Radar Speed Sign 24"X 30" w/4"to 4-1/2"Round Pole Brackets Electronics Control Box Text Box Solar Panel Assembly(65W on Tilt Frame) 0 0.00 0.00 Battery Box(Aluminum Enclosure w/Pole Brackets) Batteries(2-AGM GRP 27) 'Pole Not Included` -------------------- -------------------------—---------------------------------- 0 0.00 0.00 Shipping&Handling Drop Shipped Direct From Mfg 1 250.00 250.00 Shipping&Handling This is a quote only. Please DO NOT remit payment. Thank you. Subtotal $4,813.00 Orders for custom products cannot be cancelled or returned once order has been Tax $0.00 placed. TCP has a 30 day return policy on all products that we sell. Please call ahead for approval on any returns. Standard restocking charge is 25%. Total $4,813.00 Signature Page 1 of 1 3 C3Yt , YOUR PEED u, 4 gANCO Driving traffic safety. 800-972-0755 mmwancoxom . • ere Traffic calming in locations wh x �> vehicles regularly travel at unsafe speeds ■ Configurable settings SPEED ■ Choice of sizes and mounting options LIMIT ■ Battery or AC powered ■ Optional 365-day timer 35 Commonly deployed in school zones,construction areas,high-accident areas and neighborhoods,Wanco speed signs provide a strong measure of traffic calming unmatched ...... by other roadway signs.With a radar-triggered display,bright LED characters flash a vehicle's YOURexcessive speed,thereby encouraging tite motorist to slow down. P E E D Wanco radar-speed signs feature configurable settings and input for auxiliary equipment,such as caution beacons.Above the user-configured speed setting,the sign(lashes the motorist's speed.At excessive speeds,tiie sign flashes a user-selected message.Below the speed limit,the display remains blank. Displays are available with either 13-or 26-inch characters.Both sizes can display two characters for miles per hour and three characters for kilometers per hour.Optical lenses and sun shades over bright LED characters produce superior visibility. Pole-mount kits provide advanced speed-display in an easy-to-use,fixed-mount system.A typical configuration includes the speed display,a control box,battery box,solar panel,and all necessary wiring. A regulatory speed limit sign is optional,as are a variety of auxiliary devices. For more information,call 800.972.0755 or visit wanco.com. OUR SPEED Sign specifications YOUR Character size Enclosure size,W x H x D SPEED I 13-inch 24 x 30 x S in. (61 x 76 x 13(m) t.: 26-inch 36x36x5in. (91x9lxl3cm) Power system options Small sign large sign Commercial power 110/120VAC,haid-wired Battery/solar 12VDC battery power,65W solar-panel charging system,70 All battery capacity , i f a 1 Due to wanco's commitment to continuous Improtement or our products,all inrormation is subject to change%ithout notice.Wanco and the lVanco logo are registered trademarks or Pfanco Inc WANCO INC. 0 5870 Tennyson Street Arvada,Colorado 80003 800.972.0755 303.427-5700 303-427.5725 fax svlvsv.wanco.com Ma Prfn[etl on recycled paper 020121•ianco Inc.All rights reserved.Printed in the USA 1 wPB0032 December 2012 Priority C—DESIRABLE Projects needed for the proper expansion of a City service or facility, the exact timing of which can be deferred until adequate funding sources can be secured. Priority D—DEFERRABLE Projects which would be needed for ideal operation but which cannot yet be recommended for action. These can be postponed without detriment to present services. Projects that are ranked within the same classification can be distinguished further based on public health and safety considerations, breadth of service area, and/or the availability of matching funds from other sources. When determining the appropriate project funding levels throughout the 5-year program period, one or more of the following options are exercised: • Recommend funding the project in the year and the amount requested by the Department Director. • Recommend partial funding of the project in the year requested. • Recommend delaying funding of the project to another fiscal year. • Recommend setting aside a portion of the requested money each year to save enough to fund the project in a future year. • Recommend that the project not be funded at all. The Capital Improvement Program is a planning tool, not a budgeting tool, and as such even projects that receive an "A" priority may not be able to be funded in any given budget year. However, prioritization of projects serves as a guide in preparing the annual City budget and can assist the City Council in arriving at project funding decisions given limited resources. STREETS/SIDEWALKS/SIGNALS: FY 18/19 Requested Project Narratives Project: Pearl Street/Lincoln Road Improvements Priority Ranking: A Funding Request: FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total $2,295,000 -0- -0- -0- -0- 12,295,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total General Fund $794,500 -0- -0- -0- -0- $794,500 STP Funds $1,500,000 -0- -0- -0- -0- $1,500,000 -.,:,�:::,;,..::::.�:..,:.�, ,,. ....•,,..:�,< a ::ur a�:Descr� Pion The McHenry County Council of Mayors placed the Pearl Street/Lincoln Road Improvements project on their FFY 2019 program for $1,500,000 of Surface Transportation Program (STP) funding. Due to recent updates to the STP funding schedule local projects are being allowed to move to construction as soon as project readiness allows. The McHenry Township Road District has committed to allocating funds towards Phase III Engineering and construction of improvements which fall under their jurisdiction which is approximately 1,100 linear feet of Lincoln Road. The project will include intersection capacity improvements, on-street bicycle lanes between Illinois Route 31 and the Fox River, an off-street bicycle path between the Fox River and Chapel Hill Road, sidewalk improvements to conform to the latest accessibility guidelines, curb and gutter replacement, bridge deck rehabilitation and resurfacing. STP funding will pay for up to 80% of the total cost of construction and Phase III engineering with a local match requirement of 20%. The City is responsible for 100% of Phase I and 11 Engineering costs. In fall of 2016 an inspection of the concrete deck on the Pearl Street Bridge was performed. As a result of the inspection concrete bridge deck repairs were identified with an estimated construction cost of $250,000. The City will be responsible for 100% of the deck repair costs because the structural sufficiency rating for the bridge is above threshold levels for federal participation. General Fund revenues will be utilized for the City's cost of the project. On September 14, 2015 City Council approved a Preliminary Engineering Services Agreement for Motor Fuel Tax Funds with HR Green, Inc. in a lump sum amount of $169,200.00 for Phase I & II Engineering of the Pearl Street/Lincoln Road Improvement. Also included in the contract bid plans is the extension of approximately thirty-five sanitary sewer stubs from the sanitary sewer main under the Lincoln Road pavement to the homeowner's property line. City staff and the City Attorney are investigating option to recapture the cost of the sanitary sewer stub installations through future annexation agreements, adoption of requiring payment upon connection or creation of a special service area assessment (SSA). The contract documents are being prepared to meet an April 2018 IDOT letting date. Project: Curran Road (formerly Draper Road) S-Curve Safety Improvements Priority Ranking: A Funding Request: FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total 35,000 $460,000 -0- -0- -0- 1495,000 Funding Source(s): FY18/19 FY19/20 FY20/21 FY21 22 FY22/23 Total General Fund $3,500 $68,500 -0- -0- -0- $72,000 HSIP Funds $31,500 $391,500 -0- -0- -0- $423,000 , The Illinois Department of Transportation though the Highway Safety Improvement Program (HSIP) awarded $450,000 for this project. The improvements on Curran Road from approximately 400 feet south of Route 120 to Ojibwa Lane includes super-elevated pavement, paved shoulder with rumble strips, ditch grading for recoverable slopes, pavement markings and additional signage. HSIP funds pay for 90% of Phase I & 11 engineering, construction and Phase III engineering. General Fund revenues will be utilized for the City's cost of the project. On November 2, 2015 City Council approved a Preliminary Engineering Services Agreement for Federal Participation with HR Green, Inc. in an amount not to exceed $29,990.27 for Phase I Engineering of Curran Road (formerly Draper Road) S-Curve Safety Improvements. Phase I Engineering is anticipated to be completed in fall of 2017 and Phase 11 Engineering will begin upon IDOT approval of the Phase 1 Project Development Report. Construction is currently anticipated to be completed in 2019. 0 Project: Ringwood Road Improvements Priority Ranking: A Funding Request: FY18/19 FYi9/20 FY20/21 FY21/22 FY22/23 Total 264,500 -0- -0- -0- -0- $270,000 Funding Source(s): FY18/19 FYI 9 20 FY20/21 FY21/22 FY22/23 Total General Fund $53,000 -0- -0- -0- -0- $58,500 STP Funds $211,500 -0- -0- -0- -0- $211,500 :...::.:..:.. L. Pro ect,:Pur os ' , �::.:.:...:..:.:>:.:.:....,..:,�::,:.:.�.r,3,:�.-::,.:-.:, ..�,�,.. : � scr� ton: B = The McHenry County Council of Mayors awarded $1.5 million dollars though the Surface Transportation Program (STP) for this project. The Village of Ringwood is the lead agency on the Ringwood Road Improvement Project (Route 120 to Spring Grove Road). The Village of Johnsburg, McHenry Township Road District and the City of McHenry are participating on their respective jurisdictional responsibility. The Village of Ringwood completed the Phase 1 on the proposed project. The Village of Johnsburg and the McHenry Township Road District have also committed to allocating funds towards Phase II Engineering and construction of the road improvements. The City of McHenry's portion of the project is approximately 3,200 feet of Ringwood Road, north of Route 120. The proposed improvements consist of hot-mix asphalt surface removal, hot-mix asphalt resurfacing with binder course and surface course, patching and pavement striping. STP funding will pay for up to 80% of the total cost of construction and Phase III Engineering with a local match requirement of 20%. General Fund revenues will be utilized for the City's cost of the project. On June 5, 2017 the City Council approved an inter-governmental agreement for the City's portion of local participation for construction and phase III Engineering. The approved City portion for construction and Phase III engineering is $52,800. This project will be let to bid on the January 19, 2018 ]DOT State Letting. Project: Street Program Priority Ranking: A Funding Request: I FY18/19 FY19/20 I FY20/21 I FY21/22 I FY22/23 Tot", [�8—,4-93,314 $11,726,605 $14,354,524 $9,007,689 1 $1,961,531 $45'54'-16/—'-J Funding Source(s): FY18/19 FYI /20 FY20/21 FY21/22 FY22/23 Total tA AOq q ID i'R 0 J-4, The city has approximately 125 centerline miles of roadway under their jurisdictional responsibility. To establish the priority list of street improvements, staff and the city engineer visit each street to verify and inspect the current condition of the pavement in order to rank streets for improvement. Street ranking is based on a 10 point system,with the ranking of #1 being equivalent to a gravel road and a ranking of #10 being equivalent to a newly paved road. Based on the most recent rankings, verified in 2017, funding was requested in FY18/19 in the amount of $8,493,314 for streets with a ranking of 43; FY 19/20 in the amount of $11,726,605 for streets with a ranking of #4; FY20/21 in the amount of $14,354,524 for streets with a ranking of #5; FY21/22 in the amount of $9,007,689 for streets with a ranking of #6; and FY22/23 in the amount of $1,961,531 for streets with a ranking of #7. Unfortunately, the amount of improvements far outweighs the dollars available in Motor Fuel Tax (MFT) revenues and/or General Fund revenues to be able to undertake these projects. In fact, in recent years, MFT dollars have been dedicated to a combination of purchasing road salt and as the local match for multi-jurisdictional/multi-funding source projects. The needs of the Streets Program are only increasing, not diminishing and, as such, beginning in FY14/15 the City Administration made a concerted effort to dedicate a portion of General Fund Revenues to fund the Street Program. While it is not possible that all of the annual needs of the Street Program can be met, it is step towards addressing the highest priority/lowest ranked streets. Project: Pavement Maintenance-Cracksealing and Reclamite Priority Ranking: A Funding Request: FY18/19 I FY19/20 I FY2 21/22 FY22/23 Total 1 $50,0001 $75,0001 $75,0001 $75,000 $75,000 $350.000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 -FY22/23 Total General Fund $50,000 $75,000 $75,000 $75,000 $75,000 $350,000 Revenues MOP d. ws-c-AP.I., on . n,;-�J,e n. Reclamite is an asphalt rejuvenator that is applied on the newly paved roads within the first year to extend the life of the road. This will be applied on the roads that were resurfaced in 2017. All the roads that can be crack sealed are complete at this time. At some time in the future with the roads that have been paved in the last seven to ten years crack sealing will start again. Project: Sidewalk Program Funding Request: A FYl8/19 FY19/20 I FY20/21 I FY21/22 FY22/23 Total 75,000 $75,0001 $75,000175,000 1 $75,0001 $375,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total General Fund $75,000 $75,000 $75,000 $75,000 $75,000 $375,000 Revenues , Sidewalks are removed and replaced by Public Works Staff on an as-needed basis. Sidewalk repairs are also included in the annual road resurfacing program. Sidewalks with major cracks and significant spalling are replaced. In addition, sidewalk crossings that require ramp retrofits to meet the requirements of the Americans with Disabilities Act (ADA) are constructed. Staff recognizes the need for a sidewalk program due to the large amount of sidewalks throughout town that are deteriorated, do not meet ADA requirements, and gaps that exist between the sidewalk networks. Sidewalks improve pedestrian safety, by separating vehicle and pedestrian traffic. Project: Bull Valley Road Bike Path Extension Phase I Engineering Priority Ranking: A Funding Request: FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total $37,500 -0- -0- -0- -0- $37,500 Funding Source(s): FY18/19 FY1 9/20 FY20/21 FY21/22 FY22/23 Total General $37,500 -0- -0- -0- -0- $37,500 Fund fi -d" M "-". ....... ene This request is for funding for Phase I Engineering Services for the Bull Valley Road Bike Path Extension Project. As part of the Bull Valley Road/Charles J. Miller Road project from Illinois Route 31 to River Road, the McHenry County Division of Transportation (MCDOT) installed a 10-foot wide shared-use path along Charles J. Miller Road from the intersection of Illinois Route 31 to the entrance of Moraine Hills State Park. While the path's construction along the County Highway provides mobility for pedestrians and cyclists, it does not provide a connection to the McHenry County Conservation District Prairie Trail located 4,300 feet west of Illinois Route 31. This project has been identified by regional planning agencies as a high priority project which may be eligible for federal grant funding such as TAP or ITEP. Projects which are funded through these programs are not typically eligible for federal funding for Phase I Engineering. Phase I Engineering Services will need to be completed in order for federal grant funding to be awarded for Phase 11 Engineering along with Construction and Phase III Engineering Services. The City and the McHenry County Division of Transportation have been seeking to partner with an intergovernmental agreement to share engineering and construction costs, pursue grant funding, coordinate land acquisition, and negotiate With the Union Pacific Railroad to install a pedestrian crossing. The Division of Transportation has carried this project in its five year Transportation Program and has included funding for Phase I Engineering for this project in its FY 2018 budget. The results of the Phase I Engineering Study will allow the City to identify an Engineer's Opinion of Probable Cost to the project and pursue federal grant funding for this project. When completed this project will enhance mobility for pedestrian cyclists between two major regional trail systems and allow City residents better access to such trail systems. Project: Green Street Bridge Rehabilitation Priority Ranking: B Funding Request: FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total 400,000 -0- 1 -0= -o- -0- 400,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total General Fund $400,000 -0- -0- -0- -0- $400,000 5` - ose ,Des e The Green Street Bridge, which was constructed in 1949, is in serviceable condition and Will not be in need of replacement for some time. Currently the sufficiency rating of the bridge does not make it eligible for federal participation for replacement or major rehabilitation. However, the bridge has shown sufficient deterioration that minor rehabilitation will be required to maintain the bridge until a point in time at which it would become federally eligible for replacement. Recent inspections have shown that the concrete sidewalks are in need of replacement as well as needed repairs and reconnections for the bridge railing. The concrete fascias which support an above ground stream crossing for a city water main are also showing heavy deterioration and may be in need of minor structural repairs. Other minor work would include rehabilitation of the approach pavement which has settled behind the abutments and a replacement of the asphalt wearing surface. City Council approved a Professional Services Contract with Bollinger Lach and Associates, Inc. on July 17, 2017 in the amount of $17,650 professional engineering design services for the rehabilitation of the Green Street Bridge. This project will enable the City to maintain the structure until it can be eligible for federal funding for replacement. Project: Medical Center Street Lighting Priority Ranking: B Funding Request: FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total 50,000 -0- -0- -0- -0- $50,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total General $50,000 -0- -0- -0- -0- $50,000 Fund - ec The existing street lights on the City Streets surrounding the hospital are approximately 30 years old and are beginning to experience structural failure in their attachments to their concrete foundations. A number of existing locations in the area have experienced fallen poles. The existing wiring, conduits, control cabinets, and concrete foundations all appear to be serviceable. City staff has inquired to local lighting and electrical contractors soliciting quotes for the replacement of the existing poles while reusing the remainder of the existing installation. However, the project is of such cost that a competitive bidding process will be required in order to secure a contractor. This project will replace the existing street lighting and reinstall new light poles thereby reducing the risk to the City and the motoring public of damage caused by fallen street lighting poles. Project: Tree Replacement Program Priority Ranking: B Funding Request: FY18/19 I FY19/20 I FY20/21 I FY21/22 I FY22/23 Total $25,000 1 $25,0001 $25,000 1 $25,000 1 $25,000 1 $125,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total General $25'.000 $25,000 $25,000 $25,000 $25,000 $125,000 Fund .......... -.2-N Due to the large number of trees lost within the City due to the Emerald Ash Borer the City has been planting replacement trees through various funding sources. This request would establish an annual program for the planting of trees within City Parkways and would be managed within house public works staff. The program will allow for annual planting of trees to enhance the character of the City streets and replace trees lost due to the Emerald Ash Borer. Project: Dartmoor Road Bridge Wearing Surface Funding Request: FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total -0- $20,000 $150,000 -0- -0- $170,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total General Fund -0- $20,000 $150,000 -0- -0- $170,000 c ,P r se es r� n The Dartmoor Road Bridge, which was constructed in 1998, is in relatively good condition. It will be sometime before any major rehabilitation or replacement would be necessary for this structure. This structure is a precast box beam design which includes a waterproof membrane and asphalt wearing surface. At this particular point in the service life of the structure the membrane and wearing surface are in need of replacement as is indicated in the most recent inspection report. The most critical element of bridges of this design to preserve are the precast beams and the best way to preserve them is to maintain the wearing surface in order to prevent leakage of water and deicing chemicals through the keyway joints between the precast beams. As the beams have begun to show keyway leakage, this point in the structure's life is the appropriate time to replace the wearing surface. This will prevent deterioration of the precast beams and extend the life of the overall structure. Project: Illinois Route 31/Veterans Parkway Traffic Signal Funding Request: FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Totat _a -0- -0- -0- 300,000 $300,000 : ec , u.r .ose .,Descri f ° • The annexation agreement for the Morgan Hills/Prairie Pointe Subdivisions states the developer shall be responsible for and pay the cost of the construction and installation of a traffic control signal at the intersection of Illinois Route 31 and Veterans Parkway. Traffic warrant studies have been performed by the Illinois Department of Transportation and at this time the current traffic conditions do not meet warrant requirements for the installation of a traffic control signal as outlined in the Manual on Uniform Traffic Control Devices, The developer currently has a letter of credit on file with the City to cover the cost of the traffic control signal once traffic warrants are met. STORMWATER/DRAINAGE: FY 18/19 Requested Proiect Narratives Project: Central Avenue Storm Sewer Priority Ranking: A Funding Request: FYi8/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total 270,000 -0- -0- -0- -0- $270,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total General Fund $270,000 -0- -0- -0- -0- $270,000 -- __ This project includes engineering and construction of storm sewer improvements in the area of Central Avenue, Clearview Drive, and Parkway Drive. Currently there are isolated areas along the rear loft lines on sections of Parkway Drive and Clearview Drive which do not have a drainage outlet. These areas tend to collect water which cannot drain out of the properties through an overland route but rather through infiltration even in small rain events. Improvements would include drainage collection structures installed along the rear property lines which are connected to a mainline storm sewer along Central Avenue which would outfall into the Lakeland Park Drainage Ditch. This improvement will provide drainage relief to a location within Lakeland Park for which overall improvements to the drainage ditch such as upstream detention will not provide complete relief. Project: Ramble Road Storm Sewer Priority Ranking: A Funding Request: FY1 8/19 FY1 9/20 FY20/21 FY21/22 FY22/23 Total $50,000 $500,000 -0- -0- -0- $550.000 Funding Source(s): Y18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total General $50,000 $500,000 -0- -0- -0- $550,000 Fund N This project includes engineering and construction of storm Sewer improvements in the area of Ramble Road and Home Avenue. Specific drainage improvements which will be determined in the project design phase are to include storm sewer piping, sheet flow modifications, and detention to reduce the risk of localized flooding. In order to construct a localized detention basin for this area property acquisition will need to be completed prior to any detention being constructed. $50,000 in FY18/19 is requested for property acquisition in order to complete design and construction in FY19/20, This area is currently served by open ditch drainage and driveway culverts with limited underground storm sewer pipe. Drainage improvements projects such as this repair and/or improve existing drainage structures in order to provide better protection for property and life from storm sewer runoff. Project: Lakeland Park Upstream Detention and Sediment Control Facility Priority Ranking: A Funding Request: FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total 225,000 1,110,000 -0- -0- -0- $1,335,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total General 370,000 Fund $ $445,000 -0- -0- -0- $815A00 IEPA Section 319 Grant $135,000 $665,000 -0- -0- -0- $800,000 Funding 7.hD.escri - ....::...: The Lakeland Park Drainage Ditch is located north of Elm Street (Illinois Route 120) between Ringwood Road and Maple Avenue. The ditch generally flows in an easterly direction to a point where it joins Boone Creek just upstream from the Fox River. Over the past several years the City has been addressing drainage problems within the Lakeland Park Subdivision. In 2016 HR Green Completed a Drainage Study for the entirety of the watershed which contributes flow to the drainage ditch. The findings of the study indicate that in order to reduce sediment pollution as well as catastrophic and nuisance flooding, an upstream wetland detention facility will be necessary to reduce the amount of storm flow and sediment entering the drainage ditch. The drainage areas within the watershed at the western limits contribute a significant amount of runoff, stream flow, and sediment to the drainage ditch. An upstream wetland detention facility would allow for a large portion of the runoff from these drainage areas which contribute much of the flow and sediment to the drainage ditch to be reduced. The wetland basin would detain flow and allow for sediment to be collected in locations which the City can maintain at regular intervals. The drainage ditch and associated network of culverts have limited capacity to pass flows during large storm events and the reduced flows would enhance the ability of the existing system to perform as it currently exists. This particular potential location for a wetland detention facility has been identified in the Boone-Dutch Creek Watershed plan recently completed by CMAP. Because it has been identified as a potential improvement in this plan, this particular project is a strong candidate for Illinois Environmental Protection Agency Section 319 Grant Funding for non-point source sediment reduction. A grant application for this project was submitted in August of 2017, the selection process will be ongoing through the early part of 2018. Should this project be selected, up to 60% of engineering and construction costs would be eligible for grant funding with the remaining 40% being the responsibility of the local agency through the utilization of General Fund revenues. FY 18/19 Complete Phase 1/II Engineering - $225,000 Property Acquisition - $280,000 FY 19/20 Complete Construction & Provide Phase III Engineering Services - $1,110,000 Project: Lakeland Park Drainage Ditch Bank Stabilizations Funding Request: FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total -0- -0- $100,000 $100,000 1100,000 $300.000 :... . ........:>_ ...:,-.,,_..,.. ....._ ....:... .. :, .,..<1',_- Desc�ri tionarl :.Ben --- ,:4 _ The Lakeland Park Drainage Ditch is located north of Elm Street (Illinois Route 120) between Ringwood Road and Maple Avenue. The ditch generally flows in an easterly direction to a point where it joins Boone Creek just upstream from the Fox River. Over the past several years the City has been addressing drainage problems within the Lakeland Park Subdivision. In 2016 HR Green Completed a Drainage Study for the entirety of the watershed which contributes flow to the drainage ditch. The findings of the study indicate that in order to prevent both catastrophic and nuisance flooding, an upstream detention facility will be necessary to reduce the amount of storm flow entering the drainage ditch and ultimately into Lakeland Park. Another maintenance concern for the ditch is the amount of bank erosion at locations along the channel. This erosion leads to sediment deposition in the channel and the potential destruction of property for homeowners along the channel. The recommended bank stabilizations may include rip rap armored stream banks, dredging of sediment, and construction of spurs to redirect flow. These improvements will reduce erosion and sediment deposition at further downstream locations as well as protect homes adjacent to the drainage ditch from property damage. The City wishes to pursue federal EPA grant funding if available in order to offset direct costs to the city. Project: Lakeland Park Culvert Replacements Funding Request: FY18/19 FY1 9/20 FY20/21 FY21/22 FYL2/=23 -o- -0- -0- $390,000 $610,000 FY23/24 FY24 25 FY25/26 FY26/27 FY27/28 Total $270,000 $540,000 $690,000 $780,000 $720,000 1 $4,000-000 The Lakeland Park Drainage Ditch is located north of Elm Street (Illinois Route 120) between Ringwood Road and Maple Avenue. The ditch generally flows in an easterly direction to a point where it joins Boone Creek just upstream from the Fox River. Over the past several years the City has been addressing. drainage problems within the Lakeland Park Subdivision. In 2016 HR Green Completed a Drainage Study for the entirety of the watershed which contributes flow to the drainage ditch. The findings of the study indicate that in order to prevent both catastrophic and nuisance flooding, an upstream detention facility will be necessary to reduce the amount of storm flow entering the drainage ditch and ultimately into Lakeland Park. Additionally, there are several culverts and structures along the drainage ditch which need to be increased in size in order to promote conveyance of water. The proposed culvert improvements will provide protection specifically for the blocks adjacent to the drainage ditch in catastrophic flooding events. It is recommended that the improvements begin at the furthest downstream locations and in latter program years the improvements will continue to progress upstream. The order of The following culvert crossings of the Lakeland Park Drainage Ditch are identified for replacement: FY 21/22 (subject to change due to staging/access) Maple Avenue - $390,000 FY 22/23 (subject to change due to staging/access) Orleans Street - $610,000 FY 23/24 (subject to change due to staging/access) Drainage Ditch Railroad Crossing - $270,000 FY 24/25 (subject to change due to staging/access) Oak Drive - $540,000 FY 25/26 (subject to change due to staging/access) Meadow Lane - $375,000 Willow Lane - $315,000 FY 26/27 (subject to change due to staging/access) Beach Street - $495,000 Lakewood Avenue - $285,000 FY 27/28 (subject to change due to staging/access) Park Lane Avenue - $295,000 Sunset Avenue - $210,000 Home Avenue - $215,000 UTILITY DIVISION CIP: FY 18/19 Requested Project Narratives Project: Pearl Street/Lincoln Road Sanitary Sewer Stub Extensions Priority Ranking: A Funding Request: FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total 425,000 -0- -0- 1 -0- 1 -0- $425,000 Funding Source(s): FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total Water/Sewer Revenues $425,000 -0- -0- -0 -0- $425,000 ro t�Pu se -Kip o :D and_ e ........ .. ........... . Included in the bid plans for the Pearl Street/Lincoln Road Improvements is the extension of approximately thirty-five sanitary sewer stubs from the sanitary sewer main under the Lincoln Road pavement to the homeowner's property line. City staff and the City Attorney are investigating options to recapture the cost of the sanitary sewer stub installations through future annexation agreements, adoption of requiring payment upon connection or creation of a Special Service Area Assessment (SSA). The contract documents will be prepared to meet a 2018 letting. Project: Water Main Replacement Program Priority Ranking: B Funding Request: FY18/14 I FY19/20 I FY20/21 I FY21/22 I FY22/23 Total $500,0001 $350,0001300,0001 $250,000 1 1250,000 1 $1,650,000 Funding Sources : FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total Water/Sewer 500 000 Revenues $ $350,000 $300,000 $250,000 $250,000 $1,650,000 se ur .De;IP cri n:a The most recent revision of the Capital Improvement Program created a budget line item for water main replacement. In 2007 the City Council approved an engineering service agreement with Smith Engineering Consulting (SEC Group) to create a water system model evaluating the overall performance of the system. In this report, areas of town were identified with "undersized"water mains, creating "bottle necks"where water hydraulically reaches maximum flow rates. This can pose issues for future development, fire protection, water quality, etc. Staff has been developing a water main replacement program for aging infrastructure, proactive replacement for future needs, and to address water quality issues. FY18/19 The existing 4" ductile iron and transite water main on Timothy Lane and Clover Lane is in need of replacement. Both locations have a long history of water main breaks due to the water main deteriorating due to corrosion, age, settlement, etc. Additionally the 4" diameter main is no longer compliant with current standards for size and capacity. Approximately 2,450 lineal feet of water main will be replaced and increased to a 8" diameter water main. Fire hydrants, valve vaults, new service lines and b-boxes will be installed per current standards. Other improvements may include incidental roadway resurfacing and minor drainage improvements such as concrete gutter and driveway culvert replacements. The approximate location of the proposed improvements is on Timothy Lane. and Clover Avenue with project limits between Dale Avenue and Green Street. City Council approved a Professional Service Agreement on July 17, 2017 with HR Green for design and bidding services for 32,311.40. FYI 9/20 The existing 4" transite water main on Oak Diver. is in need of replacement. The location between Shore Drive. and Prairie Ave has had several longitudinal water main breaks requiring partial sections to have to replace. Approximately 1,150 lineal feet of 4" diameter transite water main is to be replaced with an 8" diameter water main. Fire hydrants, valve vaults, new service lines, and b-boxes are to be installed per current standards. Required professional engineering services will include design services, bidding services, and resident engineering services. FY20/21 The water main on Green St. between Waukegan Road and Kane Avenue is undersized and are in need of replacement. The approximately 1,900 lineal feet of 4" and 6" water main between Waukegan Road and Kane Avenue its undersized and creates a bottleneck, upsizing to a 12" water main will eliminate the bottleneck and provide better water qualify and fire flow to the Green Street business district and surrounding area. Fire hydrants, valve vaults, new service lines, and b-boxes will be installed per current standards. Required professional engineering services will include design services, bidding services, and resident engineering services. FY20/21 The water main on Richmond Road. (between Washington Street and Broad Street) and Broad Street. (between Richmond Road and Green Street) are undersized and in need of replacement. The approximately 400 lineal feet of 6" water main on Richmond Road and 1,300 lineal feet of 4" water main on Broad Street are undersized and replacement with 12" water main would improve fire flow and water quality to the surrounding area. Fire hydrants, valve vaults, new service lines, and b-boxes will be installed per current standards. Required professional engineering services will include design services, bidding services, and resident engineering services. Project: Sanitary Sewer Main and Manhole Rehab Program Priority Ranking: B Funding Request: FY18/19 FY19/20 I FY20/21 I FY21/22 I FY22/23 Total $160,000 $160,000 1 $160,0001 $160,000 1 $160,000 1 $800,000 Funding Source(s): FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total Water/Sewer $160,000 $160,000 Revenues $160,000 $160,000 $160,000 $800,000 one-If .. ....... 07.0 P, :e*,. VAP P--- n;,,.. Over half of the water flow entering the treatment plants approximately 1,000,000 gallons per day, is groundwater and does not need to be treated. This groundwater enters the sanitary sewer system through cracks, breaks and loose joints in the sewer mains. During a severe rain event, over 2,000,000 gallons of ground water could potentially enter the sanitary sewer system per day. This amount of groundwater entering the treatment plants on a daily basis severely restricts the capacity and performance of the treatment plants. By eliminating as much of this infiltration as possible the City can greatly increase the capacity and effectiveness of the treatment plants. The infiltration and inflow is reduced or stopped by inserting a new lining in the existing sewer main thereby stopping the flow of groundwater into the sewer main. With this improvement the treatment plant would perform better and have reduced operating costs. The CIPP (cured in place pipe) lining also extends the life of the sanitary main without excavation. Through the joint bid process the City Of McHenry will have lined approximately 1,400 linear feet in FYI 6117 and approximately 7,800 linear feet FY 17/18 CIP. This is a multiyear contract extending through FY 19/20 done through the joint bid process with the cities of Cary and Huntley. During rain events and areas where the water table is high, rain and groundwater can enter the sanitary collection system through deficiencies in aging structures. This inflow and infiltration will increase the volume of sewage that will need to be treated. Eliminating open manhole covers with new sealed frames and covers will reduce inflow from rain water runoff. There are different types of spray liners that can seal and improve the integrity of the structure. By reducing or stopping inflow and infiltration this improves the operation of pumps at lift stations and the wastewater treatment plants. Project: Utility Division -Sewer Camera Replacement Priority Ranking: B Funding Request: FY18/19 PY19/20 FY20/21 PY21/22 FY22/23 Total $55,000 -0- -0- -0- -0- 55,000 Funding Source(s): FYI 7/18 FY18/19 FYI 9/20 FY20/21 FY21/22 Total Water/Sewer $55,000 -0- -0- -0- -0- $55,000 Revenues In 2011 The City Of McHenry purchased an Aries Pathfinder TR3300 tractor and camera system. This camera is capable of televising a 6" to 12" sanitary sewer main. Over the last two years the camera has needed repairs to components that have worn out due to routine televising of the collection system. The purchase of the Aries Pathfinder TR3310 will let personnel televise up to 24" sanitary sewer main. This new tractor and camera will televise the large pipes in the collection system without having the cost of changing the entire system. Aries is the sole provider due to system software. Project: Utility Division -Motor Pool Replacement Priority Ranking: B Funding Request: FY18_19 FY19/20 FY20/21 FY21/22 FY22/23 Total -0- $110,000 $150,000 $15,000 85,000 $360,000 Funding Source(s): FY18/19 FY19/20 Y210/21 FY21/22 FY22/23 Total Water/Sewer Revenues -0- $150,000 1150,000 $15,000 $85,000 The purpose of this project request is for the replacement of Utility Division motor pool vehicles. Vehicles proposed for replacement throughout the 5-year CIP planning period are as follows: FYI 8/19 - None FYI 9/20 -2008 Ford F350 2wd Utility Truck (I ton with lift gate),2006 Ford F250 4X4 w/ Plow,Easement sewer jetting machine FY20/21 -2005 Case 590 Super M tractor, 1994 Air Compressor FY21/22-2006 Wells Cargo Trailer (Water Main Break Trailer) FY22/23-2007 Mini Excavator, 2007 Mac-Lander Flatbed Trailer MOTOR POOL/EQUIPMENT: FY 18/19 Requested Project Narratives Project: Streets Vehicle-Replacement Priority Ranking: A Funding Request: FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total 830,00 $595,000 $408,000 $415,000 $227,000 $2,475,000 Funding Source(s): FYI 8/19 FYI 9/20 FY20/21 FY21/22 FY22/23 'total General Fund $830,000 $595,000 $408,000 $415,000 $227,000 $2,475,000 Revenues "1., ....a:. ,..,....i.:..,....,.... ,.,.., ,...:.. ,:..._.»...-:.. ..,::....::. .rr ....Co,.,...• •;;:cx::.r-.^,iY:S':-, r.r. i, '>=ir._ t- c it The FY18/19 proposed project includes the replacement of; two (2) 2001 International dump trucks, one with a wing plow and two (2) 2002 international dump trucks; replacement of a 2003 Ford pickup truck, and replacement of a 2004 Chevy pickup truck. Future needs include: • FYI 9/20 - Replacement of a 2003 International dump truck, replacement of a 2004 International dump truck with an under belly plow and replacement of a 2005 international truck. Replacement of a 2006 ford one ton dump truck. • FY20/21 - Replacement of two (2) 2006 International dump truck. Replacement of a 2008 ford pickup trucks. • FY21/22 - Replacement of two (2) 2008 International dump trucks, one with an underbelly plow. Replacement of a 2012 Ford F250 pickup truck. • FY22/23- Replacement of a 2011 International dump truck with an underbelly plow. Replacement of a 2006 one and a half ton mechanics truck. Project: Streets-Equipment Replacement Priority Ranking: A Funding Request: FY18/19 FYI/20 FY20/21 I FY21/22 FY22/23 Total i 30,000 $160,000 1120,0001 $60,000 1 $60,000 520,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total General Fund $130,000 $160,000 $120,000 $60,000 $60,000 $520,000 Revenues cat #ion::and:=Benefit:,:.•,,,;;,,..;• The FY18/19 proposed project includes the replacement of a Case loader/backhoe that is more than twenty (20) years old. Future needs include: • FY19/20 — Replacement of a 2005 Case Ioader/backhoe and a 2003 Dyna-pac roller. • FY20/21 - Replacement of a 2005 Case uni loader, 2005 Morbark chipper. • FY21/22- Replacement of a 2007 Morbark chipper. • Fy22/23 - Replacement of a 2003 New Holland mowing tractor. PUBLIC FACILITIES: FY 18/19 Requested Protect Narratives Project: Public Works Facility Improvements Priority Ranking: B Funding Request: FY18/19 I FY19/20 I FY20/21 FY21/22 I FY22/23 Total 85,000 100,000 0 0 0 185,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total General Fund $85,000 $l 00,000 -0- -0- -0- $185,000 n escri tio•n`:° ,`nd>Bene�f�t:�;:_,,>..::,: <;:.._. ._ ..._�.�-;_:�::: y .:... .:.,_,,:.:_..: e,ct,P:u.K _ose j FYI 8/19 Fuel Station: Currently all City of McHenry Equipment and Vehicle's get fuel from Petro Choice here in McHenry. Petro Choice has had some recent issues with their tanks and pumps forcing us to use a temporary fueling system at Public Works. During the repair they had mentioned that at some point it wouldn't be worth it for them to continue to maintain their fueling system. Staff recommends constructing our own fueling system at the Public Works Facility. FYI 9/20 Covered Salt Storage Bin: Currently the Public Works Department has,a 500 ton salt storage facility located at the South Wastewater Treatment Plant. During the snow season salt is also stored inside the Public Works Facility; this is not a long term solution due to the potential damage the salt moisture might cause to the interior of the building. Staff recommends constructing a second salt storage facility at the Public Works Facility location where salt will be stored in a separate building year round. WATER DIVISION CIP:FY 18/19 Rgguested Project Narratives Project: Water Meter Replacement Priority Ranking: A Funding Request: FY18/19 I FY19/20 I FY20/21 I FY21/22 I FY22/23 Total 1 $410,0001 $100,0001 $50,000 1 $50,000 1 $50,000 1 $660,000 Funding Source(s): FY18 19 FY1 9/20 FY20/21 FY21/22 FY22/23 Total Water/Sewer $410,000 $100,000 $50,000 $50,000 $50,000 $660,000 Revenues "'I In December 2001, the City began installing Badger Meter "Trace" transponders which had a 10 year battery life expectancy, and allowed the meters to be read via radio technology (drive-by). In 2006, Badger Meter discontinued "Trace" and produced "Orion" which is still a "drive-by" technology, but with a greater battery life expectancy of 20 years. Trace units have reached and are surpassing their battery life expectancy. There are approximately 1,350 "Trace" units remaining in circulation. To date in the past year (2017) approximately 700 units will have been changed out. The cost per unit (3/4") meter is between $1604225. Of the 1,350 meters to be changed 233 are large meters and account for approximately $148,000 of the $410,000 requested. In January 2014 the USEPA amended the Safe Drinking Water Act (No Lead Law) as it relates to lead in manufactured brass products. It has in effect made the rebuilding of the meter bases not feasible until the old bases containing higher amounts of lead are changed out. Along with transponder change outs, it will be necessary to replace the meter bases when required. It is Staff's recommendation to increase funding in FY18/1.9 through FY19/20. It is anticipated with funding, that the "Trace" transponders will be changed out by FY19/20. Meters currently in the system that are "Orion" will need to be tested and replaced as necessary following years FY20/21-FY22/23. Project: Well #8 Raw Water Line Rehabilitation Priority Ranking: A Funding Request: I FY18/19 I FY19/20 FY20/21 FY21/22 FY22/23 Total 1 $220,0001 $220,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total Water/Sewer Revenues $220,000 $220,000 � KIP c '110---cl "i If ." . - - �n,� Z`11. Well #8 is one of two wells that supply raw water to Water Treatment Plant U. WTP#3 is located at Crystal Lake Road and Malibu Court. The well, however is located approximately 2 blocks away in the Malibu "Tot Lot". The well was drilled and raw water piping installed to WTP#3 in 1985. During the past decade the raw water line has experienced several leaks. A galvanized nipple and a galvanized plug have been replaced on the pitless adaptor at the well. The raw water line has experienced pinhole leaks on most of the cast iron fittings connecting the sections. In an effort to understand why this was continuing to happen, an electrician was brought in as well as a representative from the Ductile Iron Pipe Research Association, or DIPRA. No conclusive cause could be given for the unusual amount of leaks. A new technology to rehabilitate a watermain is pipe lining. The process involves a fibrous liner to be pulled through the pipe and with hot water expand to conform to the "host" pipe. The material must be a National Sanitation Foundation (NSF) approved and become structural in order to withstand system pressures. Estimates for pipe lining are $220,000 and $300,000 for traditional open cut method. This is very similar to sanitary sewer "slip lining" which has been used in City projects previously with great success. Project: Well Inspection/Maintenance & Repair Priority Ranking: A Funding Request: FY18/19 1 FY19/20 I FY20/21 FY21/22 I FY22/23 'total 30,000 1 $30,0001 $30,000130,000 30,000 150,000 Funding Source(s): FY18/19 FYi9/20 FY20/21 FY21/22 FY22/23 Total Water/Sewer $30,000 $30,000 $30,000 $30,000 $30,000 $150,000 Revenues �,.. ,:.:i.:.................•... ....I.. . ,.. ...:..fit ..._.. . .:.i.ii.....\....i.:,.f.:.. ... t.T:.-.1.t::'.-- - :::.,,.Yt.[._....,-...:.:...:..........I. it...... :::. r. .•. ,. . •. ail.. —'_b: .,� r i io }':- ct os Des t - In 2005 the City began a yearly testing and inspection program of each City well. The program was started to aid in indentifying wells that were in need of pumping equipment or well repair. The tests performed outline the original specific capacity (well production) to current specific capacities, which aid in determining what wells should be targeted for rehabilitation. Other electrical tests are performed in an effort to anticipate motor failures, and enable "scheduled" shut downs for these wells. Water Well Solutions used the high rate injection process (Hy-RIP) to rehabilitate the wells 2, 3, 5, 6, 8, 9. This process injects high rates of National Sanitation Foundation (NSF) approved chemicals into the well, removing any mineral and biological buildup which enables additional water production capacity in the well. The "Hy-Rip" process has been successful. Well #7 has the oldest pumping equipment and has not been rehabbed using the "Hy-Rip" process. Barring unforeseen circumstances well #7 should be considered in the next couple of years for rehabilitation. Performance testing should continue to best determine which wells need attention, Project: Water Treatment Plant #4 Maintenance Priority Ranking: A Funding Request: FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total $25,000 $25,000 Funding Source(s): FY118/19 FY19/20 FY20/21 FY21/22 FY22/23 Total Water/Sewer $25,000 $25,000 Revenues .............. ............ epp FY17/18-WTP #4 Control Panel After discussions with our control support engineers, it was determined that a partial upgrade to the Control Panel is the most cost efficient path to fully upgrading the panel. This will allow for the newest Programmable Logic Controller (PLC) to be included while utilizing the majority of other components within the panel. As needed those components can be retrofitted in the future. By upgrading the control panel sooner than later the City can avoid a major control failure before the current PI-Cs are antiquated and not available for replacement. 2016 estimates are $25,000. Project: SCADA Server Upgrade Priority Ranking: A Funding Request: FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total 40,000 40,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total Water/Sewer $40,000 $40,000 Revenues t:..:.::: :......,t,.. •, :::..:..:,...::;:,..: rose _Desch - i - .tton;and� enefi In 2003, the City upgraded the Water Systems Supervisory controls, The new technology, Supervisory Control And Data Acquisition (SCADA) system is responsible for monitoring the current state of operation; it allows viewing of security status, wafer tower levels, and pumping flow rates, alarm status and acknowledgement of alarm call-outs, turning water treatment plants on and off, etc. It is also responsible for storing the daily and statistical data. The server is 8 years old and in the ever changing technology industry a planned upgrade is needed. A major emphasis on cyber security should be considered as part of the upgrade. There is new technology that is available to ensure the security of the City's water system and prevent a "breach" or "hack". Discussions with the control engineers and possible upgrades estimates are 30K-40K. The different design possibilities and security levels included are reflected in the estimated costs. Project: Water Tower Maintenance & Repair Priority Ranking: A Funding Request: FY18/19 I FY19/20 FY20/21 FY21/22 FY:2:2::/2=3 Total $500,0001 1 $500,000 Funding Source(s): FY1 8/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total Water/Sewer Revenues $500,000 $500,000 P rd A eSaO"M611V11.!-0 1-6x. Tower #4 was built in 2006 and in 2013 the exterior need to be "touched up" due to areas of delaminating top coat. This most likely will continue in future years leading up to the repainting process. The inspection report from August 2014 concluded the following; the overall exterior condition was good, with continued delaminating of the top coat. The dry interior above the first floor deck was in fair condition, with signs of rusting and the wet interior was in good condition. Staff recommends a follow up inspection in FY18 to reassess the overall condition of the tank. Due to the premature coating failures that are currently visible staff is recommending repainting of Tower #4 in FYI 8/19. Project: Water Division -Motor Pool Replacement Priority Ranking: B Funding Request: FY21/22 I F:Y:2�:2=/23 Total FY18/19 I FY19/20 I FY20/21 $45,000 1 $35,0001 $35,0001 $30,0001 $145,000 1 Funding Source(s): FY18/19 , FY19/20 FY20/21 FY21/22 FY22/23 Total Water/Sewer Revenues $45,000 $35,000 $35,000 $30,000 $145,000 Dks,' rip.10M 0-10. The purpose of this project request is for the replacement of Water Division motor pool vehicles. Vehicles proposed for replacement throughout the 5-year CIP planning period are as follows: FY1 8/19 - 2002 Chevy C2500 Duramax w/Utility Box and Lift Gate FY1 9/20-2003 Chevy Express Van (Meter Van) FY20/21 - 2009 Dodge Durango FY21/22- 2010 Chrysler/Dodge Caravan (Operator Vehicle) Project: Update Master Utility Plan Priority Ranking: B Funding Request: FY18/19 FY19/20 FY20/21 FY21/22 FY22/23:ETotal $50,000 $50,000 Funding Source(s): FY18/19 FYI 9/20 FY20/21 F 21/22 FY22/23 Total Water/Sewer $50,000 $50,000 Revenues N10019M. A comprehensive Master Utility Plan for Water, Wastewater, and Storm Water was completed in 1966, 1989 and updated in 1994. In 2007 a Water/Sewer Model Report was completed which considered existing distribution and collection system needs coupled with future development, within the Facility Planning Area (FPA) boundary. The need to bring all the information together in one updated Master Utility Plan would serve to prioritize future projects and objectives in current and future time tables. WASTEWATER DIVISION CIP: FY 18ZI9 Requested Project Narratives Project: Willow Lift Station Pump Replacement Priority Ranking: A Funding Request: FY18/19 FY19/20 FY20/21 I FY21/22 FY22/23 Total 40,000 $40.0001 Funding Source(s): FY18/19 FYI 9/20 FY20/21 PY21�/22'0 FY22/23 Total 40,000 140.0001 ro ctP . . ....:... ..... .•,:.,,,:,_.:.r.,_...:...... , L.._: .:..._ . s. ., .:.. ::es, ion :and,.,Benefit�r,. �.-�� ;..... The purpose of this project is to replace the raw sewage pumps at the Willow Ave Lift Station. The Willow Avenue lift station was put into service in 1973 and services the Lakeland Park subdivision. The original Aurora brand pumps are still in use today. Preventive maintenance has been done regularly and necessary repairs have been made to keep the pumps running for the past 44 years. The pumps have reached the end of their serviceable life and are in need of a complete rebuild or replacement. To rebuild the current Aurora pumps would cost $51,313. Several of the parts are no longer in stock and would have to be custom made. The cost to replace the pumps with brand new Flygt pumps is $40,000. Project: Millstream Lift Station Rehabilitation & Sewer Main Relocation Priority Ranking: A Funding Request: FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total $1,900,000 1,900,000 Funding Source(s): FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total Water / Sewer $ 1,900,000 $1,900,000 Revenues ......._.,. ..._ .:. ............ ..,_., 1 , ..:-.... , +,.......,,......:,,. .,,,:, 1.%i - i r.- e.and B Rio -t The project purpose is to eliminate one lift station and relocate a sewer main. This will be accomplished by relocating and increasing the size of the Millstream Ave Lift station. Once this is done the Freund Ave Lift stations' flow will be diverted to the new lift station. This will eliminate one lift station, two pumps and all of the controls necessary to operate it. Another component of this project is to relocate the existing sewer main, which runs under 3705 W. Elm St and then along Boone Creek. The existing main is in poor condition and will need to be replaced/relocated prior to development occurring along Boone Creek. This project was conceived and originally engineered in 2008, Several engineering/design items will need to be updated. Also some additional testing needs to be done due to new requirements. The cost for this additional work and construction observation has been included in the total. Project: CWWTP Demolition Funding Request: A FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total $2,250,000 2,250,000 Pro ect; =ur ose Descr ion; n : - fit; >:- -:; a ..:,.:.}:I:._ :f::.,;l:n:;f.:'i_rt•,,,:.a:1n:.:.,.cs:yc _ \r h'H -- .. .... ,.{. .. .......... ...:':.:..: , _. . .:: ) .. _ ....... :. ..:.. '::.}'.:.'%Ji1 e The purpose of this project is the demolition of the Central Wastewater Treatment Plant (CWWTP). Per the Illinois Environmental Protection Agency (IEPAj regulations the CWWTP cannot be demolished until.1 year after the new South Wastewater Treatment Plant is finished and running in compliance. However, please note, there is no required timeline by which the facility must be demolished and it is hoped that this would coincide with private redevelopment of the site. Once demolition begins, all buildings will have to be removed. All in-ground and above ground concrete tanks will need to be removed and filled in, In addition,all old piping, air lines and electrical lines will need to be removed as well. The Engineer's Opinion of Probable Cost of this project is $1.75 to$2.25 million. On March 3rd,2014 City Council approved a professional services agreement with H.R. Green in an amount of $1,325,188. Of that $20,000 has been earmarked for CWWTP demolition engineering. Project: Sewer Division-Motor Pool (Replacement) Priority Ranking: Funding Request: B FY18 19 FY19/20 I FY20/21 I FY21/22 I FY22/23 Total $65,000 $115,000 1 $150,0001 $15,000 1 $10,000 1 $355,000 1 Funding Source(s): Water/Sewer FY18/19 FY1 9/20 FY20/21 FY21/22 PY22/23 Total Revenues $ 5,000 $115,000 $150,000 $15,000 $10,000 $355,000 .................. The purpose of this project request is for the replacement of Sewer Division motor pool vehicles. Proposed for FY 18/19 is the replacement of pickup truck #626, a 2002 Chevy Silverado,with a snowplow and trailer hitch mounted salt spreader. Toolbox and strobe lights to be included with the purchase of the vehicle. Vehicles proposed for replacement throughout the remainder of the 5-year CIP planning period are as follows: FY 19/20-Pickup Truck #623 & Pickup Truck 4625 FY 20/21-Replace dump truck #633 with a 10 wheel dump truck FY 21/22-Replace #622 John Deere Gator FY 22/23-Replace #650 safety trailer Project: Rebuild clarifier gearbox and manifold seals Clarifier#3 & #4 @ SWWTP Funding Request: FY23/24 FY24/25 FY25/26 FY26/27 FY27/28 Total $25,000 $25,000 a ... .:..:............:_. :::.,;::.:.,:.:,:.z::r::.,:.._:; ; ., ':.D.. O Oh q�'1C�•r'Be tt �;.::���;<•....... :....:._:.,,:: ,., .Pro ec�,,Pur .ose Ir The scope of this project includes rebuilding the intermediate drive gearboxes and replacing the manifold seals on clarifiers # 3 & #4. This requires draining each clarifier and keeping it empty for the week the work is being done. Each clarifier should take 3-5 days,These are normal wear items and this work needs to be done periodically. The benefit to doing this in a planned manner instead of waiting until they break is that we are able to schedule the work when it is most convenient for us. This in turn aids in the operation of the treatment plant as well. Project: Replace / Upgrade Back-up GBT (Gravity Belt Thickener) Funding Request: FY23/24 I FY24/25 FY25/26 FY26/27 FY27/28 Total $285,0001 $285,000 : -- :r ene � The purpose of this project is to replace and upgrade the smaller back-up gravity belt thickener (GBT). This piece of equipment was purchased new in 1998. The GBT begins the sludge de-watering process. It is used to thicken up the sludge before it is finally pressed and dried. The project would consist of replacing the current GBT with a larger model. Upgrading this piece of equipment would mean the plant could continue to de-water sludge at an acceptable rate even if the main GBT was down for maintenance or repair. Currently we would need to work in shifts or work overtime to keep up with the normal production. Project: Update aeration & mixing on oxidation ditches at SWWTP Funding Request: FY23/24 1 FY24/25 FY25/26 FY26/27 FY27/28 Total $750,0001 $750,000 - se -This project will update the aeration and mixing systems on the oxidation ditches at the SWWTP. Currently the method of aerating and mixing the oxidation ditches is with large inefficient mechanical mixers. There is little or no control on this set up. The project would consist of installing blowers and fine bubble diffusers, similar to what is currently used in the digesters, and submersible mixers. These two components will allow for more accurate control over the treatment process. This in turn will help the plant to run efficiently and in a cost effective manner. Project: Lift Station Generators Funding Request: FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 Total 1250,0001 $250,000 N{ The purpose of this project is to install a permanent emergency back-up power generator at the Broadway Ave Lift Station and the South Riverside Dr. Lift Station so they can continue to operate seamlessly in a power outage. The generators would be natural gas powered units with sound attenuation and sized to sufficiently handle the electrical load. Currently the only source of electricity for these lift stations during a power outage are portable generators. When a power outage occurs an operator must be called in to access the situation and tow a generator to the lift station and hook it up. Often during a power outage there are multiple lift stations and possibly treatment plants that are without power. It could potentially take the operator an extended amount of time to get the power resupplied to these two lift stations. By installing permanent generators at these two lift stations the City can be assured that the residents are much less likely to experience a sanitary sewer back-up in their home. Project: Automation of Lift Station Generators Funding Request: FY18/19 FYI 9/20 FY20/21 FY21/22 FY22/23 Total $35,000 t ut`. - tPu 0 Fifteen (15) of the City's nineteen (19) lift stations have emergency power generators. Central Wastewater Treatment Plant (CWWTP) and South Wastewater Treatment Plant (SWWTP) also have emergency power generators. These generators are run, or exercised once a month. Currently a wastewater division employee spends approximately 2.5 days a month starting, transferring power and then shutting down the generators. By adding components to the generator and lift station control panels would allow the generators to start and run on an automatic program. Automating the generators will enable a wastewater employee to spend 2.5 days a month on other important projects. WATER CIP: Years 6-10 Project Narratives Project: Water Tower Maintenance & Repair Funding Request: FY23/24 I FY24/25 FY25/26 FY26/27 FY27/28 Total 500,000 $500.000 Water Towers #l, #2, #3, #4 were comprehensively inspected between April 2013 and August 2014. The inspections included Remote Operated Vehicles (ROV) in the "wet" interior; videos of the inspections are on file. A 20 year life expectancy for tower coatings is an industry standard. The towers will be listed below in order of expectation of maintenance and repairs. Tower#4 was built in 2006. In 2013 the exterior need to be "touched up" due to areas of delaminating top coat. This most likely will continue in future years leading up to the repainting process. The inspection report from August 2014 concluded the following; the overall exterior condition was good, with continued delaminating of the top coat. The dry interior above the first floor deck was in fair condition, with signs of rusting. The wet interior was in good condition. Staff recommends a follow up inspection in FYI to reassess the overall condition of the tank. Due to the premature coating failures that are currently visible, staff is recommending repainting of Tower #4 in FYI 8/19. Tower #1 was built in 1960; in 2002 the tower was sandblasted and completely repainted. In August 2014 a comprehensive inspection revealed the coatings to be in good condition at the 12 year point. A subsequent inspection in FY19/20 should be completed to better assess the coating conditions and time line for repainting. The 20 year standard would be reached in FY22/23, reflected above. Should all the recommendations be followed, estimates for the project in 2014 dollars are $273,000. Tower #2 was constructed in 1985; a complete repainting was completed in 2008. The inspection completed in 2014 concluded that the tank was in good condition overall. Another inspection should be completed in FY19/20. Tower #3 was repainted in 2016 at a cost of $286,400. The wet interior was sandblasted and completely coated. The exterior was pressure washed and spot power tool cleaned and recoated. An inspection should be completed in FY21/22 Project: Wafter Treatment Plant #3 Rehabilitation Priority Ranking: D Funding Request: FY23/24 FY24/25 FY25/26 FY26/27 FY27/28 Total 50,000 $2,500,000 $2,550,000 r1< _4r«. NNW. ur ose . sc' n:an - �- .:.._.:. ...:.:.:.,:,_:- ..11' t fro d,. .e Water Treatment Plant #3 was constructed in 1986. It treats raw water from Well #7& Well #8. The filter media was replaced in 2000. A major overhaul of the filter is anticipated within the next 10 years, The treatment facility should be evaluated to aid in the decision to overhaul or replace the filter. The City has rehabilitated two treatment facilities; Plant #1 in 2005 and Plant #2 in 2012. Both plants currently utilize "gravity" filtration. This form of filtration has proven to increase filter runs times and water quality. booking forward, an in depth assessment will be need to determine the course of action, Staff suggests assessment and design of "WTP#3 Rehab" in FY25/26 Project: Water Treatment #5 Development (Legend Lakes) Funding Request: ��/24 FY24/25 FY25/26 FY26/27 FY27/28 . FY18/19 $4,100,000 $4,10D,000 Sci;t .......::. . : On September 6, 2006 the City Council approved an engineering services agreement with Smith Engineering Consultants. SEC's agreement was to provide construction documents consisting of plans and specifications for the construction of a new water treatment facility for Well #12 and Well #13, approximately 1,400 lineal feet of new finished water piping from the new facility to Farmstead Drive, and selection of submersible-type well pump and controls for Well #13. The new facility will be designed to remove barium and radium from the raw water of Well #13 and iron from the raw water of Well #12. The new treatment facility will utilize ion exchange to treat/remove the barium and radium from the 1,200 gpm from Well #13 and aeration/filtration to treat/remove iron from the 500gpm from Well #12. The new treatment facility will be housed in a new building that will architecturally resemble the fire house that was constructed to the east and include backwash retention, brine storage, chemical treatment systems, clear well, high service pumps, 1/2 bathroom, basic laboratory, dehumidifier, generator, transfer switch, instrumentation, controls and necessary apparatus. Due to the economic downturn, the Capital Development Fund cannot support the construction of WTP #5 at the present time. Expansion of the City's water system, as in the past, will be driven by current and future development. New construction cost estimates should be obtained at least two years prior to actual construction. Project: Water Treatment Plant #6 Development (Adams Industrial Park) Funding Request: ��/24 FY24/25 FY25/26 FY26/27 FY27/28 Total 25,000 $2,700,000 $2,725,000 . .:_- rf:'t se es do .., .......:... t.: � cry t�,;a d y.: .... ..:::.:._:.n:::........ ...........,..:.it t:t.:.. ......iM1t.......:.:.:.r On February 18, 2002 the City Council approved an Engineering Services Agreement with Baxter & Woodman to design Water Treatment Plant #6. This treatment facility would treat a total of 1000 gpm, supplied from two 500 gpm shallow wells, Well #11 located at the Water Tower #3 site, and a future well. The need for the expansion was documented in a 1994 Update to the Utility Master plan. Subsequently in a letter from the City to Baxter & Woodman dated May 4, 2005, the City terminated the agreement with Baxter & Woodman. The reason for terminating the agreement was that the water system demonstrated a greater demand on the west side of the City, as that was the area of greatest development. WTP #6 was never "completely" finished with the design phase. For this reason, funds outlined in FY20/21 ($25,000) are to be used to complete the design. Some questions remain and will need to be addressed for the design to be completed. Construction costs outlined in FY21/22 are old and will need to be adjusted once the design has been fully completed. Project: Well #14 (Liberty Trails) & Raw Water Line to Plant #6 (Adams Industrial Park) Funding Request: ��/24 FY24/25 FY25/26 FY26/27 FY27/28 Total 950,000 $950,000 rpqpa Pro e j. : e The City conducted a test well program in the fall of 1997, concluded in the spring of 1998. One site was determined to have the possibility to produce 455 gpm. The site at that time was known as the Diedrich Property, now known as the Liberty Trails Subdivision. Depending on the construction of WTP #6, a raw water line would need to be installed from Liberty Trails to the treatment plant site located in Adams Commercial Center, Water Tower #3, and Well #11 sites. This project will need to be revisited for its true cost and feasibility.